鐵路鋼管混凝土格構式高墩設計與分析
[Abstract]:The mountainous railway occupies a large proportion in the railway network of our country. In the process of railway construction, it is inevitable to adopt the long-span bridge structure with high piers. At present, the prestressed concrete structure is adopted in the beam part of the railway bridge in China. Reinforced concrete rectangular pier, round end hollow pier and column slab lattice pier are used in bridge piers. With the increase of pier height, the amount of concrete used in pier body will be greatly increased, so that the cost of pier body and foundation will be greatly increased, and the construction difficulty will increase sharply. The design and construction of high pier structure often become an important control factor. Especially in the loess deep gully area where the geology is poor, the influence on engineering economy is more obvious, so it is necessary to study the new type of high pier structure and explore a more economical and reasonable structure form of railway bridge high pier. On the basis of summarizing the application and development of high pier of railway bridge, this paper puts forward for the first time the idea of applying concrete filled steel tube latticed pier to long span bridge of railway high pier. Based on the analysis of the scheme and structure of Yimagou Bridge, this paper mainly studies the application of CFST latticed piers to the design of high piers of railway bridges, which provides technical support for the technical innovation and progress of the design and construction of railway bridge high piers. On the basis of summarizing the development of concrete-filled steel tube (CFST), the basic calculation theory and rules of CFST members, the basic working principle and characteristics of CFST are discussed systematically. The comparison of domestic and foreign design rules and the application of concrete filled steel tube in bridges are carried out. Taking the proposed Yimagou Bridge as an engineering example, aiming at the meteorological, engineering geology, earthquake and other engineering background data of the bridge, according to its structural design characteristics and technical standards, combined with the actual terrain and geological requirements, the bridge type is carried out. Based on the comparative study of bridge piers and other structural schemes, this paper presents a steel truss scheme for concrete filled steel tube (175,175) m V) lattice pier and (175) m steel truss cable-stayed bridge for concrete-filled steel tube (CFST) lattice pier, and a steel truss cable-stayed bridge with (175,175) m steel truss for concrete filled steel tube. The reinforced concrete type A pier with (752 脳 12875) m prestressed concrete continuous rigid frame bridge has three bridge types. The structural design, calculation, analysis and comparison of the three bridge schemes in terms of overall static performance, dynamic performance and foundation force are carried out in detail. The analysis and comparison show that the steel truss scheme of Yimagou Bridge with concrete-filled steel tube latticed pier (175,175) m V brace T truss) has the advantages of light structure, reasonable mechanical performance, beautiful bridge shape, convenient construction and moderate cost. The dynamic