自錨式懸索橋施工過程與控制研究
[Abstract]:The suspension bridge structure has the characteristics of good mechanical performance, large span ability, light and beautiful, strong seismic ability, various forms of structure and good ability to adapt to the topography, etc., when many traffic obstacles such as big rivers, mountain canyons, gulf ports and other traffic obstacles are crossed, Often as the preferred bridge type. However, the conventional ground anchor suspension bridge needs to build a large volume of anchor ingots to anchor the main cable, which results in a very large amount of foundation works of the anchor ingot structure, which often becomes a difficult point in the engineering where the geological conditions are poor. Anchorage ingot and anchor ingot foundation of ground anchor suspension bridge occupy a large part of project cost, and become important factors that affect the structure economy of suspension bridge. In urban areas or tourist areas, the construction of large anchor ingots can also have a negative impact on environmental beauty. Therefore, in some places where the span requirement is not too large, the self-anchored suspension bridge scheme has become a competitive bridge scheme because of its novel structure and beautiful appearance. In view of the rapid development of self-anchored suspension bridges in China and the large number of design and adoption, as well as the lag in research, this study will deeply study several key technologies in the construction process of self-anchored suspension bridges. To fill in the blank of construction control theory and method of self-anchored suspension bridge in this area, and improve the design theory and construction method of self-anchored suspension bridge in China. The main contents of this study are as follows: the theory and method of nonlinear analysis of suspension bridge, the key technology of cable-strut erection and the key technology of suspender tensioning, and the optimal adjustment scheme is put forward.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U445.4;U448.25
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 耿學(xué)貴;何民;何明衛(wèi);董仁;;高速公路項(xiàng)目節(jié)能分析方法優(yōu)化[J];公路與汽運(yùn);2012年04期
2 吳濤;;高速公路可行性研究階段風(fēng)險(xiǎn)分析[J];工程與建設(shè);2010年05期
3 張先;查旭東;;淺談公路可行性研究工作的組織與管理[J];科技風(fēng);2010年01期
4 王紅;;可行性研究報(bào)告內(nèi)容結(jié)構(gòu)的邏輯推理特征[J];科技信息(學(xué)術(shù)研究);2008年29期
5 黃呂強(qiáng);詹前進(jìn);林顯鋒;;新公路設(shè)計(jì)理念和方法研究[J];華東公路;2008年03期
6 孫瑜;程建川;;德國(guó)公路設(shè)計(jì)標(biāo)準(zhǔn)中的新理念[J];中外公路;2007年01期
7 王輝;賈嘉;;山區(qū)高速公路設(shè)計(jì)中的道路安全理念[J];中外公路;2006年02期
8 成果;;關(guān)于公路建設(shè)項(xiàng)目可行性研究的思考[J];吉林交通科技;2002年02期
9 楊連云;淺談公路可行性研究工作的組織與管理[J];林業(yè)科技情報(bào);2001年04期
10 蔣東珂,蔣東冰,邢宏濤;公路可行性研究的工作準(zhǔn)備[J];黑龍江交通科技;1999年04期
相關(guān)博士學(xué)位論文 前1條
1 王建軍;公路建設(shè)項(xiàng)目后評(píng)價(jià)理論研究[D];長(zhǎng)安大學(xué);2003年
相關(guān)碩士學(xué)位論文 前10條
1 馮曉新;山區(qū)高速公路線形與環(huán)境協(xié)調(diào)技術(shù)研究[D];重慶交通大學(xué);2012年
2 黃錦秋;高速公路設(shè)計(jì)與土地集約節(jié)約利用關(guān)系的研究[D];長(zhǎng)安大學(xué);2011年
3 王碩;公路可行性研究中的交通需求預(yù)測(cè)理論及應(yīng)用研究[D];華中科技大學(xué);2011年
4 任霞;我國(guó)高速公路工程可行性研究質(zhì)量影響因素及管理研究[D];山東大學(xué);2009年
5 李準(zhǔn);公路設(shè)計(jì)項(xiàng)目投標(biāo)決策體系研究[D];中南大學(xué);2007年
6 朱江;公路建設(shè)項(xiàng)目環(huán)境管理體系研究[D];長(zhǎng)安大學(xué);2006年
7 周林;公路可行性研究中的交通分析研究[D];長(zhǎng)安大學(xué);2005年
8 寇小兵;公路可行性研究中若干問題的理論分析與應(yīng)用研究[D];西南交通大學(xué);2005年
9 劉俊寶;公路設(shè)計(jì)因素對(duì)交通安全的影響研究[D];長(zhǎng)安大學(xué);2002年
10 王廣山;高速公路設(shè)計(jì)一致性評(píng)價(jià)模型研究[D];北京工業(yè)大學(xué);2000年
,本文編號(hào):2388266
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2388266.html