被動式橋梁樁基托換方案研究與應用
本文選題:樁基托換 + 設計理論; 參考:《蘭州交通大學》2015年碩士論文
【摘要】:隨著城市向大型化、現(xiàn)代化方向發(fā)展,城市的地面交通壓力越來越大,為了緩解地面交通壓力,建設高效、便捷的地下鐵道成為眾多城市改善交通狀況的首選,同時地下鐵道的發(fā)達程度也成為衡量一座城市現(xiàn)代化的重要指標。地鐵隧道的建設與既有建筑物基礎的沖突無法避免,這就需要對侵入隧道內(nèi)的樁基進行托換。樁基托換往往與隧道的施工是密不可分的,因此研究隧道施工過程中樁基托換的力學行為具有重要的現(xiàn)實意義。本文首先介紹基礎托換的幾種分類方法、托換樁的主要類型和特點、托換承重體系的主要類型,然后闡述了國內(nèi)外托換工程研究現(xiàn)狀和重要實例以及基礎托換過程中應注意的幾個問題。對樁基托換的設計理論進行了詳細闡述,重點歸納了樁基托換結構設計的難點和重點,給出了托換結構各部件的設計方法,著重分析了托換梁和托換新樁節(jié)點設計的思路以及托換梁與托換柱節(jié)點的抗剪機理,并對樁基托換的施工監(jiān)測體系進行詳細說明。對蘭州市地鐵一號線拱星墩~焦家灣區(qū)間隧道下穿爛泥溝橋的工程概況以及數(shù)值分析中的有限元的相關理論作了介紹,對隧道直接下穿爛泥溝橋的開挖以及切樁過程進行了較為詳細的數(shù)值模擬分析,分析了隧道開挖和切樁過程樁基和土層的力學行為,并從控制沉降的角度分析,得出隧道直接下穿爛泥溝橋梁引起的結構沉降不滿足規(guī)范要求,必須對爛泥溝橋梁進行加固或改造。對爛泥溝橋的加固或改造工程提出了三種可行性方案,最后采用對比分析的方法,得出被動式樁基托換方案為最佳方案。對爛泥溝地面樁基托換洞內(nèi)截樁的被動式樁基托換施工過程進行了詳細的數(shù)值模擬分析,從沉降、應力以及內(nèi)力方面對計算結果進行分析,證明了該托換方案是合理、可行的。
[Abstract]:With the development of city towards large scale and modernization, the pressure of urban ground traffic is increasing. In order to alleviate the pressure of ground traffic, the construction of efficient and convenient underground railway has become the first choice for many cities to improve the traffic condition. At the same time, the development of subway has become an important indicator to measure the modernization of a city. The conflict between the subway tunnel construction and the existing building foundation cannot be avoided, so it is necessary to replace the pile foundation that intrudes into the tunnel. Pile foundation underpinning is often closely related to tunnel construction, so it is of great practical significance to study the mechanical behavior of pile foundation underpinning during tunnel construction. This paper first introduces several classification methods of foundation underpinning, the main types and characteristics of underpinning piles, the main types of underpinning load bearing system, Then the present situation and important examples of underpinning engineering at home and abroad and some problems needing attention in the process of foundational underpinning are expounded. The design theory of pile foundation underpinning is expounded in detail. The difficulties and key points of pile foundation underpinning structure design are summarized, and the design methods of various components of pile foundation underpinning structure are given. The paper emphatically analyzes the design idea of the supporting beam and the new pile joint, and the shear mechanism of the underpinning beam and the underpinning column joint, and explains in detail the construction monitoring system of the pile foundation underpinning. This paper introduces the engineering situation of the tunnel under the tunnel between the arch star pier and the Jiaojiawan section of Lanzhou Metro Line 1 through the muddy ditch bridge and the relevant theory of the finite element method in the numerical analysis. The excavation and pile cutting process of tunnel directly through muddy ditch bridge are simulated and analyzed in detail. The mechanical behavior of pile foundation and soil layer during tunnel excavation and pile cutting are analyzed, and the settlement control is analyzed from the point of view of controlling settlement. It is concluded that the structural settlement caused by the tunnel directly passing through the muddy ditch bridge does not meet the requirements of the code, so it is necessary to strengthen or rebuild the muddy ditch bridge. In this paper, three feasible schemes are put forward for the reinforcement or reconstruction of the muddy ditch bridge. Finally, by using the method of comparative analysis, it is concluded that the passive pile foundation underpinning scheme is the best scheme. In this paper, the numerical simulation analysis of the construction process of the passive pile foundation underpinning in the retaining tunnel of the ground pile foundation in the muddy ditch is carried out, and the calculation results are analyzed from the aspects of settlement, stress and internal force. It is proved that the replacement scheme is reasonable and feasible.
