連續(xù)箱梁橋掛籃施工監(jiān)控關(guān)鍵技術(shù)研究
本文選題:橋梁工程 + 連續(xù)梁橋。 參考:《鄭州大學(xué)》2017年碩士論文
【摘要】:鄭州某市政組合立交高架橋處于城市主干道的交叉位置,道路交通量極大,該橋的修建不僅要滿足通行需求,仍要兼顧與周邊環(huán)境美觀相協(xié)調(diào)的要求,社會(huì)關(guān)注度高,同時(shí)工期要求緊、任務(wù)重。該組合立交的中跨度最長(zhǎng)、高度最高的M主線主跨橋,為單箱雙室、雙幅并排布置的預(yù)應(yīng)力連續(xù)混凝土橋梁,設(shè)計(jì)為掛籃施工、雙幅橋梁標(biāo)高誤差應(yīng)控制在±30mm以內(nèi),建設(shè)單位要求應(yīng)社會(huì)需求要提前合攏竣工,該工程在施工過(guò)程中首次采用8個(gè)掛籃同時(shí)施工、鋼筋綁扎與混凝土養(yǎng)生同步進(jìn)行的特有工藝,該工藝與常規(guī)的只考慮安全、質(zhì)量,只考慮自身的線形標(biāo)高有所區(qū)別,更多的引入了加快工期、雙幅橋梁相互標(biāo)高一致的問(wèn)題,本文以該橋?yàn)槔?針對(duì)該施工方法進(jìn)行了以下幾方面的研究工作:1.總結(jié)分析了國(guó)內(nèi)外預(yù)應(yīng)力混凝土連續(xù)梁橋的掛籃施工方法、監(jiān)控方法、有限元建模分析等方法,為本工程的順利施工提供了經(jīng)驗(yàn)、數(shù)據(jù)依據(jù)。2.通過(guò)Midas軟件進(jìn)行橋梁有限元分析,通過(guò)Midas軟件對(duì)橋梁和掛籃結(jié)構(gòu)進(jìn)行分析,精確地得到懸臂梁在各個(gè)節(jié)段、各個(gè)截面的內(nèi)力和變形,為施工過(guò)程中的立模標(biāo)高控制、預(yù)拱度控制等以及掛籃的制作提供了數(shù)據(jù)支持、安全性評(píng)價(jià)等。3.引入了自適應(yīng)控制方法,通過(guò)對(duì)參數(shù)進(jìn)行敏感性分析識(shí)別主要、次要參數(shù),并對(duì)施工過(guò)程的監(jiān)測(cè)數(shù)據(jù)進(jìn)行調(diào)整,減小了參數(shù)誤差的累計(jì),保證了橋梁的順利合攏。4.通過(guò)對(duì)線形、應(yīng)力的監(jiān)測(cè),把橋梁高程及線形、橋梁結(jié)構(gòu)及混凝土的受力狀況,控制在了合理的范圍內(nèi),使得整個(gè)施工工期結(jié)構(gòu)處于安全、可控的范圍內(nèi),確保了橋梁的內(nèi)力狀態(tài)和結(jié)構(gòu)線形滿足設(shè)計(jì)要求,為橋梁的順利合攏打下了良好基礎(chǔ)。5.研究了掛籃延伸施工過(guò)程中、雙幅橋梁并排施工過(guò)程中橋梁梁體的內(nèi)力和線形調(diào)整變化的特點(diǎn),通過(guò)實(shí)測(cè)數(shù)值與計(jì)算值進(jìn)行比較、分析和調(diào)整,有效的控制了橋梁的線形、應(yīng)力變化過(guò)程,為成橋后達(dá)到設(shè)計(jì)和規(guī)范要求、類(lèi)似橋梁的施工提供了相關(guān)施工參數(shù)。
[Abstract]:The viaduct of a municipal combination interchange in Zhengzhou is in the crossing position of the main urban road, and the traffic volume of the road is great. The construction of the bridge should not only meet the traffic demand, but also take into account the requirements of harmony with the surrounding environment, and the social concern is high. At the same time, the time limit is tight and the task is heavy. The composite interchange has the longest span and the highest height of the M mainline main span bridge, which is a prestressed continuous concrete bridge with single box and two chambers and two parallel frames. The design is a hanging basket construction, and the elevation error of the double bridge should be controlled within 鹵30mm. The construction unit requires the completion of the project to be completed in advance according to the needs of the society. For the first time in the construction process of the project, eight hanging baskets are used at the same time. The special process of steel bar binding and concrete health preservation is carried out at the same time, and the process and routine only consider safety and quality. Only