大跨斜拉橋索塔施工及控制技術(shù)研究
發(fā)布時(shí)間:2018-03-22 17:34
本文選題:斜拉橋 切入點(diǎn):下橫梁 出處:《公路》2017年05期 論文類型:期刊論文
【摘要】:以某大跨度斜拉橋橋塔施工為依托,對(duì)大跨度斜拉橋索塔施工及控制技術(shù)進(jìn)行了研究,結(jié)果表明,下橫梁分層澆筑在成本、結(jié)構(gòu)受力方面優(yōu)于中間設(shè)置后澆帶的方法,通過設(shè)置主動(dòng)橫撐和中塔柱預(yù)拱度,能夠有效地優(yōu)化傾斜索塔內(nèi)力,中塔柱合龍應(yīng)對(duì)合龍口溫度、線形進(jìn)行連續(xù)觀測,從而確定合龍時(shí)機(jī)。研究成果對(duì)同類橋梁索塔施工具有一定的借鑒意義。
[Abstract]:Based on the construction of the tower of a long-span cable-stayed bridge, the construction and control technology of the cable tower of the long-span cable-stayed bridge is studied. The results show that the method of layered pouring of the lower crossbeam is superior to the method of setting post-pouring belt in the aspects of cost and structural force. By setting the active transverse brace and the pre-arch of the middle tower column, the internal forces of the inclined tower can be effectively optimized. The research results can be used for reference in the construction of cable towers of similar bridges.
【作者單位】: 中鐵十二局集團(tuán)第一工程有限公司;長大橋梁建設(shè)施工技術(shù)交通行業(yè)重點(diǎn)實(shí)驗(yàn)室;中交第二航務(wù)工程局有限公司;
【分類號(hào)】:U445.4;U448.27
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄭東輝;黎榮歡;;南京三橋南主墩索塔施工測量方案[J];湖南交通科技;2006年04期
2 胡永;張會(huì)俊;郭慶智;;柳州三門江大橋索塔施工技術(shù)[J];鐵道建筑;2007年02期
3 江仲明;孟為宗;;六安市淠史杭大橋索塔施工技術(shù)[J];安徽建筑;2010年05期
4 陳錫林,李連法;京杭運(yùn)河淮陰一號(hào)橋索塔施工[J];橋梁建設(shè);1991年02期
5 劉玉蘭,,錢敬,龔漢甫,崔冰;銅陵大橋索塔施工控制[J];橋梁建設(shè);1995年02期
6 王永;;崖門大橋索塔施工測量[J];公路;2006年12期
7 劉火元;;舟山某大橋索塔施工[J];工程與建設(shè);2009年02期
8 游國華;;北盤江大橋索塔施工的主要工藝探析[J];科技創(chuàng)新導(dǎo)報(bào);2009年15期
9 王運(yùn)y
本文編號(hào):1649670
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/1649670.html
最近更新
教材專著