盾構施工對鄰近既有隧道的影響分析

發(fā)布時間:2018-12-11 16:32
【摘要】:步入21世紀以來,社會經(jīng)濟蓬勃發(fā)展推動了城市建設,城市化進程又導致了城市交通的擁堵,城市地鐵建設迫在眉睫。但隨著城市地下交通建設的發(fā)展,城市地鐵線路的增多,往往會遇到盾構隧道施工毗鄰或交叉某些既有的隧道。盾構施工會引起周圍地層的擾動,導致土體應力狀態(tài)發(fā)生改變,變位地層會導致鄰近的隧道發(fā)生不均勻沉降、破裂,嚴重時影響其正常使用。分析盾構施工對鄰近既有隧道的影響,總結規(guī)律,對盾構施工的正常推進具有重要意義。本文針對合肥地鐵南站5號線下穿1號線為工程背景,展開了理論分析、數(shù)值模擬和監(jiān)測數(shù)據(jù)與模擬對比分析,系統(tǒng)地分析了盾構施工對鄰近既有隧道的影響效應與影響規(guī)律,主要做了如下幾點工作:(1)詳細的介紹了本文研究的內容與意義,通過相關的文獻調研,總結規(guī)律,提出問題,分析現(xiàn)階段存在但仍未解決的問題,結合本文工程實例確定研究內容與方法。(2)通過理論分析研究,總結盾構施工對周邊建(構)筑物影響機理與規(guī)律,了解盾構機的工作機理與流程,分析單一洞室與雙洞室圍巖受力機理,并對二者進行比較,分析二者在同一施工環(huán)境下圍巖受力的差別。(3)掌握有限元軟件的使用方法,根據(jù)實際工況建立有限元數(shù)值計算模型,通過定義不同的施工工況,對比分析不同豎向距離盾構施工對既有隧道的影響大小,通過對比分析得出最合適的施工距離。(4)通過現(xiàn)場所測的實測數(shù)據(jù)進行整理分析,然后與理論上的數(shù)值模擬計算的結果進行對比分析,從對比分析中找出二者的異同,總結規(guī)律,為施工正常進行提供理論的指導,也為類似工程提供相應參考。
[Abstract]:Since the beginning of the 21st century, the vigorous development of social economy has promoted the urban construction, and the urbanization process has led to the congestion of urban traffic, so the construction of urban subway is imminent. However, with the development of urban underground traffic construction, the increase of urban subway lines will often meet the shield tunnel construction adjacent to or crossing some of the existing tunnels. The shield construction will cause disturbance of surrounding strata and change the stress state of soil, and the displacement stratum will lead to uneven settlement and rupture of adjacent tunnels, which will seriously affect their normal use. It is of great significance to analyze the influence of shield construction on adjacent existing tunnels and summarize the rules for the normal advance of shield construction. Based on the engineering background of Hefei South Railway Station Line 5, this paper develops theoretical analysis, numerical simulation and monitoring data and simulation contrast analysis, and systematically analyzes the influence effect and law of shield construction on adjacent existing tunnels. The main work is as follows: (1) introduce the content and significance of this study in detail, through the relevant literature research, summarize the law, put forward the problem, analyze the existing but still unresolved problems at the present stage, Combined with the engineering examples in this paper, the research contents and methods are determined. (2) through theoretical analysis and research, the influence mechanism and law of shield construction on surrounding building (construction) are summarized, and the working mechanism and flow of shield machine are understood. This paper analyzes the stress mechanism of surrounding rock between single and double caverns, compares them, and analyzes the difference between them under the same construction environment. (3) mastering the use of finite element software. According to the actual working conditions, the finite element numerical calculation model is established. By defining different construction conditions, the influence of shield tunneling with different vertical distances on the existing tunnel is compared and analyzed. Through comparative analysis, the most suitable construction distance is obtained. (4) the field measured data are collected and analyzed, and then compared with the results of the theoretical numerical simulation, the similarities and differences between the two are found out from the comparative analysis. Summing up the rules provides theoretical guidance for normal construction, and also provides corresponding reference for similar projects.
【學位授予單位】:安徽建筑大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:U455.43

【參考文獻】

相關期刊論文 前10條

1 肖瀟;張孟喜;吳惠明;張治國;;多線疊交盾構施工引起土體變形數(shù)值模擬分析[J];地下空間與工程學報;2011年05期

2 魏綱;裘新谷;魏新江;丁智;;鄰近建筑物的暗挖隧道施工數(shù)值模擬[J];巖土力學;2009年02期

3 徐前衛(wèi);朱合華;廖少明;鄭七振;周奎;;軟土地層土壓平衡盾構法施工的模型試驗研究[J];巖土工程學報;2007年12期

4 何川;蘇宗賢;曾東洋;;盾構隧道施工對已建平行隧道變形和附加內力的影響研究[J];巖石力學與工程學報;2007年10期

5 方勇;何川;;盾構法修建正交下穿地鐵隧道對上覆隧道的影響分析[J];鐵道學報;2007年02期

6 王偉;夏才初;朱合華;范明星;;雙線盾構越江隧道合理間距優(yōu)化與分析[J];巖石力學與工程學報;2006年S1期

7 胡群芳;黃宏偉;;盾構下穿越已運營隧道施工監(jiān)測與技術分析[J];巖土工程學報;2006年01期

8 巫環(huán);主、支線交叉重疊段隧道施工技術總結[J];西部探礦工程;2005年S1期

9 張志強,何川;南京地鐵區(qū)間盾構隧道“下穿”玄武湖公路隧道施工的關鍵技術研究[J];巖土力學;2005年11期

10 張海波,殷宗澤,朱俊高;地鐵隧道盾構法施工過程中地層變位的三維有限元模擬[J];巖石力學與工程學報;2005年05期

相關博士學位論文 前2條

1 任文峰;高水壓隧道應力場—位移場—滲流場耦合理論及注漿防水研究[D];中南大學;2013年

2 張海波;地鐵隧道盾構法施工對周圍環(huán)境影響的數(shù)值模擬[D];河海大學;2005年



本文編號:2372869

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2372869.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶e89fa***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com