considering the difference of their own linear elevation, more introduced the problem of accelerating the construction period, and the two bridges are consistent in each other's elevation. This paper takes the bridge as an example and does the following research work on the construction method: 1. This paper summarizes and analyzes the construction method of hanging basket, monitoring method and finite element modeling analysis of prestressed concrete continuous beam bridge at home and abroad, which provides experience for the successful construction of the project. The finite element analysis of bridge is carried out by Midas software, and the bridge and hanging basket structure are analyzed by Midas software. The internal force and deformation of cantilever beam in each section and section are accurately obtained, which is the control of elevation of vertical formwork in construction process. Pre-arch control and the production of hanging basket provide data support, security evaluation, etc. 3. An adaptive control method is introduced to identify the main and secondary parameters by sensitivity analysis of the parameters and to adjust the monitoring data of the construction process to reduce the accumulative error of the parameters and to ensure the smooth closure of the bridge. Through the monitoring of line shape and stress, the bridge height and shape, bridge structure and concrete stress condition are controlled in a reasonable range, which makes the whole construction period structure in a safe and controllable range. It ensures that the internal force state of the bridge and the structural alignment meet the design requirements, and lays a good foundation for the smooth closure of the bridge. This paper studies the characteristics of the internal force and linear adjustment of the bridge beam during the construction process of hanging basket extension construction, and compares the measured value with the calculated value, analyses and adjusts effectively, and effectively controls the line shape of the bridge. The process of stress variation provides the relevant construction parameters for the construction of similar bridges after the completion of the bridge to meet the design and specification requirements.
【學(xué)位授予單位】:鄭州大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:U445.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊昊;張良;;淺談橋梁的掛籃施工技術(shù)[J];黑龍江交通科技;2012年12期
2 鄧建平;;有關(guān)橋梁掛籃施工技術(shù)的分析[J];四川建材;2013年04期
3 劉昌林;;掛籃施工技術(shù)在鐵路跨度連續(xù)梁工程中的應(yīng)用[J];江西建材;2014年04期
4 胡向東,林順財(cái);預(yù)應(yīng)力鋼筋混凝土連續(xù)箱梁掛籃施工法[J];水運(yùn)工程;2001年02期
