斜拉橋施工監(jiān)控效果綜合評(píng)價(jià)體系及應(yīng)用研究
[Abstract]:In the process of bridge construction, construction monitoring is the key step to control the progress and quality of the project, and the evaluation of the bridge construction monitoring effect can effectively evaluate the quality of the monitoring effect in a certain construction stage. Therefore, it is very important to improve and adjust the monitoring method in time, to make the monitoring effect better in the following construction stage, and then to make the bridge effect of the whole bridge reach the expected assumption. However, the evaluation of construction monitoring effect often relies too much on personal experience. It is not accurate and scientific to give a general qualitative evaluation result. In order to evaluate the construction monitoring effect of cable-stayed bridge scientifically and effectively, the author puts forward the improved Analytic hierarchy process (IAHP),) method and establishes the comprehensive evaluation system of the cable-stayed bridge construction monitoring effect according to the general content of the cable-stayed bridge construction monitoring and control. Then, on the basis of the actual engineering data, the comprehensive evaluation system is used to evaluate the large cable-stayed bridge of Liuchong River and the second Bridge of Jiujiang Yangtze River in Guizhou province. In this paper, the improved Analytic hierarchy process (IAHP) is used to determine the weight of each index in the comprehensive evaluation system of cable-stayed bridge construction monitoring effect. Then the fuzzy comprehensive evaluation method based on IAHP is used to grade each index according to the criterion of grade evaluation. The evaluation grade is classified as excellent, good, general, bad and bad, corresponding to different value intervals. Through the analysis and calculation, the total score value of the construction monitoring effect of the cable-stayed bridge can be obtained, thus the degree of the construction monitoring effect of the cable-stayed bridge can be more intuitively reflected. In this paper, according to the actual engineering data and the expert evaluation opinion, and through the research and calculation, the author evaluates the construction monitoring effect of two engineering examples, and the result is similar to that of the professional evaluation team. Thus it effectively verifies the scientificity and practicability of the comprehensive evaluation system for the construction monitoring effect of cable-stayed bridge.
【學(xué)位授予單位】:長(zhǎng)沙理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U445.4;U448.27
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 易俊;伍建林;史佩;王錚;;二階模糊安全評(píng)估方法及其在油庫安全評(píng)價(jià)中的應(yīng)用[J];中國(guó)安全科學(xué)學(xué)報(bào);2007年06期
2 朱小紅;陸愈實(shí);周德紅;;模糊評(píng)價(jià)數(shù)學(xué)模型在道路交通安全評(píng)價(jià)中的應(yīng)用[J];安全與環(huán)境工程;2006年03期
3 吳麗萍;吳世躍;郭勇義;;模糊數(shù)學(xué)在礦山安全綜合評(píng)價(jià)中的應(yīng)用[J];太原理工大學(xué)學(xué)報(bào);2006年02期
4 張宇峰;徐宏;倪一清;;大跨橋梁結(jié)構(gòu)健康監(jiān)測(cè)及安全評(píng)價(jià)系統(tǒng)研究與應(yīng)用進(jìn)展[J];公路;2005年12期
5 徐家云,何曉鳴,張俊,梁善齋,鮑政慧;模糊理論在橋梁評(píng)估中的應(yīng)用[J];武漢理工大學(xué)學(xué)報(bào);2003年07期
6 吳祈宗,朱心想;幾種區(qū)間數(shù)判斷矩陣排序權(quán)向量計(jì)算方法的比較研究[J];北京工商大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年04期
7 單勝道,尤建新;模糊綜合評(píng)估法及其在農(nóng)地價(jià)格評(píng)估中的應(yīng)用[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年08期
8 達(dá)慶利,徐澤水;不確定多屬性決策的單目標(biāo)最優(yōu)化模型[J];系統(tǒng)工程學(xué)報(bào);2002年01期
9 張永清,馮忠居;用層次分析法評(píng)價(jià)橋梁的安全性[J];西安公路交通大學(xué)學(xué)報(bào);2001年03期
相關(guān)博士學(xué)位論文 前1條
1 范劍鋒;橋梁健康狀態(tài)的智能評(píng)估方法研究[D];武漢理工大學(xué);2006年
相關(guān)碩士學(xué)位論文 前4條
1 鄭淼;基于模糊層次分析法的建設(shè)項(xiàng)目環(huán)境影響評(píng)價(jià)研究[D];天津大學(xué);2009年
2 劉洪春;大跨度獨(dú)塔斜拉橋施工控制與分析研究[D];西南交通大學(xué);2008年
3 郭世杰;大跨徑獨(dú)塔斜拉橋施工控制研究[D];西南交通大學(xué);2007年
4 尹發(fā)能;基于模糊數(shù)學(xué)方法的洞庭湖區(qū)水安全評(píng)價(jià)[D];湖南師范大學(xué);2004年
,本文編號(hào):2298276
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2298276.html