東北地區(qū)某公路軟土地基處理措施研究
[Abstract]:Due to the insufficient bearing capacity of roadbed, a series of conditions such as settlement and deformation will occur in the course of construction and later use, which will seriously affect the quality of the road, and is not conducive to the safety of the road, because of the insufficient bearing capacity of the roadbed in the weak section of the foundation. In order to ensure the smooth construction of the first class highway from Arihe to Gagdaci and the safety and smooth running of the road, some measures should be taken to deal with the soft soil foundation in the section of the Gaja highway. Through the introduction of the engineering situation of the Gagong section, and the analysis of the soft soil properties involved in the project, and from the water content, soil permeability, compressibility, shear strength, This paper studies the engineering characteristics of soft soil from soil strength and other aspects, and carries out field investigation, and carries out laboratory test and analysis of the soil samples taken, which provides the basis for selecting reasonable treatment measures later on. In order to select a reasonable treatment method, this paper compares and selects the engineering cost, construction duration, applicable range, bearing capacity and so on. Combining with the soft soil foundation condition of Gaal highway, the method of combining the replacement construction with impact rolling is finally determined. At the same time, the paper discusses the treatment measures of the highway selection in detail, from the construction technology, construction matters needing attention and quality assurance measures to obtain the feasible quality assurance measures and control points. Provide technical support for physical engineering. In order to verify the rationality of soft foundation treatment measures in Gaa-a highway, the site settlement observation scheme was established, and the settlement measurement was carried out, and then the settlement prediction after construction was carried out by the growth curve method. Finally, the effect of the treatment scheme is evaluated by using the differential settlement control standard, and the rationality of the treatment scheme of soft soil subgrade is evaluated on this basis.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U416.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃意峰;;論公路軟土路基的處理[J];民營(yíng)科技;2009年07期
2 陳海蓉;;關(guān)于路基沉陷的原因分析[J];山西建筑;2008年35期
3 趙進(jìn)友;;淺談公路軟土路基處理[J];科技信息(學(xué)術(shù)研究);2008年26期
4 侯軍風(fēng);;如何合理進(jìn)行軟土路基處理[J];山西建筑;2008年14期
5 譚世霖;羅志強(qiáng);;軟基路基沉降系數(shù)的影響因素分析[J];廣東工業(yè)大學(xué)學(xué)報(bào);2007年01期
6 王海明;葉佰建;;軟土路基施工技術(shù)探討[J];山西建筑;2007年01期
7 唐華;錢立新;;軟土路基處理方法綜述[J];北方交通;2006年08期
8 陳錫輝;應(yīng)用深層攪拌樁加固軟土地基[J];山西建筑;2005年07期
9 曾超,唐仲華,肖峰;灰色模型(GM)在軟土路基沉降量預(yù)測(cè)中的應(yīng)用研究[J];勘察科學(xué)技術(shù);2002年01期
10 馮懷平,岳祖潤(rùn),趙玉成;水平測(cè)斜儀在路基沉降測(cè)量中的誤差處理[J];石家莊鐵道學(xué)院學(xué)報(bào);2001年04期
相關(guān)碩士學(xué)位論文 前3條
1 楊權(quán);常用公路軟土地基處理方法在佛山地區(qū)的使用研究[D];華南理工大學(xué);2010年
2 錢同慶;遼寧省公路建設(shè)軟土路基處理方法的應(yīng)用研究[D];沈陽(yáng)建筑大學(xué);2011年
3 秦美前;碎石樁在軟土路基中的應(yīng)用和研究[D];上海交通大學(xué);2007年
,本文編號(hào):2334720
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2334720.html