5 韓敘領(lǐng),孫文懷,朱晶波;公路裝配式鋼梁橋桁架掛籃施工技術(shù)的改進(jìn)[J];華北水利水電學(xué)院學(xué)報(bào);2002年02期
6 杜傳寶,錢(qián)思成;型鋼式掛籃施工技術(shù)[J];上海公路;2004年03期
7 楊平中;廣園大橋主航道橋掛籃施工控制[J];青海交通科技;2005年03期
8 陳秋平;;大跨度預(yù)應(yīng)力混凝土橋梁掛籃施工測(cè)量方法探討[J];工程地球物理學(xué)報(bào);2006年04期
9 炊廷柱;;淺談自制裝配式桁架掛籃施工技術(shù)[J];科技信息(科學(xué)教研);2007年21期
10 尚澤華;;淺談多風(fēng)條件下的大型掛籃施工技術(shù)[J];科協(xié)論壇(下半月);2009年02期
相關(guān)會(huì)議論文 前10條
1 張國(guó)坤;;連續(xù)箱梁掛籃施工擾度控制分析[A];全國(guó)城市公路學(xué)會(huì)第十五屆(2006)學(xué)術(shù)年會(huì)論文集[C];2006年
2 門(mén)文博;;掛籃施工連續(xù)梁橋是臂端高程控制[A];第十屆中國(guó)科協(xié)年會(huì)中部地區(qū)物流產(chǎn)業(yè)體系建設(shè)論壇專輯[C];2008年
3 盛希;任劍波;張法;;荊州長(zhǎng)江公路大橋主橋掛籃施工[A];第一屆全國(guó)公路科技創(chuàng)新高層論壇論文集公路設(shè)計(jì)與施工卷[C];2002年
4 王峰;;永定新河特大橋掛籃施工技術(shù)[A];中國(guó)土木工程學(xué)會(huì)市政工程分會(huì)2000年學(xué)術(shù)年會(huì)論文集[C];2000年
5 韓大建;蘇成;肖廣成;陳太聰;;大跨度混凝土斜拉橋牽索掛籃施工模擬計(jì)算[A];計(jì)算機(jī)在土木工程中的應(yīng)用——第十屆全國(guó)工程設(shè)計(jì)計(jì)算機(jī)應(yīng)用學(xué)術(shù)會(huì)議論文集[C];2000年
6 許俊;董書(shū)鳴;張晟;;橋梁施工監(jiān)控的信息化管理[A];第十七屆全國(guó)橋梁學(xué)術(shù)會(huì)議論文集(下冊(cè))[C];2006年
7 王夢(mèng)瑩;;預(yù)應(yīng)力混凝土連續(xù)梁施工監(jiān)控[A];全國(guó)城市公路學(xué)會(huì)第二十次學(xué)術(shù)年會(huì)論文集[C];2011年
8 張磊;錢(qián)振東;劉騰愛(ài);馮志龍;;204國(guó)道張家港大橋擴(kuò)建設(shè)計(jì)及施工監(jiān)控[A];全國(guó)既有橋梁加固、改造與評(píng)價(jià)學(xué)術(shù)會(huì)議論文集[C];2008年
9 丁如珍;;特大跨度預(yù)應(yīng)力混凝土連續(xù)梁橋施工監(jiān)控技術(shù)[A];中國(guó)公路學(xué)會(huì)2005年學(xué)術(shù)年會(huì)論文集(上)[C];2005年
10 向友誠(chéng);;大跨度橋梁施工監(jiān)控中的應(yīng)力分析[A];第十五屆粵、京、港、滬鐵道學(xué)會(huì)學(xué)術(shù)年會(huì)第八屆世界軌道交通發(fā)展研究會(huì)年會(huì)論文集[C];2011年
相關(guān)重要報(bào)紙文章 前8條
1 記者 鮑丕勇;徐賈快速通道瓦莊運(yùn)河大橋合龍[N];徐州日?qǐng)?bào);2011年
2 通訊員 伍振;十八局集團(tuán)潼西高速嚴(yán)防死守保安全[N];中國(guó)鐵道建筑報(bào);2010年
3 本報(bào)記者 鮑丕勇;徐賈快速通道年內(nèi)建成通車(chē)[N];徐州日?qǐng)?bào);2011年
4 記者 章盛莉;湘府路湘江大橋預(yù)計(jì)明年8月合龍[N];長(zhǎng)沙晚報(bào);2011年
5 本報(bào)記者 陳果;廣州西塔運(yùn)用施工監(jiān)控技術(shù)[N];廣東建設(shè)報(bào);2008年
6 肖影 徐軍華;中鐵二十局集團(tuán)川渝公司攻破橋梁施工難題[N];中華建筑報(bào);2006年
7 袁弘;請(qǐng)“監(jiān)工”保質(zhì)!办n”建大橋[N];成都日?qǐng)?bào);2007年
8 記者 舒薇;福元路大橋預(yù)計(jì)12月全線通車(chē)[N];長(zhǎng)沙晚報(bào);2012年
相關(guān)碩士學(xué)位論文 前10條
1 光軍偉;連續(xù)箱梁橋掛籃施工監(jiān)控關(guān)鍵技術(shù)研究[D];鄭州大學(xué);2017年
2 張祥凱;多跨連續(xù)梁橋掛籃施工線形優(yōu)化研究[D];合肥工業(yè)大學(xué);2015年
3 栗勇;紅楓湖大橋掛籃施工方法研究[D];大連理工大學(xué);2003年
4 高雅;斜拉橋掛籃施工模擬分析[D];南京林業(yè)大學(xué);2010年
5 史毅杰;邢家灣特大橋掛籃施工工藝優(yōu)化研究[D];河北工業(yè)大學(xué);2014年
6 張慶明;懸澆法掛籃施工的誤差控制研究[D];河北工業(yè)大學(xué);2006年
7 毛小明;按掛籃施工設(shè)計(jì)的連續(xù)剛構(gòu)橋采用支架分段施工的研究[D];武漢理工大學(xué);2013年
8 王芳;大矢跨比鋼箱拱橋施工監(jiān)控方案研究[D];江蘇科技大學(xué);2015年
9 王天禹;大跨度鋼—混組合梁橋施工監(jiān)控方法及問(wèn)題分析[D];重慶交通大學(xué);2015年
10 林川川;滹沱河特大橋施工監(jiān)控技術(shù)研究[D];石家莊鐵道大學(xué);2015年
,本文編號(hào):2094082
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2094082.html