simulation analysis of steel truss with concrete-filled steel tubular (175,175) m V) steel truss is carried out for Yimagou Bridge, which proves the feasibility of applying CFST latticed pier to high pier of railway bridge. The piers can be used not only in ordinary speed railway with low speed, but also in passenger dedicated railway with 350 kilometers per hour. The advantages of concrete-filled steel tubular (CFST) latticed pier are: greatly reducing the amount of formwork, raising the level of mechanized construction, shortening the construction period, reducing the comprehensive economic cost of the high pier, and having good ductility, that is, excellent seismic performance and so on. Concrete-filled steel tube (CFST) lattice pier is a new type of high pier structure with superior structural performance and good economic performance.
【學位授予單位】:蘭州交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U442.5;U443.22
【相似文獻】
相關期刊論文 前10條
1 曲衛(wèi)波,侯朝勝;鋼管混凝土的應用[J];福建建筑;2002年03期
2 喻臨新,薄鳳麗;鋼管混凝土脫空問題的技術對策[J];公路;2004年01期
3 倪訓松,倪偉;一種新型鋼管混凝土的研究[J];鋼結構;2005年04期
4 王曉鋒;郭長青;張喜娥;;鋼管混凝土應用與分析[J];國外建材科技;2006年03期
5 許奇;;鋼管混凝土綜述[J];山西建筑;2007年09期
6 李俊華;王正中;王立青;;鋼管混凝土的特性與發(fā)展[J];路基工程;2007年05期
7 陳聯(lián)盟;;鋼管混凝土中鋼管和混凝土共同工作問題討論[J];中國水運(理論版);2007年11期
8 王煥林;;鋼管混凝土的受力特性及其應用中的優(yōu)缺點[J];江西化工;2008年04期
9 黃用軍;堯國皇;宋寶東;彭肇才;;鋼管混凝土疊合柱在深圳卓越·皇崗世紀中心項目中的應用[J];廣東土木與建筑;2008年07期
10 徐艷梅;;鋼管混凝土在建筑工程中的應用[J];黑龍江科技信息;2009年05期
相關會議論文 前10條
1 陶要彬;劉學輝;;鋼管混凝土施工[A];土木建筑學術文庫(第9卷)[C];2008年
2 王來永;陳寶春;孫潮;;鋼管混凝土設計方法比較[A];第十屆全國結構工程學術會議論文集第Ⅲ卷[C];2001年
3 堯國皇;黃用軍;;鋼管混凝土疊合柱在深圳卓越·皇崗世紀中心項目中的應用[A];第九屆全國現(xiàn)代結構工程學術研討會論文集[C];2009年
4 韓林海;;鋼管混凝土理論與設計關鍵問題的系列研究[A];2004年全國建筑鋼結構行業(yè)大會論文集[C];2004年
5 查曉雄;葉福相;陳艷;鐘善桐;;超聲波法在鋼管混凝土質量檢測中的應用[A];第三屆全國鋼結構工程技術交流會論文集[C];2010年
6 梅洋;吳斌;趙俊賢;郝貴強;杜永山;;組合鋼管混凝土式防屈曲支撐[A];第三屆全國城市與工程安全減災學術研討會論文集[C];2010年
7 吳斌;梅洋;張家廣;趙俊賢;郝貴強;杜永山;;組合鋼管混凝土式防屈曲支撐及其工程應用[A];第八屆全國地震工程學術會議論文集(Ⅱ)[C];2010年
8 夏建國;;鋼管混凝土柱承載力的計算公式[A];中國土木工程學會橋梁及結構工程學會第九屆年會論文集[C];1990年
9 王宇;何廣漢;楊永清;蒲黔輝;王炳靈;;鋼管混凝土肋拱的橫向穩(wěn)定性分析[A];第七屆全國結構工程學術會議論文集(第Ⅱ卷)[C];1998年
10 韓林海;;鋼管混凝土結構的理論與實踐——第十屆全國結構工程學術會議特邀報告[A];第十屆全國結構工程學術會議論文集第Ⅰ卷[C];2001年
相關重要報紙文章 前4條
1 吳兆良,,浙江宏成建設集團有限公司總經(jīng)理;張海高,浙江廣豐建設集團有限公司董事長 樓大明;鋼管混凝土在建設工程中的應用與前景[N];建筑時報;2012年
2 ;C100級混凝土技術成功應用[N];中華建筑報;2003年
3 王玉銀;優(yōu)勢互補 完善組合[N];中國冶金報;2006年
4 記者蔡崇金 通訊員李明春;鋼管混凝土桁架連續(xù)梁工藝破解施工難題[N];中國鐵道建筑報;2009年
相關博士學位論文 前10條
1 熊銳;鋼管混凝土界面狀態(tài)試驗研究與分析[D];武漢理工大學;2013年
2 徐騰飛;鋼管混凝土非線性穩(wěn)定承載能力與可靠度研究[D];西南交通大學;2010年
3 張玉芬;復式鋼管混凝土軸壓性能及節(jié)點抗震試驗研究[D];長安大學;2010年
4 許成祥;鋼管混凝土框架結構抗震性能的試驗與理論研究[D];天津大學;2003年
5 劉威;鋼管混凝土局部受壓時的工作機理研究[D];福州大學;2005年
6 何珊瑚;三肢鋼管混凝土弦桿—鋼管腹桿桁架抗彎力學性能研究[D];清華大學;2012年
7 丁發(fā)興;圓鋼管混凝土結構受力性能與設計方法研究[D];中南大學;2006年
8 康希良;鋼管混凝土組合力學性能及粘結滑移性能研究[D];西安建筑科技大學;2008年
9 李斌;鋼管混凝土結構的研究[D];西安建筑科技大學;2005年
10 彭斌;異形截面多腔鋼管混凝土巨型柱框架抗震試驗與理論研究[D];北京工業(yè)大學;2012年
相關碩士學位論文 前10條
1 冼嘉浩;基于整體結構的新型鋼管混凝土分叉柱—鋼梁節(jié)點性能研究[D];華南理工大學;2015年
2 任宏偉;鋼管混凝土邊框連接裝置及力學性能研究[D];河北聯(lián)合大學;2014年
3 武立偉;鋼管混凝土邊框與剪力墻結合面抗剪承載力研究[D];河北聯(lián)合大學;2014年
4 王劍閣;海洋平臺搖擺柱體系搖擺柱構造研究及抗剪性能研究[D];青島理工大學;2015年
5 曹曉波;黃土公路隧道新型初期支護結構選型研究[D];長安大學;2015年
6 劉永超;復式鋼管混凝土軸壓及抗震性能有限元分析[D];長安大學;2015年
7 高爽;基于聲發(fā)射的FRP鋼管混凝土損傷過程研究[D];大連海事大學;2015年
8 蘇曉春;鋼管混凝土受壓構件力學性能研究[D];西安工業(yè)大學;2015年
9 李博;不同形式鋼管混凝土框架結構的抗震性能分析研究[D];內(nèi)蒙古工業(yè)大學;2015年
10 景惠民;鋼管混凝土拋物線桁拱平面內(nèi)穩(wěn)定性能研究[D];哈爾濱工業(yè)大學;2015年
本文編號:2253456
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2253456.html