隧道襯砌質(zhì)量的地質(zhì)雷達(dá)檢測和數(shù)值模擬分析

發(fā)布時間:2018-08-16 17:54
【摘要】:由于隧道施工的隱蔽性和施工過程的復(fù)雜性,隧道襯砌易在不同程度上存在著質(zhì)量問題,不可避免地影響圍巖應(yīng)力和變形,甚至影響隧道的運營安全。因此為保證隧道的運營安全,就必須對襯砌進(jìn)行全面的質(zhì)量檢測,并對襯砌缺陷可能造成的影響進(jìn)行分析。本文首先運用地質(zhì)雷達(dá)無損檢測的原理并結(jié)合檢測圖像對上官隧道的襯砌質(zhì)量進(jìn)行了評價,表明隧道襯砌基本無質(zhì)量缺陷。再基于離散元法以上官隧道為工程背景建立了數(shù)值計算模型,對一般的公路隧道施工后襯砌可能存在的主要缺陷進(jìn)行了模擬計算,分析了圍巖應(yīng)力和變形,并分別與設(shè)計情況下的圍巖應(yīng)力和變形進(jìn)行了對比。分析表明:(1)若存在二襯混凝土厚度比設(shè)計厚度小5 cm或錨桿縱向間距最大為1.3 m的缺陷時,則對圍巖應(yīng)力和變形的影響均較小。(2)若存在初支混凝土厚度比設(shè)計厚度小5 cm或上臺階斷面初支與圍巖間局部存在5 cm厚空洞時,雖圍巖最大位移仍小于位移收斂警戒值,但對圍巖應(yīng)力產(chǎn)生了很大影響,需及時進(jìn)行施工處理。(3)在比設(shè)計厚度小5 cm的相同情況下,初支混凝土厚度缺陷對圍巖應(yīng)力和變形的影響要遠(yuǎn)大于二襯混凝土厚度缺陷的影響。(4)上臺階斷面初支與圍巖間局部存在5 cm厚空洞對圍巖應(yīng)力和變形的影響要大于初支混凝土厚度缺陷(比設(shè)計厚度小5 cm)的影響。
[Abstract]:Due to the concealment of tunnel construction and the complexity of construction process, tunnel lining is easy to have quality problems in varying degrees, which inevitably affects the stress and deformation of surrounding rock, and even affects the safety of tunnel operation. Therefore, in order to ensure the safety of tunnel operation, it is necessary to carry out a comprehensive quality inspection of the lining and analyze the possible impact of the lining defects. In this paper, the quality of the lining of Shangguan tunnel is evaluated by using the principle of non-destructive testing of the ground penetrating radar and the image of the inspection, which shows that the lining of the tunnel has no quality defects. Then based on the discrete element method, the numerical calculation model of Shangguan tunnel is established, and the main defects of the lining after construction are simulated and calculated, and the stress and deformation of surrounding rock are analyzed. The stress and deformation of surrounding rock are compared with the design. The results show that: (1) if the thickness of the second lining concrete is 5 cm smaller than the designed thickness or the maximum longitudinal spacing of the anchor rod is 1.3 m, (2) the maximum displacement of surrounding rock is still less than the warning value of displacement convergence, if there are 5 cm thick cavities between the initial supporting concrete thickness and the designed thickness or between the initial branch of the upper step section and the surrounding rock, the maximum displacement of the surrounding rock is still smaller than the warning value of displacement convergence. But it has a great influence on the stress of surrounding rock and needs to be treated in time. (3) under the same condition of 5 cm less than the designed thickness, The influence of thickness defect of initial support concrete on the stress and deformation of surrounding rock is much greater than that on the thickness defect of second lining concrete. (4) the influence of local thick hole of 5 cm thick hole on the stress and deformation of surrounding rock is greater than that of the thickness defect of second lining concrete. The effect of the thickness defect (5 cm less than the designed thickness) of the first supported concrete.
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U455.91;U456.3

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李偉平;;公路隧道設(shè)計與施工的現(xiàn)狀及問題探討[J];公路;2011年08期

2 田其祥;;地質(zhì)雷達(dá)在隧道襯砌檢測中的應(yīng)用[J];中國西部科技;2010年30期

3 劉輝;張智超;王林娟;;2004—2008年我國隧道施工事故統(tǒng)計分析[J];中國安全科學(xué)學(xué)報;2010年01期

4 李沫;賈俊鳳;;地質(zhì)雷達(dá)技術(shù)在隧道質(zhì)量檢測中的應(yīng)用[J];工程質(zhì)量;2007年03期

5 邱海濤,譚卓英,趙永貴,于宏東;雷達(dá)無損檢測技術(shù)在南昆鐵路隧道檢測中的應(yīng)用[J];廣西地質(zhì);2002年04期

6 趙憲堂,萬國普;地質(zhì)雷達(dá)圖像中地面干擾的識別與去除[J];水文地質(zhì)工程地質(zhì);2001年06期

7 施若谷;麥克斯韋與電磁場理論的建立[J];漳州師范學(xué)院學(xué)報(自然科學(xué)版);2000年03期

8 王泳嘉,劉連峰;三維離散單元法軟件系統(tǒng)TRUDEC的研制[J];巖石力學(xué)與工程學(xué)報;1996年03期

9 劉立,唐建新;高速公路隧道施工過程的新奧法監(jiān)控[J];重慶大學(xué)學(xué)報(自然科學(xué)版);1995年05期

10 王泳嘉,邢紀(jì)波;離散單元法同拉格朗日元法及其在巖土力學(xué)中的應(yīng)用[J];巖土力學(xué);1995年02期

相關(guān)博士學(xué)位論文 前1條

1 王吉亮;基于人工智能與三維數(shù)值模擬的烏竹嶺隧道圍巖穩(wěn)定性系統(tǒng)研究[D];吉林大學(xué);2009年

相關(guān)碩士學(xué)位論文 前3條

1 占慧鳴;上官隧道施工動態(tài)監(jiān)測與圍巖穩(wěn)定性分析[D];華中科技大學(xué);2010年

2 王洋;基于數(shù)字圖像技術(shù)巖體隧道開挖三維模型數(shù)值實現(xiàn)與分析[D];東北大學(xué);2010年

3 周翔;山嶺隧道質(zhì)量無損檢測及缺陷力學(xué)特性研究[D];西南交通大學(xué);2005年



本文編號:2186736

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2186736.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶6a355***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com