雙線平行隧道盾構(gòu)施工引起的地表沉降研究
本文選題:并行隧道施工 切入點(diǎn):反分析 出處:《大連海事大學(xué)》2017年碩士論文
【摘要】:隨著城市的快速發(fā)展,土地資源變得越來(lái)越珍貴,對(duì)地下空間的開發(fā)越來(lái)越受到人們的重視。在對(duì)地下空間的利用中,一種高效的方式就是隧道。在隧道的設(shè)計(jì)時(shí),經(jīng)常會(huì)采用并行的兩孔的布置形式。兩孔隧道的施工會(huì)產(chǎn)生一定程度的相互影響,這種相互作用不僅影響圍巖的應(yīng)力狀態(tài)和位移,而且對(duì)地表位移及支護(hù)荷載產(chǎn)生一定的影響。因此,對(duì)并行隧道施工的相互影響進(jìn)行深入系統(tǒng)地探討是十分必要的。本文首先回顧了雙線平行隧道的研究現(xiàn)狀,接下來(lái)對(duì)大連香工街~沙河口站區(qū)間隧道盾構(gòu)施工方式及沉降測(cè)量方法進(jìn)行了簡(jiǎn)要介紹。然后對(duì)雙線隧道盾構(gòu)施工引起的地表沉降機(jī)理進(jìn)行了研究和分析,最后介紹了數(shù)值模擬軟件FLAC3D以及盾構(gòu)掘進(jìn)的FLAC3D實(shí)現(xiàn)。在進(jìn)行了地質(zhì)參數(shù)敏感性反分析和上軟下硬地層地鐵盾構(gòu)施工反分析之后,結(jié)合雙孔并行隧道施工的實(shí)際情況建立一個(gè)雙孔并行隧道先后開挖的三維計(jì)算模型。通過不同計(jì)算模型的對(duì)比,得出了影響地表沉降的四個(gè)因素:隧道的間距、圍巖條件、掘進(jìn)方式以及隧道埋深,得出以下主要結(jié)論:(1)在其他條件不變時(shí),地表橫向沉降范圍隨著上覆土層厚度的變大而變大,而地表的最大沉降量的變化趨勢(shì)與地表橫向沉降范圍的變化趨勢(shì)相反(2)在其他條件不變時(shí),隧道的間距越大,地表沉降曲線的雙峰形態(tài)越明顯。當(dāng)間距大于3D時(shí),地表沉降曲線與兩條隧道分別施工的疊加曲線幾乎相同。(3)盾構(gòu)隧道穿過的土層的主要成分是粉細(xì)砂、粉質(zhì)粘土。當(dāng)粉細(xì)砂不含水或者含水量很小時(shí),其穩(wěn)定性非常好。因此,當(dāng)開挖土體的主要成分是粉細(xì)砂時(shí),盾構(gòu)施工所造成的地表沉降往往很小。相比來(lái)說(shuō),粉質(zhì)粘土的穩(wěn)定性就差得多。粉質(zhì)粘土條件盾構(gòu)施工所造成的地表的沉降很大。因此,在對(duì)地鐵線路進(jìn)行規(guī)劃時(shí),應(yīng)該盡量避開粉質(zhì)粘土地層。(4)不同的施工方式造成的地表沉降也不同。其中同向同時(shí)開挖造成的地表沉降最大,逆向同時(shí)開挖造成的沉降比前者小,同向不同時(shí)開挖造成的地表沉降最小。在施工條件允許時(shí),應(yīng)盡量采用同向不同時(shí)的開挖方法。(5)在復(fù)雜條件下對(duì)隧道地質(zhì)參數(shù)敏感性進(jìn)行反分析,中風(fēng)化鈣質(zhì)板巖的C1、φ1對(duì)于測(cè)點(diǎn)位移的影響是最大的,其他參數(shù)對(duì)拱頂和拱底的影響都不大。從位移的極差值曲線圖分析可以看出,強(qiáng)度參數(shù)對(duì)位移的影響比剛度參數(shù)的要大,主要通過C、φ值對(duì)位移產(chǎn)生影響。將反演參數(shù)計(jì)算值與已知監(jiān)測(cè)位移值進(jìn)行對(duì)比分析,結(jié)果表明實(shí)際現(xiàn)場(chǎng)監(jiān)測(cè)值略小于數(shù)值計(jì)算結(jié)果,相對(duì)誤差最大為9.62%,反演的結(jié)果令人滿意,證明了反分析參數(shù)的可靠性。
[Abstract]:With the rapid development of cities, land resources become more and more precious, and people pay more and more attention to the development of underground space. In the use of underground space, a highly efficient way is tunnel. The construction of the two-hole tunnel will have a certain degree of interaction, which not only affects the stress state and displacement of the surrounding rock, but also affects the stress and displacement of the surrounding rock. Therefore, it is necessary to study the interaction of parallel tunnel construction deeply and systematically. Firstly, this paper reviews the research status of two-line parallel tunnel. Then, the construction method and settlement measurement method of shield tunneling between stations of Xianggong Street and Shahekou in Dalian are briefly introduced, and then the mechanism of ground subsidence caused by shield construction of double-line tunnel is studied and analyzed. Finally, the numerical simulation