矮塔斜拉橋施工監(jiān)控及受力性能若干問題的研究
[Abstract]:The low-pylon cable-stayed bridge is a new type of bridge between ordinary cable-stayed bridge and traditional girder bridge. Its construction process is changeable, stress and linear control is complex, so construction monitoring is needed to ensure construction safety and quality. Das Civil establishes the whole bridge pole system model and simulates the various working conditions during the construction process, thus obtaining the internal forces and deflections of the relevant control sections under different working conditions. A simple calculation formula is given to ensure the uniformity of each strand in the single cable tension of a low-pylon cable-stayed bridge, which is verified by practical monitoring. Aiming at the prominent shear lag effect of a wide-span bridge, a solid model is established by Midas FEA to simulate the working conditions in the construction stage, and the corresponding poles are established. The results show that the transverse prestressing tendon at the diaphragm has little effect on the longitudinal normal stress of the control section, the shear lag effect of the control section caused by concrete placement is not obvious, the longitudinal prestressing tends to cause stress concentration at the measuring point, and the tension of the cable is easy to lead to stress concentration. In the stress monitoring of wide box girder, the solid modeling method should be adopted to obtain the theoretical value of measuring points. As the supporting system of cantilever casting, the hanging basket equipment is closely related to the construction of wide box girder. The results show that the traveling basket used in construction is safe and reasonable. The dynamic and static load test is a direct way to study the mechanical performance of the bridge. This paper makes a load test plan for the bridge and analyzes the test data to further explore. The mechanical performance of the cable-stayed bridge in the background provides a basis for the design rationality and safety of the bridge.
【學(xué)位授予單位】:合肥工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U445.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張慧;張玉元;張?jiān)?;單箱雙室簡(jiǎn)支箱梁剪切變形剪力滯效應(yīng)分析[J];鐵道科學(xué)與工程學(xué)報(bào);2016年12期
2 邢兵;強(qiáng)士中;唐堂;;關(guān)于橋梁承載能力評(píng)定若干問題的思考[J];中外公路;2015年06期
3 陳麗軍;胡寧;李運(yùn);文小和;劉璐;;某連續(xù)剛構(gòu)橋0號(hào)塊局部應(yīng)力分析[J];公路工程;2015年05期
4 倪文龍;劉凡;賈志強(qiáng);李雷;;橫向預(yù)應(yīng)力對(duì)混凝土寬箱梁剪力滯效應(yīng)影響的有限元分析[J];市政技術(shù);2015年05期
5 藺鵬臻;方煒彬;楊子江;孫理想;冀偉;;預(yù)應(yīng)力作用下箱梁橋的剪力滯效應(yīng)研究[J];中國(guó)公路學(xué)報(bào);2015年05期
6 殷臻;彭爽;余舟;;大跨度連續(xù)剛構(gòu)橋立模標(biāo)高掛籃變形修正[J];黑龍江交通科技;2013年05期
7 呂長(zhǎng)榮;馬良;;獨(dú)塔背索斜拉橋的荷載試驗(yàn)分析[J];華東公路;2012年04期
8 周?;吳永昌;譚也平;莊焰;;橋梁荷載試驗(yàn)研究綜述[J];中外公路;2008年04期
9 譚紅霞;陳政清;;大跨度斜拉橋施工階段主梁的立模標(biāo)高研究[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年08期
10 陳從春;肖汝誠(chéng);;用索梁活載比界定矮塔斜拉橋的方法[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年06期
相關(guān)會(huì)議論文 前1條
1 陳從春;肖汝誠(chéng);;矮塔斜拉橋幾個(gè)問題的探討及發(fā)展展望[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程分會(huì)2005年全國(guó)橋梁學(xué)術(shù)會(huì)議論文集[C];2005年
相關(guān)博士學(xué)位論文 前2條
1 陳從春;矮塔斜拉橋設(shè)計(jì)理論核心問題研究[D];同濟(jì)大學(xué);2006年
2 羅旗幟;基于能量原理的薄壁箱梁剪力滯理論與試驗(yàn)研究[D];湖南大學(xué);2005年
相關(guān)碩士學(xué)位論文 前10條
1 賈利強(qiáng);橋梁結(jié)構(gòu)測(cè)試技術(shù)研究[D];長(zhǎng)安大學(xué);2015年
2 禹鵬;橋梁監(jiān)測(cè)中應(yīng)變測(cè)試技術(shù)研究[D];重慶交通大學(xué);2014年
3 宋龍龍;橋梁荷載試驗(yàn)校驗(yàn)系數(shù)影響因素分析[D];長(zhǎng)安大學(xué);2014年
4 孟林;矮塔斜拉橋?qū)捪淞杭袅?yīng)分析[D];長(zhǎng)安大學(xué);2014年
5 周瑩;矮塔斜拉橋施工關(guān)鍵項(xiàng)目的控制分析研究[D];重慶交通大學(xué);2013年
6 劉揚(yáng);薄壁箱梁剪力滯效應(yīng)的研究[D];重慶交通大學(xué);2013年
7 劉建平;薄壁箱梁剪力滯效應(yīng)分析與研究[D];重慶交通大學(xué);2013年
8 翟磊;鋼筋混凝土橋梁荷載試驗(yàn)中的應(yīng)變測(cè)試方法研究[D];重慶交通大學(xué);2013年
9 賈中濤;懸臂施工掛籃空間應(yīng)力分析[D];東北林業(yè)大學(xué);2013年
10 袁衛(wèi)國(guó);菱形掛籃設(shè)計(jì)改良與施工技術(shù)研究[D];華南理工大學(xué);2012年
,本文編號(hào):2222878
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2222878.html