發(fā)布時間:2019-02-16 22:02
【摘要】:針對極淺埋富水砂層地鐵隧道橫通道可能出現(xiàn)的施工安全問題,采用室內(nèi)實驗、理論分析及數(shù)值模擬的方法,對隧道進行注漿加固試驗及開挖工法的優(yōu)選,提出一套適用于淺埋富水砂層橫通道的注漿加固工藝及開挖工法。認為注漿加固可有效提高砂層的物理力學(xué)參數(shù)和土體力學(xué)性能;支護時間越遲,圍巖變形越大,預(yù)加固可有效提高圍巖的物理力學(xué)參數(shù),降低圍巖變形,改善地層的應(yīng)力—應(yīng)變關(guān)系;對臺階法與CRD(交叉中隔墻法)法開挖后拱頂沉降、應(yīng)力及塑性區(qū)分布特征進行了對比分析,通過現(xiàn)場開挖監(jiān)測量控與數(shù)值分析的對比,驗證了該工藝的可行性,該研究可為類似工程提供一定的借鑒和指導(dǎo)作用。
[Abstract]:In view of the possible safety problems in the cross passage of the underground tunnel in the extremely shallow water-rich sand layer, the method of laboratory experiment, theoretical analysis and numerical simulation is adopted to carry out the grouting reinforcement test and the optimization of the excavation method for the tunnel. This paper presents a set of grouting reinforcement technology and excavation method suitable for cross passage of shallow water rich sand layer. It is considered that grouting reinforcement can effectively improve the physical and mechanical parameters of sand layer and the mechanical properties of soil. The later the supporting time, the bigger the surrounding rock deformation. Pre-reinforcement can effectively improve the physical and mechanical parameters of the surrounding rock, reduce the surrounding rock deformation, and improve the stress-strain relationship. The characteristics of settlement, stress and plastic zone distribution of arch after excavation by step method and CRD method are compared and analyzed. The feasibility of this process is verified by comparison of field excavation monitoring quantity control and numerical analysis. This study can provide some reference and guidance for similar projects.
【作者單位】: 中鐵工程設(shè)計咨詢集團有限公司;山東大學(xué)巖土與結(jié)構(gòu)工程研究中心;
【分類號】:U231.3;U455.4
本文編號:2424878
[Abstract]:In view of the possible safety problems in the cross passage of the underground tunnel in the extremely shallow water-rich sand layer, the method of laboratory experiment, theoretical analysis and numerical simulation is adopted to carry out the grouting reinforcement test and the optimization of the excavation method for the tunnel. This paper presents a set of grouting reinforcement technology and excavation method suitable for cross passage of shallow water rich sand layer. It is considered that grouting reinforcement can effectively improve the physical and mechanical parameters of sand layer and the mechanical properties of soil. The later the supporting time, the bigger the surrounding rock deformation. Pre-reinforcement can effectively improve the physical and mechanical parameters of the surrounding rock, reduce the surrounding rock deformation, and improve the stress-strain relationship. The characteristics of settlement, stress and plastic zone distribution of arch after excavation by step method and CRD method are compared and analyzed. The feasibility of this process is verified by comparison of field excavation monitoring quantity control and numerical analysis. This study can provide some reference and guidance for similar projects.
【作者單位】: 中鐵工程設(shè)計咨詢集團有限公司;山東大學(xué)巖土與結(jié)構(gòu)工程研究中心;
【分類號】:U231.3;U455.4
【相似文獻】
相關(guān)期刊論文 前7條
1 袁輝;袖閥管注漿加固深層土技術(shù)[J];市政技術(shù);2005年06期
2 周滿興;;淺談巖溶注漿的施工工藝[J];上海鐵道科技;2011年04期
3 徐京海;;淤泥質(zhì)黏土地基注漿加固效果的研究[J];鐵道建筑技術(shù);2014年06期
4 曹德更;;地鐵暗挖車站下穿橋梁基礎(chǔ)施工工法探究[J];城市道橋與防洪;2014年05期
5 吳縣榮;;滬昆高鐵巖溶路基注漿加固和檢測技術(shù)分析[J];山西建筑;2014年08期
6 劉洋;;運營鐵路病害路基的注漿加固[J];四川建筑;2008年03期
7 ;[J];;年期
相關(guān)碩士學(xué)位論文 前2條
1 李若飛;地基注漿加固法在地鐵盾構(gòu)施工中對減少建筑物沉降的研究[D];內(nèi)蒙古科技大學(xué);2015年
2 李凌冬;杭長客運專線覆蓋型巖溶路基注漿加固效果檢測與穩(wěn)定性分析[D];西南交通大學(xué);2014年