software FLAC3D and the FLAC3D realization of shield tunneling are introduced. Combined with the actual situation of double-hole parallel tunnel construction, a three-dimensional calculation model of two-hole parallel tunnel excavation was established. Through the comparison of different calculation models, four factors affecting surface subsidence were obtained: tunnel spacing, surrounding rock condition, and so on. The main conclusions are as follows: 1) when the other conditions are unchanged, the lateral settlement range of the surface increases with the thickness of the overlying soil layer. However, the variation trend of the maximum settlement of the surface is opposite to that of the lateral settlement range of the surface. When the other conditions are not changed, the larger the tunnel spacing is, the more obvious the bimodal shape of the surface settlement curve is. The surface settlement curve is almost the same as the superposition curve of the two tunnels respectively.) the main components of the soil layer through the shield tunnel are fine silty sand and silty clay. When the silt has no water or water content is very small, its stability is very good. When the main component of the excavated soil is silty sand, the ground subsidence caused by shield tunneling is often very small. Compared with the silty clay, the stability of silty clay is much worse. In the planning of subway lines, the ground subsidence caused by different construction methods should be avoided as far as possible, and the settlement caused by simultaneous excavation in the same direction is the largest, and the settlement caused by the reverse simultaneous excavation is smaller than that caused by the former. The surface subsidence caused by different excavation in the same direction is the smallest. When the construction conditions permit, the excavation method of the same direction and different time should be used as far as possible, and the sensitivity of the geological parameters of the tunnel should be analyzed back under the complicated conditions. The effect of C _ 1 and 蠁 _ 1 on the displacement of measured point is the biggest in the medium weathered calcareous slate, but the other parameters have little effect on the arch roof and arch bottom. From the analysis of the extreme difference curve of displacement, it can be seen that the influence of strength parameter on displacement is greater than that on stiffness parameter. The results show that the actual field monitoring value is slightly smaller than the numerical value, the maximum relative error is 9.62 and the inversion results are satisfactory. The reliability of the back analysis parameters is proved.
