盾構(gòu)施工對(duì)鄰近群樁基礎(chǔ)影響的數(shù)值模擬研究
[Abstract]:The shield construction of adjacent pile group foundation is a common engineering problem. Through the analysis of 3D finite element model and the comparison of field monitoring data, the settlement law of pile group at 1 / 2D distance shield machine during shield construction is studied, and the law of bending moment and axial force is discussed in combination with the results of finite element method. The results show that the influence of shield pressure on adjacent piles is obvious during shield construction.
【作者單位】: 江陰職業(yè)技術(shù)學(xué)院;
【分類號(hào)】:U455.43
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 張姣;賈敏才;張建;;地鐵隧道盾構(gòu)法施工全過(guò)程風(fēng)險(xiǎn)分析[J];公路工程;2013年03期
2 陳勇勤;;基坑開挖對(duì)鄰近公路盾構(gòu)隧道變形影響分析[J];公路工程;2013年03期
3 李鵬;向勇;張家元;;大斷面過(guò)江隧道盾構(gòu)管片內(nèi)力計(jì)算對(duì)比分析[J];公路工程;2010年04期
4 李進(jìn)軍;王衛(wèi)東;黃茂松;富坤;;地鐵盾構(gòu)隧道穿越對(duì)建筑物樁基礎(chǔ)的影響分析[J];巖土工程學(xué)報(bào);2010年S2期
5 劉庭金;魏立新;房營(yíng)光;莫海鴻;;隧道建設(shè)對(duì)緊鄰高架橋影響的三維數(shù)值分析[J];巖土力學(xué);2008年05期
6 李早;黃茂松;;隧道開挖對(duì)群樁豎向位移和內(nèi)力影響分析[J];巖土工程學(xué)報(bào);2007年03期
7 李強(qiáng);王明年;李德才;余波;;地鐵車站暗挖隧道施工對(duì)既有樁基的影響[J];巖石力學(xué)與工程學(xué)報(bào);2006年01期
8 張志強(qiáng),何川;地鐵盾構(gòu)隧道近接樁基的施工力學(xué)行為研究[J];鐵道學(xué)報(bào);2003年01期
9 李永盛,黃海鷹;盾構(gòu)推進(jìn)對(duì)相鄰樁體力學(xué)影響的實(shí)用計(jì)算方法[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);1997年03期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 熊雙根;;盾構(gòu)隧道下穿對(duì)建筑物條形基礎(chǔ)的影響及控制措施研究[J];鐵道建筑技術(shù);2017年07期
2 史作t,
本文編號(hào):2168360
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2168360.html