破碎圍巖錯縫拼裝盾構(gòu)隧道結(jié)構(gòu)承載性能與變形控制指標(biāo)
[Abstract]:In order to determine the deformation control index of shield tunnel structure with broken wall rock, considering two common load conditions, top heaped load and lateral unloading, the evolution of load-bearing performance of staggered jointed shield tunnel is studied. Firstly, based on the principle of equivalent stiffness of joint, a simplified simulation method of segment joint without force transfer liner is proposed. The calculation results of bolt axial force are compared with the measured data of relevant literature, and the method is proved to be reasonable and applicable. Based on the simplified joint simulation and the load structure method, the numerical simulation of the bearing capacity of the tunnel structure is carried out, and the development law of the segment bearing state with the section deformation is analyzed, finally, according to the critical point of the segment bearing state, The method of safety grade classification and deformation control index of shield tunnel structure are put forward. The results show that there are differences in yield order of segment bearing members under two different working conditions. The yield order under top loading condition is arch top, arch bottom inner reinforcement, arch waist inner concrete, and lateral unloading condition is arch top, arch bottom longitudinal joint bolt. Considering the durability of tunnel, bearing safety and the opportunity of strengthening the structure, the control value of the ellipticity of the section deformation under the load loading condition is 0.712 / 1.694 and 2.156 respectively, and under the unloading condition it is 0.876 / 1.873 / 2.757, respectively, for the outside arch, the arch top, the inside of the arch bottom, and the bolt for the arch waist, considering the durability of the tunnel, the safety of bearing capacity and the opportunity of strengthening the structure.
【作者單位】: 同濟(jì)大學(xué)土木工程學(xué)院;同濟(jì)大學(xué)土木信息技術(shù)教育部工程研究中心;廈門軌道交通集團(tuán)有限公司;上海同巖土木工程科技股份有限公司;
【基金】:國家重點基礎(chǔ)研究發(fā)展計劃(“九七三”計劃)項目(2015CB057806) 廈門市科技計劃重大項目(3502Z20151006) 國家電網(wǎng)公司科技項目(SHJJGC160053)
【分類號】:U455.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 魏爭偉;;松散破碎圍巖塌方防治技術(shù)措施[J];鐵道建筑技術(shù);2011年S1期
2 于剛;;深部巷道破碎圍巖支護(hù)技術(shù)研究[J];科學(xué)之友(B版);2007年05期
3 王在仁;敞開式全斷面隧道掘進(jìn)機(jī)開挖軟弱破碎圍巖隧道的施工方法[J];鐵道建筑技術(shù);2004年06期
4 于海東;;某富水軟弱破碎圍巖隧道施工安全技術(shù)[J];交通標(biāo)準(zhǔn)化;2011年20期
5 朱凱;段鴻川;廖成;許文博;;淺談破碎圍巖的穩(wěn)定性[J];企業(yè)技術(shù)開發(fā);2011年24期
6 柴躍進(jìn);;鐵路松散破碎圍巖隧道防塌控制技術(shù)[J];價值工程;2013年05期
7 王貴庭;;軟弱破碎圍巖中采用錨噴支護(hù)施工及其位移量測[J];鐵道標(biāo)準(zhǔn)設(shè)計通訊;1984年11期
8 李東江;;隧道破碎圍巖的開挖與支護(hù)[J];黑龍江科技信息;2011年18期
9 徐哲文;;破碎圍巖隧道開挖小導(dǎo)管高壓注漿機(jī)理及效果分析[J];北京交通大學(xué)學(xué)報;2008年04期
10 陳超;;隧道施工過程中破碎圍巖的處理方法研究[J];黑龍江交通科技;2013年05期
相關(guān)會議論文 前1條
1 楊長順;;十三陵蓄能電站交通洞富水軟弱破碎圍巖全斷面施工[A];中國土木工程學(xué)會隧道及地下工程學(xué)會第八屆年會論文集[C];1994年
相關(guān)碩士學(xué)位論文 前8條
1 李瑤;淺埋段破碎圍巖鐵路隧道洞口段施工技術(shù)研究[D];湖南科技大學(xué);2016年
2 殷川;破碎圍巖公路隧道變形監(jiān)測及施工數(shù)值模擬研究[D];蘭州交通大學(xué);2016年
3 魏龍;破碎圍巖隧道力學(xué)特性研究[D];蘭州交通大學(xué);2016年
4 張鵬飛;富水破碎圍巖山嶺隧道安全施工控制技術(shù)研究[D];湖南大學(xué);2014年
5 劉陸拓;祁連山隧道軟弱破碎圍巖段施工變形控制[D];北京交通大學(xué);2013年
6 白凈鈔;富水破碎圍巖隧道施工技術(shù)研究[D];西南交通大學(xué);2014年
7 劉光明;軟弱破碎圍巖隧道大變形機(jī)理及控制措施研究[D];中南大學(xué);2012年
8 黃崢嶸;軟弱破碎圍巖加固處理中的現(xiàn)場注漿試驗研究[D];重慶交通大學(xué);2008年