【學(xué)位授予單位】:大連海事大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U455.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳計(jì)明;淺論隧道盾構(gòu)施工離進(jìn)站的技術(shù)措施[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì);2002年09期
2 沈培良,張海波,殷宗澤;相鄰隧道長(zhǎng)距離疊交施工的數(shù)值模擬[J];西部探礦工程;2003年11期
3 張海波,殷宗澤,朱俊高;近距離疊交隧道盾構(gòu)施工對(duì)老隧道影響的數(shù)值模擬[J];巖土力學(xué);2005年02期
4 王少葵;;關(guān)于某隧道盾構(gòu)機(jī)起吊方案施工簡(jiǎn)析[J];科技資訊;2008年36期
5 ;隧道盾構(gòu)法常態(tài)施工的安全風(fēng)險(xiǎn)評(píng)價(jià)與對(duì)策[J];建筑安全;2008年07期
6 郭懷仁;;交疊隧道盾構(gòu)施工變形性能分析[J];四川建筑;2009年01期
7 錢雙彬;董軍;陳方權(quán);;隧道盾構(gòu)下穿車站出入口數(shù)值仿真對(duì)比研究[J];中國(guó)安全科學(xué)學(xué)報(bào);2009年03期
8 錢雙彬;董軍;李玲;;隧道盾構(gòu)下穿車站出入口仿真方法對(duì)比研究[J];建筑技術(shù);2009年06期
9 李文舉;武亞軍;常瑩;;隧道盾構(gòu)施工對(duì)臨近樁基影響的數(shù)值模擬[J];上海大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年02期
10 房明;劉鎮(zhèn);周翠英;史海歐;;交叉隧道盾構(gòu)施工與鄰近不同位置建筑物的相互影響研究[J];中山大學(xué)學(xué)報(bào)(自然科學(xué)版);2011年01期
相關(guān)會(huì)議論文 前10條
1 杜守峰;;關(guān)于某地鐵隧道盾構(gòu)機(jī)被卡的原因分析及脫困的探討[A];第二屆隧道掘進(jìn)機(jī)(盾構(gòu)、TBM)專業(yè)委員會(huì)第一次學(xué)術(shù)研討會(huì)暨中鐵隧道集團(tuán)城市盾構(gòu)項(xiàng)目管理、施工技術(shù)、設(shè)備維保交流會(huì)論文集[C];2011年
2 馬明磊;王桂玲;苗冬梅;李天生;;隧道盾構(gòu)井可切削混凝土樁復(fù)合筋配筋原理與應(yīng)用[A];第三屆全國(guó)地下、水下工程技術(shù)交流會(huì)論文集[C];2013年
3 趙運(yùn)臣;;武漢長(zhǎng)江隧道盾構(gòu)過江施工技術(shù)措施[A];中國(guó)中鐵隧道集團(tuán)2007年水底隧道專題技術(shù)交流大會(huì)論文集[C];2007年
4 ;杭州灣大通道為何最終摒棄修建越海隧道?[A];盛世歲月——祝賀孫鈞院士八秩華誕論文選集[C];2006年
5 包乃文;王昌水;;地鐵盾構(gòu)隧道下穿公路隧道安全監(jiān)控[A];2009中國(guó)城市地下空間開發(fā)高峰論壇論文集[C];2009年
6 胡茜;何川;;富水砂礫石地層地鐵區(qū)間隧道盾構(gòu)機(jī)選型分析[A];中國(guó)交通土建工程學(xué)術(shù)論文集(2006)[C];2006年
7 孫鈞;;軟土地鐵區(qū)間隧道盾構(gòu)施工計(jì)算機(jī)技術(shù)管理系統(tǒng)研制[A];盛世歲月——祝賀孫鈞院士八秩華誕論文選集[C];2006年
8 高峰;陳俊林;;道路隧道盾構(gòu)施工對(duì)既有地鐵隧道的影響分析[A];中國(guó)土木工程學(xué)會(huì)第十三屆年會(huì)暨隧道及地下工程分會(huì)第十五屆年會(huì)論文集[C];2008年
