盾構(gòu)施工對(duì)鄰近既有隧道的影響分析
[Abstract]:Since the beginning of the 21st century, the vigorous development of social economy has promoted the urban construction, and the urbanization process has led to the congestion of urban traffic, so the construction of urban subway is imminent. However, with the development of urban underground traffic construction, the increase of urban subway lines will often meet the shield tunnel construction adjacent to or crossing some of the existing tunnels. The shield construction will cause disturbance of surrounding strata and change the stress state of soil, and the displacement stratum will lead to uneven settlement and rupture of adjacent tunnels, which will seriously affect their normal use. It is of great significance to analyze the influence of shield construction on adjacent existing tunnels and summarize the rules for the normal advance of shield construction. Based on the engineering background of Hefei South Railway Station Line 5, this paper develops theoretical analysis, numerical simulation and monitoring data and simulation contrast analysis, and systematically analyzes the influence effect and law of shield construction on adjacent existing tunnels. The main work is as follows: (1) introduce the content and significance of this study in detail, through the relevant literature research, summarize the law, put forward the problem, analyze the existing but still unresolved problems at the present stage, Combined with the engineering examples in this paper, the research contents and methods are determined. (2) through theoretical analysis and research, the influence mechanism and law of shield construction on surrounding building (construction) are summarized, and the working mechanism and flow of shield machine are understood. This paper analyzes the stress mechanism of surrounding rock between single and double caverns, compares them, and analyzes the difference between them under the same construction environment. (3) mastering the use of finite element software. According to the actual working conditions, the finite element numerical calculation model is established. By defining different construction conditions, the influence of shield tunneling with different vertical distances on the existing tunnel is compared and analyzed. Through comparative analysis, the most suitable construction distance is obtained. (4) the field measured data are collected and analyzed, and then compared with the results of the theoretical numerical simulation, the similarities and differences between the two are found out from the comparative analysis. Summing up the rules provides theoretical guidance for normal construction, and also provides corresponding reference for similar projects.
【學(xué)位授予單位】:安徽建筑大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U455.43
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 肖瀟;張孟喜;吳惠明;張治國(guó);;多線疊交盾構(gòu)施工引起土體變形數(shù)值模擬分析[J];地下空間與工程學(xué)報(bào);2011年05期
2 魏綱;裘新谷;魏新江;丁智;;鄰近建筑物的暗挖隧道施工數(shù)值模擬[J];巖土力學(xué);2009年02期
3 徐前衛(wèi);朱合華;廖少明;鄭七振;周奎;;軟土地層土壓平衡盾構(gòu)法施工的模型試驗(yàn)研究[J];巖土工程學(xué)報(bào);2007年12期
4 何川;蘇宗賢;曾東洋;;盾構(gòu)隧道施工對(duì)已建平行隧道變形和附加內(nèi)力的影響研究[J];巖石力學(xué)與工程學(xué)報(bào);2007年10期
5 方勇;何川;;盾構(gòu)法修建正交下穿地鐵隧道對(duì)上覆隧道的影響分析[J];鐵道學(xué)報(bào);2007年02期
6 王偉;夏才初;朱合華;范明星;;雙線盾構(gòu)越江隧道合理間距優(yōu)化與分析[J];巖石力學(xué)與工程學(xué)報(bào);2006年S1期
7 胡群芳;黃宏偉;;盾構(gòu)下穿越已運(yùn)營(yíng)隧道施工監(jiān)測(cè)與技術(shù)分析[J];巖土工程學(xué)報(bào);2006年01期
8 巫環(huán);主、支線交叉重疊段隧道施工技術(shù)總結(jié)[J];西部探礦工程;2005年S1期
9 張志強(qiáng),何川;南京地鐵區(qū)間盾構(gòu)隧道“下穿”玄武湖公路隧道施工的關(guān)鍵技術(shù)研究[J];巖土力學(xué);2005年11期
10 張海波,殷宗澤,朱俊高;地鐵隧道盾構(gòu)法施工過(guò)程中地層變位的三維有限元模擬[J];巖石力學(xué)與工程學(xué)報(bào);2005年05期
相關(guān)博士學(xué)位論文 前2條
1 任文峰;高水壓隧道應(yīng)力場(chǎng)—位移場(chǎng)—滲流場(chǎng)耦合理論及注漿防水研究[D];中南大學(xué);2013年
2 張海波;地鐵隧道盾構(gòu)法施工對(duì)周圍環(huán)境影響的數(shù)值模擬[D];河海大學(xué);2005年
,本文編號(hào):2372869
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2372869.html