獨(dú)塔斜拉橋空間施工控制方法與應(yīng)用研究
[Abstract]:With the rapid increase of traffic flow, the width of the bridge becomes larger and larger, and the spatial problems in the process of bridge construction become more and more prominent. The monitoring of bridge construction needs to change from the previous analysis of the bar structure to the analysis of the spatial entity. To ensure the safety of the bridge during construction. In this paper, a set of simple and feasible construction control method of single-tower cable-stayed bridge is formed through a lot of theoretical analysis and research, and the feasibility of spatial construction control method of single-tower cable-stayed bridge is verified. The main contents of this paper are as follows: (1) the whole bridge member system model is established by using the finite element analysis software Midas Civil, and the main beam under the two main construction stages, the maximum cantilever state and the completed bridge state, and the post-load combination of the bridge are analyzed. The internal force, stress and deformation of the cable tower and cable are calculated, and the results show that the stress and deformation of the bridge meet the requirements of the code. (2) A standard section of block 0 with 2.5m rib width of the main beam is established by using the finite element software Midas Fea. The spatial solid model of four typical segments of main beam with 2.0 m rib width and four typical segments of anchor span, The spatial stress distribution of each segment in the maximum cantilever stage and the bridge stage during construction is analyzed. (3) by comparing the longitudinal normal stress results of the solid element model with the beam element model, the law of stress variation is obtained. The arrangement of longitudinal stress measuring points of main beam section is optimized. Combined with the construction control method commonly used at present, a set of construction monitoring scheme suitable for single tower cable-stayed bridge is put forward. (4) according to the comparison between the theoretical value of the main girder and the measured value during the construction process of the main bridge, The accuracy of the construction control method is verified.
【學(xué)位授予單位】:湖南科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:U445.4;U448.27
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王亞?wèn)|;;斜拉橋主塔施工技術(shù)[J];中國(guó)科技信息;2015年02期
2 刁品華;;綜合分析大跨度橋梁施工控制[J];現(xiàn)代經(jīng)濟(jì)信息;2014年17期
3 黃學(xué)欣;;混凝土連續(xù)箱梁溫度效應(yīng)施工監(jiān)控[J];山西建筑;2012年24期
4 陳小玲;;單索面矮塔斜拉橋塔梁墩固結(jié)局部應(yīng)力分析[J];交通科技;2012年01期
5 汪勁豐,項(xiàng)貽強(qiáng);獨(dú)塔單索面斜拉橋空間應(yīng)力狀態(tài)分析[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì);2005年03期
6 趙中旺,葛俊穎,王海良;某矮塔斜拉橋的施工控制研究[J];鐵道建筑;2002年06期
7 代希華,陳達(dá)章;崖門(mén)大橋主橋局部應(yīng)力分析[J];廣東公路交通;2000年S1期
8 閭開(kāi)軍,孫江濤,胡曉東;淺談斜拉橋的發(fā)展[J];湖南交通科技;1999年01期
9 潘家英,余振生,辛學(xué)忠,高芒芒;大跨徑獨(dú)塔斜拉橋全橋空間模型試驗(yàn)與分析[J];土木工程學(xué)報(bào);1998年05期
10 陳開(kāi)利;獨(dú)塔斜拉橋的建設(shè)與展望[J];橋梁建設(shè);1998年03期
相關(guān)博士學(xué)位論文 前5條
1 張玉平;多塔空間索斜拉橋施工控制關(guān)鍵技術(shù)研究[D];長(zhǎng)沙理工大學(xué);2014年
2 吳再新;大跨度組合體系箱梁的計(jì)算理論及其應(yīng)用研究[D];中南大學(xué);2007年
3 陶海;基于空間分析的混凝土斜拉橋關(guān)鍵問(wèn)題研究[D];同濟(jì)大學(xué);2007年
4 李曉莉;獨(dú)塔斜拉橋的設(shè)計(jì)理論研究[D];同濟(jì)大學(xué);2007年
5 汪勁豐;預(yù)應(yīng)力混凝土斜拉橋施工控制的關(guān)鍵技術(shù)研究[D];浙江大學(xué);2003年
相關(guān)碩士學(xué)位論文 前10條
1 孫開(kāi)旗;矮塔斜拉橋箱梁空間效應(yīng)分析[D];合肥工業(yè)大學(xué);2015年
2 來(lái)?xiàng)n雄;單跨非對(duì)稱(chēng)式獨(dú)塔斜拉橋施工方法和施工控制研究[D];長(zhǎng)安大學(xué);2014年
3 趙高杰;雙塔斜拉橋力學(xué)行為分析及施工監(jiān)控[D];青島理工大學(xué);2014年
4 楊剛;大跨徑PC連續(xù)剛構(gòu)橋的空間受力分析[D];長(zhǎng)安大學(xué);2014年
5 胡偉;獨(dú)塔斜拉橋靜力分析和橋塔局部分析[D];合肥工業(yè)大學(xué);2014年
6 崔鑫;預(yù)應(yīng)力混凝土斜拉橋施工監(jiān)控及健康監(jiān)測(cè)若干問(wèn)題研究[D];浙江大學(xué);2014年
7 于可鑫;大跨連續(xù)梁橋懸臂施工空間應(yīng)力分析[D];東北林業(yè)大學(xué);2013年
8 鄭宇;大傾角無(wú)背索斜拉橋參數(shù)分析和施工控制[D];東北林業(yè)大學(xué);2013年
9 肖子旺;矮塔斜拉橋索鞍空間應(yīng)力測(cè)試與分析[D];東北林業(yè)大學(xué);2013年
10 李仲陽(yáng);大跨度連續(xù)梁橋應(yīng)力監(jiān)控和零號(hào)塊空間應(yīng)力分析[D];沈陽(yáng)建筑大學(xué);2013年
,本文編號(hào):2132210
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2132210.html