隧道襯砌質(zhì)量的地質(zhì)雷達(dá)檢測和數(shù)值模擬分析
[Abstract]:Due to the concealment of tunnel construction and the complexity of construction process, tunnel lining is easy to have quality problems in varying degrees, which inevitably affects the stress and deformation of surrounding rock, and even affects the safety of tunnel operation. Therefore, in order to ensure the safety of tunnel operation, it is necessary to carry out a comprehensive quality inspection of the lining and analyze the possible impact of the lining defects. In this paper, the quality of the lining of Shangguan tunnel is evaluated by using the principle of non-destructive testing of the ground penetrating radar and the image of the inspection, which shows that the lining of the tunnel has no quality defects. Then based on the discrete element method, the numerical calculation model of Shangguan tunnel is established, and the main defects of the lining after construction are simulated and calculated, and the stress and deformation of surrounding rock are analyzed. The stress and deformation of surrounding rock are compared with the design. The results show that: (1) if the thickness of the second lining concrete is 5 cm smaller than the designed thickness or the maximum longitudinal spacing of the anchor rod is 1.3 m, (2) the maximum displacement of surrounding rock is still less than the warning value of displacement convergence, if there are 5 cm thick cavities between the initial supporting concrete thickness and the designed thickness or between the initial branch of the upper step section and the surrounding rock, the maximum displacement of the surrounding rock is still smaller than the warning value of displacement convergence. But it has a great influence on the stress of surrounding rock and needs to be treated in time. (3) under the same condition of 5 cm less than the designed thickness, The influence of thickness defect of initial support concrete on the stress and deformation of surrounding rock is much greater than that on the thickness defect of second lining concrete. (4) the influence of local thick hole of 5 cm thick hole on the stress and deformation of surrounding rock is greater than that of the thickness defect of second lining concrete. The effect of the thickness defect (5 cm less than the designed thickness) of the first supported concrete.
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U455.91;U456.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李偉平;;公路隧道設(shè)計與施工的現(xiàn)狀及問題探討[J];公路;2011年08期
2 田其祥;;地質(zhì)雷達(dá)在隧道襯砌檢測中的應(yīng)用[J];中國西部科技;2010年30期
3 劉輝;張智超;王林娟;;2004—2008年我國隧道施工事故統(tǒng)計分析[J];中國安全科學(xué)學(xué)報;2010年01期
4 李沫;賈俊鳳;;地質(zhì)雷達(dá)技術(shù)在隧道質(zhì)量檢測中的應(yīng)用[J];工程質(zhì)量;2007年03期
5 邱海濤,譚卓英,趙永貴,于宏東;雷達(dá)無損檢測技術(shù)在南昆鐵路隧道檢測中的應(yīng)用[J];廣西地質(zhì);2002年04期
6 趙憲堂,萬國普;地質(zhì)雷達(dá)圖像中地面干擾的識別與去除[J];水文地質(zhì)工程地質(zhì);2001年06期
7 施若谷;麥克斯韋與電磁場理論的建立[J];漳州師范學(xué)院學(xué)報(自然科學(xué)版);2000年03期
8 王泳嘉,劉連峰;三維離散單元法軟件系統(tǒng)TRUDEC的研制[J];巖石力學(xué)與工程學(xué)報;1996年03期
9 劉立,唐建新;高速公路隧道施工過程的新奧法監(jiān)控[J];重慶大學(xué)學(xué)報(自然科學(xué)版);1995年05期
10 王泳嘉,邢紀(jì)波;離散單元法同拉格朗日元法及其在巖土力學(xué)中的應(yīng)用[J];巖土力學(xué);1995年02期
相關(guān)博士學(xué)位論文 前1條
1 王吉亮;基于人工智能與三維數(shù)值模擬的烏竹嶺隧道圍巖穩(wěn)定性系統(tǒng)研究[D];吉林大學(xué);2009年
相關(guān)碩士學(xué)位論文 前3條
1 占慧鳴;上官隧道施工動態(tài)監(jiān)測與圍巖穩(wěn)定性分析[D];華中科技大學(xué);2010年
2 王洋;基于數(shù)字圖像技術(shù)巖體隧道開挖三維模型數(shù)值實現(xiàn)與分析[D];東北大學(xué);2010年
3 周翔;山嶺隧道質(zhì)量無損檢測及缺陷力學(xué)特性研究[D];西南交通大學(xué);2005年
,本文編號:2186736
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2186736.html