短線匹配法節(jié)段箱梁施工技術(shù)應用研究
[Abstract]:Short-line matching section box girder construction technology is a relatively new construction technology in recent years. It was first used in Sutong Yangtze River Highway Bridge in China in 2003. The technology has the advantages of rapid and flexible prefabrication schedule, high degree of mechanization and automation, and can save a lot of manpower and material resources. At the same time, because each segment is 2-5m long, there is no need for huge prefabricated space. Minimize the impact and damage caused by construction. In the construction of bridges abroad, the technology has been relatively mature. In the domestic aspect, the improvement and innovation of site construction of the major bridges, such as Sutong Yangtze River Highway Bridge, Xiamen Jimei Bridge, Chong Qi Yangtze River Highway Bridge and Nanjing Yangtze River fourth Bridge, were carried out in China. The construction technology of short-line matching segmental box girder is becoming more and more mature. In this paper, the construction technology of box girder with short-line matching method is comprehensively analyzed and studied based on the engineering example of the fourth Nanjing Yangtze River Bridge. The main contents are as follows: the process principle of segment box girder construction by short-line matching method, the construction technology and process of segment box girder prefabrication and the problems needing attention in the construction process, the process monitoring of short-line matching method during prefabrication and installation of segmental box girder, and the construction process monitoring of segment box girder by short-line matching method. The design and whole assembly of bridge erecting machine, the construction technology and procedure of segmental box girder installation and the problems that should be paid attention to in the course of construction. Finally, the advantages and disadvantages of the short-line matching segmental box girder construction technology are summarized, and the application scope and the future development prospect of the technology are prospected.
【學位授予單位】:山東大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U445.4
【相似文獻】
相關(guān)期刊論文 前10條
1 李冰;淺談首體橋箱梁施工[J];北京水利;2000年02期
2 黃東青,利矛,祝鶴;淺談大跨度預應力混凝土箱梁施工中的若干技術(shù)問題[J];華南建設(shè)學院西院學報;2000年03期
3 程灝;;30m跨連續(xù)彎箱梁施工技術(shù)[J];貴州工業(yè)大學學報(自然科學版);2008年01期
4 鄧敏;;高速公路箱梁施工工藝及質(zhì)量控制分析[J];科技資訊;2010年24期
5 李世龍;;電液比例控制技術(shù)在大型箱梁施工設(shè)備中的應用[J];建設(shè)機械技術(shù)與管理;2011年02期
6 丁國志;;論30米箱梁施工常見通病及預防[J];黑龍江科技信息;2011年09期
7 萬智勇;;鋼箱梁施工中質(zhì)量控制方法研究[J];筑路機械與施工機械化;2011年07期
8 尚鵬臻;邱巍;;淺談鋼箱梁施工過程的控制[J];公路交通科技(應用技術(shù)版);2011年10期
9 王江水;;對預制砼箱梁施工工藝的探討[J];科技創(chuàng)新導報;2012年07期
10 汪晨;;淺談冬季箱梁施工的質(zhì)量控制[J];科技致富向?qū)?2013年06期
相關(guān)會議論文 前9條
1 王剛;黃成;;現(xiàn)澆預應力混凝土箱梁施工[A];土木建筑學術(shù)文庫(第15卷)[C];2011年
2 張建彬;王運震;;后張法預應力混凝土箱梁施工技術(shù)[A];土木建筑學術(shù)文庫(第8卷)[C];2007年
3 阮新偉;王克文;;軌道交通大興線工程鋼箱梁施工技術(shù)[A];'2011全國鋼結(jié)構(gòu)學術(shù)年會論文集[C];2011年
4 鄭亞男;吳紀東;;分段張拉曲線橋箱梁施工技術(shù)[A];河南省土木建筑學會2009年學術(shù)年會論文集[C];2009年
5 郜振宇;孫曉軍;萬巍;;鋼箱梁施工中的吊裝及測控技術(shù)[A];全國城市公路學會第十七屆(2008)學術(shù)年會論文集[C];2008年
6 張仁峰;劉洪成;;淺談混凝土預制箱梁施工中常見的質(zhì)量缺陷及其防治措施[A];建設(shè)工程理論與實踐(第二輯)[C];2005年
7 王振玲;董佳節(jié);秦樹東;;京承高速跨三環(huán)鋼-砼組合曲線箱梁施工技術(shù)[A];施工機械化新技術(shù)交流會論文集(第六輯)[C];2005年
8 廖卓清;林榮有;;洛溪大橋箱梁施工撓度觀測和標高控制[A];'95預應力混凝土連續(xù)梁和剛構(gòu)橋?qū)W術(shù)會議論文集[C];1995年
9 李杰;王嘉謙;王少峰;楊振東;;天津西站跨鐵路上客高架橋鋼箱梁施工技術(shù)[A];中國建筑學會建筑施工分會、中國工程機械工業(yè)協(xié)會施工機械化分會2012年會暨機械化施工新技術(shù)經(jīng)驗交流會會刊[C];2012年
相關(guān)重要報紙文章 前1條
1 記者 王立武 通訊員 產(chǎn)運節(jié) 徐娜;率先完成箱梁施工[N];中國鐵道建筑報;2008年
相關(guān)碩士學位論文 前2條
1 彭群興;復雜環(huán)境下新光快速路南洲立交橋鋼箱梁施工方案的風險研究[D];西安建筑科技大學;2015年
2 張校昌;短線匹配法節(jié)段箱梁施工技術(shù)應用研究[D];山東大學;2015年
,本文編號:2455466
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2455466.html