在役斜拉橋時效風險分析
[Abstract]:During the bridge operation, in addition to bearing all kinds of design loads, it also faces the influence of time-related uncertainties such as environmental erosion, over-designed traffic and overloading vehicles, material aging and so on, which will lead to the gradual degradation of structural resistance. It may further lead to security risks. In the event of an accident, it is possible not only to cause safety losses, but also to bring about significant economic losses. If the bridge disease can be predicted accurately and the maintenance measures can be taken in advance, not only the catastrophic loss can be avoided, but also the major repair and construction will be avoided. This will undoubtedly achieve the best effect in safety and economy. Therefore, it is of great theoretical and practical value to correctly predict the risk status of bridge operation period. This paper studies the time-effect risk of cable-stayed bridge in service from the angle of risk analysis, resistance degradation and so on. The main contents are summarized as follows: 1) the concept of limitation risk and the theoretical framework of limitation risk analysis of cable-stayed bridge in service are put forward, and its basic analysis process is given. 2) based on the analysis of shrinkage, creep and vehicle load, the time-risk probability of cable-stayed bridge in service is studied, and the quantitative and qualitative methods are used to estimate the time-dependent risk loss. 3) put forward the evaluation principle and criterion of the limitation risk evaluation of the cable-stayed bridge in service, and put forward the corresponding measures to deal with the time-effect risk; 4) the aging degradation of steel structural members, cable members and reinforced concrete is studied, and the corresponding theoretical formulas of resistance degradation are deduced. 5) based on the time-dependent risk analysis theory proposed in this paper, the performance of the Sutong Bridge during the normal period of operation is analyzed and predicted, and the variation rule of the time-effect risk of the bridge during the operation period is obtained. At the same time, the control measures should be taken in the corresponding key risk stages.
【學位授予單位】:東南大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U448.27
【相似文獻】
相關期刊論文 前10條
1 趙俊豪;科研計劃的風險分析與預測(下)[J];航天工業(yè)管理;2000年11期
2 王繼光;李補喜;;價值鏈風險分析及其對策探討[J];科技與管理;2009年03期
3 徐祖信;郭子中;;二灘水電站泄洪消能布置方案的風險分析[J];河海大學學報;1990年02期
4 周衛(wèi)紅;風險分析在工業(yè)安全管理中的應用[J];電力安全技術(shù);2000年03期
5 付軍明;巴可偉;屈波;蘭志雄;崔艷麗;;高速公路的風險分析與對策研究[J];中外公路;2010年01期
6 吳東輝;;我國輸歐盟節(jié)日燈串風險分析[J];電子世界;2013年05期
7 彭寶玲;高云濤;潘郁;;我國建筑行業(yè)ERP風險分析及實施戰(zhàn)略[J];商業(yè)時代;2007年22期
8 賀昌海;楊進;;河道截流風險分析概述[J];法制與社會;2008年12期
9 楊旭中;;關于風險分析的幾點認識[J];電力勘測設計;2009年01期
10 朱毅麟;航天系統(tǒng)快速風險分析法[J];中國空間科學技術(shù);1993年04期
相關會議論文 前10條
1 劉巖;;原料奶企業(yè)的質(zhì)量風險分析及管控思路[A];第三屆中國奶業(yè)大會論文集(下冊)[C];2012年
2 王晶;張金隆;;建筑行業(yè)信息化風險分析[A];第11屆海峽兩岸信息管理發(fā)展策略研討會論文集[C];2005年
3 楊東升;苗永強;;改進模糊Borda法在風險分析過程中應用研究[A];2012年中國航空學會管理科學分會學術(shù)交流會論文集[C];2012年
4 黃崇福;楊軍民;龐西磊;;風險分析的主要方法[A];“中國視角的風險分析和危機反應”——中國災害防御協(xié)會風險分析專業(yè)委員會第四屆年會論文集[C];2010年
5 張駿;姜江;楊克巍;陳英武;;北斗衛(wèi)星導航系統(tǒng)組網(wǎng)發(fā)射方案風險分析[A];中國系統(tǒng)工程學會第十八屆學術(shù)年會論文集——A12系統(tǒng)科學與系統(tǒng)工程理論在各個領域中的應用研究[C];2014年
6 任魯川;;區(qū)域災害合成風險分析的原理與方法初探[A];全國突發(fā)性地質(zhì)災害應急處置與災害防治技術(shù)高級研討會論文集[C];2010年
7 朱秀軍;邢明利;謝小兵;;施工階段風險分析與防范[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2008)[C];2008年
8 ;中國災害防御協(xié)會風險分析專業(yè)委員會簡介[A];中國災害防御協(xié)會——風險分析專業(yè)委員會第一屆年會論文集[C];2004年
9 田靜;黃崇福;;自然災害風險分析的形態(tài)發(fā)生估計方法[A];風險分析和危機反應的創(chuàng)新理論和方法——中國災害防御協(xié)會風險分析專業(yè)委員會第五屆年會論文集[C];2012年
10 李熠;李桂芬;趙靜;;芻議風險分析的基本內(nèi)容和我國蜂產(chǎn)品安全[A];2007年全國蜂產(chǎn)品市場信息交流會暨中國(桂林)蜂業(yè)博覽會論文集[C];2007年
相關重要報紙文章 前10條
1 何菁 萬軍;信貸支持農(nóng)民購建房的難點和風險分析[N];中國城鄉(xiāng)金融報;2013年
2 江蘇省常州市國稅局 張U,
本文編號:2442551
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2442551.html