9 潘國(guó)兵;;地鐵隧道盾構(gòu)自動(dòng)導(dǎo)向系統(tǒng)測(cè)量誤差分析[A];第二屆“測(cè)繪科學(xué)前沿技術(shù)論壇”論文精選[C];2010年
10 劉波;劉紀(jì)峰;陳軍;趙宏奎;陶龍光;;地鐵隧道盾構(gòu)施工的縱向地表沉降預(yù)測(cè)研究[A];中國(guó)土木工程學(xué)會(huì)第十一屆、隧道及地下工程分會(huì)第十三屆年會(huì)論文集[C];2004年
相關(guān)重要報(bào)紙文章 前10條
1 孫雷;長(zhǎng)江隧道盾構(gòu)機(jī)運(yùn)輸項(xiàng)目花落華基[N];現(xiàn)代物流報(bào);2007年
2 通訊員 葛軍 顧肖艷 本報(bào)記者 劉洋;錢江隧道東線穿越百年防洪堤[N];中國(guó)交通報(bào);2012年
3 記者 張希 通訊員 王肖飛;大型隧道機(jī)械項(xiàng)目落戶濱江[N];南京日?qǐng)?bào);2010年
4 本報(bào)通訊員 靳玉東 段宏杰;中鐵隧道引領(lǐng)我國(guó)隧道科技跨入“穿江越洋”時(shí)代[N];中國(guó)建設(shè)報(bào);2014年
5 馮旭東;國(guó)內(nèi)最先進(jìn)隧道盾構(gòu)機(jī)制造完成[N];中國(guó)交通報(bào);2010年
6 記者 黃偉清邋方軍 通訊員 黃長(zhǎng)隧 朱萍 實(shí)習(xí)生 張菁;長(zhǎng)江隧道盾構(gòu)機(jī)主部件抵寧[N];南京日?qǐng)?bào);2007年
7 本報(bào)通訊員 黃長(zhǎng)隨邋朱萍 本報(bào)記者 黃偉清;目擊長(zhǎng)江隧道盾構(gòu)機(jī)掘進(jìn)江底[N];南京日?qǐng)?bào);2008年
8 楊捷;長(zhǎng)江隧道盾構(gòu)機(jī) 下穿武九鐵路線[N];長(zhǎng)江日?qǐng)?bào);2007年
9 陸偉軍邋康明;國(guó)內(nèi)最大隧道全線貫通 施工測(cè)量創(chuàng)造“四個(gè)最”[N];中國(guó)測(cè)繪報(bào);2008年
10 顧巍鐘;頭頂滔滔江水 鉆地橫穿天塹[N];新華日?qǐng)?bào);2008年
相關(guān)碩士學(xué)位論文 前10條
1 王星星;立交隧道地層敏感度及結(jié)構(gòu)適應(yīng)性研究[D];重慶交通大學(xué);2015年
2 余峰崗;黃土地鐵隧道盾構(gòu)施工地表沉降機(jī)理與控制措施研究[D];石家莊鐵道大學(xué);2014年
3 邵迅;地鐵隧道盾構(gòu)施工力學(xué)行為及破壞接近度評(píng)價(jià)方法研究[D];合肥工業(yè)大學(xué);2016年
4 孫延盼;隧道盾構(gòu)施工對(duì)鄰近建筑物的影響研究[D];蘇州科技學(xué)院;2015年
5 孟敏強(qiáng);飽和軟黃土地鐵隧道盾構(gòu)施工控制技術(shù)[D];西安科技大學(xué);2016年
6 徐濤;多因素耦合作用下的水下隧道盾構(gòu)施工安全風(fēng)險(xiǎn)控制研究[D];重慶交通大學(xué);2016年
7 肖博;重慶市兩江橋隧道及接口工程對(duì)既有軌道隧道的安全影響研究[D];重慶交通大學(xué);2016年
8 李茹;雙線隧道盾構(gòu)施工對(duì)鄰近樁基的影響分析[D];安徽建筑大學(xué);2016年
9 法賽(Faisal);雙線平行隧道盾構(gòu)施工引起的地表沉降研究[D];大連海事大學(xué);2017年
10 黃希;交叉盾構(gòu)隧道列車振動(dòng)響應(yīng)及其累積損傷研究[D];西南交通大學(xué);2017年
,本文編號(hào):1663279
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1663279.html