【學位授予單位】:蘭州交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U445.551
【相似文獻】
相關期刊論文 前10條
1 谷偉平,李國雄;廣州市地鐵一號線基礎托換工程的理論分析與設計[J];巖土工程學報;2000年01期
2 吳方伯,陳大川;南天大廈梁柱及磚墻托換介紹[J];中外建筑;2000年03期
3 柯梅麗;世界第一大軸力托換工程在深圳順利截樁[J];施工技術;2002年04期
4 鄭文忠,周威,王英;哈爾濱商業(yè)幼兒園托換改造設計[J];低溫建筑技術;2002年04期
5 林桂武;某車間柱下獨立基礎的坑式托換處理[J];廣西電業(yè);2002年06期
6 李安起,都愛華,張鑫,范西龍;某選煤廠運輸走廊的托換改造[J];工業(yè)建筑;2003年11期
7 王世君;;樁基托換技術在廣州地鐵三號線工程中的應用[J];施工技術;2006年06期
8 王昌;劉晏斌;趙虎;袁占剛;;中央大道四號路地道托換工程施工技術綜述[J];天津建設科技;2008年06期
9 涂強;;大軸力樁基托換變形控制值確定[J];鐵道工程學報;2008年02期
10 王利萍;;淺談主體結構托換在工程實踐中的應用[J];新疆有色金屬;2008年05期
相關會議論文 前10條
1 顧遠生;;移位工程中托換結構節(jié)點設計探討[A];城市地下空間綜合開發(fā)技術交流會論文集[C];2013年
2 都愛華;張鑫;朱維申;;框架柱托換節(jié)點承載力計算公式的理論研究[A];第19屆全國結構工程學術會議論文集(第Ⅲ冊)[C];2010年
3 呂劍英;;樁基的地下托換方法[A];中國城市軌道交通新技術(第三集)[C];2009年
4 周寧;鮑宇清;袁廣林;;頂升糾偏托換結構設計方法及試驗研究[A];首屆全國既有結構加固改造設計與施工技術交流會論文集[C];2007年
5 張建林;潘立;張吉柱;于岳;汪光文;;鋼結構托換的改造技術工程實例[A];首屆全國既有結構加固改造設計與施工技術交流會論文集[C];2007年
6 王建永;林其荃;朱啟華;;混凝土托換結構計算方法分析[A];第十屆建構筑物改造和病害處理學術研討會、第五屆工程質量學術會議論文集[C];2014年
7 汪劍;尹勝文;朱建群;陳堅;;結合深圳市兒童醫(yī)院改擴建工程實例探討厚板托換跨越地鐵隧道的應用[A];第四屆全國建筑結構技術交流會論文集(上)[C];2013年
8 劉文彬;池雪仔;;某會所承重墻體的托換加固設計[A];第四屆全國現(xiàn)代結構工程學術研討會論文集[C];2004年
9 秦浩;完海鷹;;某老建筑的墻體托換的設計及施工[A];首屆全國既有結構加固改造設計與施工技術交流會論文集[C];2007年
10 王永禎;;邢臺水泵廠鑄造車間柱基礎工程托換加固處理[A];中國土木工程學會土力學及基礎工程學會地基處理學術委員會第三屆地基處理學術討論會論文集[C];1992年
相關重要報紙文章 前2條
1 鐘仕平邋王良雷;中隧三處再亮“偷梁換柱”絕技[N];中國交通報;2008年
2 通訊員 張權德 鄭永剛;“被動式基礎托換”施工工藝開全國先河[N];人民鐵道;2006年
相關博士學位論文 前4條
1 都愛華;框架結構移位托換節(jié)點受力機理的研究[D];山東大學;2010年
2 鄔毛志;利用鋼管樁實施基礎托換的關鍵技術研究[D];華中科技大學;2009年
3 卜建清;車輛動荷載作用下橋梁墩柱主動托換關鍵技術研究及應用[D];中國鐵道科學研究院;2011年
4 曹書文;基礎托換在磚石古建筑保護中的應用研究[D];西安建筑科技大學;2014年
相關碩士學位論文 前10條
1 劉鑫;砌體承重墻雙梁式托換結構受力性能試驗研究[D];山東建筑大學;2015年
2 鞏善亮;框架柱托換節(jié)點抗震性能的試驗研究[D];山東建筑大學;2015年
3 賈培棟;被動式橋梁樁基托換方案研究與應用[D];蘭州交通大學;2015年
4 李瑩;建筑物整體平移托換結構節(jié)點受力性能試驗研究[D];山東大學;2008年
5 柴玉國;既有線路改造中主動托換法的施工應用研究[D];中國地質大學(北京);2010年
6 劉濤;建筑物移位工程托換結構水平受力分析[D];山東建筑大學;2010年
7 王玉寶;大軸力樁基托換工程結構技術的應用研究[D];鐵道部科學研究院;2001年
8 楊再道;大軸力樁基托換施工安全監(jiān)測的研究[D];鐵道部科學研究院;2003年
9 王浩;深圳地鐵下穿百貨廣場特大軸力樁基托換技術研究[D];西南交通大學;2007年
10 于京昌;樁梁式托換荷載轉換規(guī)律和變形特性的數(shù)值分析[D];山東建筑大學;2013年
,本文編號:2099715
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2099715.html