黃土隧道臺階法施工效應(yīng)及技術(shù)參數(shù)研究
本文關(guān)鍵詞:黃土隧道臺階法施工效應(yīng)及技術(shù)參數(shù)研究 出處:《石家莊鐵道大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 黃土隧道 臺階法 施工效應(yīng) 技術(shù)參數(shù) 數(shù)據(jù)統(tǒng)計(jì) 初支位移 初支應(yīng)力 塑性區(qū) 建議值
【摘要】:臺階法因?yàn)樵谒淼篱_挖過程中對圍巖的擾動次數(shù)比較少,有利于圍巖穩(wěn)定,有利于機(jī)械化施工,適應(yīng)性強(qiáng),工法易于轉(zhuǎn)變,施工組織和安全控制難度小應(yīng)該在未來一段時(shí)間內(nèi)仍是鐵路隧道的主要施工方法。而目前關(guān)于黃土隧道臺階法施工的規(guī)范還不夠全面和詳細(xì),本文針對此通過對寶蘭隧道資料的數(shù)據(jù)統(tǒng)計(jì)分析以及對不同施工技術(shù)參數(shù)如:臺階長度、高度、封閉距離工況條件進(jìn)行模擬計(jì)算,并對中下臺階開挖工序進(jìn)行優(yōu)化以及對輔助措施工工況進(jìn)行了模擬,得到一些結(jié)論,并給出施工技術(shù)參數(shù)建議值。(1)對黃土物理力學(xué)參數(shù)及臺階法技術(shù)參數(shù)進(jìn)行了統(tǒng)計(jì)分析,得到了各參數(shù)的統(tǒng)計(jì)值以及之間的關(guān)系。(2)通過對臺階長度、臺階高度工況模擬結(jié)果的對比分析得出了不同含水率條件下臺階長度、臺階高度對隧道開挖的影響規(guī)律并結(jié)合數(shù)據(jù)統(tǒng)計(jì)給出不同含水率條件下臺階長度、臺階高度的參考值。(3)通過對預(yù)留核心土開挖核心土不同尺寸的計(jì)算結(jié)果進(jìn)行對比分析,得出核心土能夠很好的控制掌子面的變形,且核心土尺寸越大,效果越明顯。給出建議值為核心土高為2 m左右,上下底為其所在高度洞寬的1/3~1/2,長度為3~4m左右。(4)通過對三種開挖工序的對比分析得出中槽先行左右交錯(cuò)開挖要優(yōu)于左右側(cè)交錯(cuò)開挖,而左右交錯(cuò)開挖要優(yōu)于中槽先行開挖,且給出了三種工序的施工技術(shù)參數(shù)參考值。中槽先行兩側(cè)交錯(cuò)開挖工序的施工技術(shù)參數(shù)建議值:上臺階核心土長度為5m左右,中臺階間隔距離為3~4 m,下臺階間隔4~6 m。左右交錯(cuò)開挖工序的施工技術(shù)參數(shù)建議值:上臺階核心土長度為5 m左右,中臺階左右兩側(cè)的間隔距離為2~4 m,下臺階左右兩側(cè)間隔距離為2 m左右。中槽先行開挖工序的施工技術(shù)參數(shù)建議值:上臺階核心土長度為5 m左右;中臺階先行距離為2~4 m,下臺階先行距離為4~6 m。(5)超前支護(hù)能很好地控制拱頂下沉,超前支護(hù)與臨時(shí)仰拱均能有效控制周邊收斂以及初支最大最小應(yīng)力及圍巖最大塑性應(yīng)變。給出輔助措施的施工技術(shù)參數(shù):超前支護(hù)的長度為4~5 m。
[Abstract]:Step method is beneficial to the stability of surrounding rock, mechanized construction, strong adaptability and easy to change because of the less disturbance times of surrounding rock in the excavation process of tunnel. Construction organization and safety control should be the main construction method of railway tunnel for some time in the future, but the current construction criterion of loess tunnel step method is not comprehensive and detailed enough. In this paper, through the statistical analysis of the data of Baolan Tunnel and the simulation of different construction technical parameters such as: step length, height, closed distance operating conditions. The excavation procedure of middle and lower steps is optimized and the working conditions of auxiliary measures are simulated, and some conclusions are obtained. The suggested value of construction technical parameters is given. (1) the physical and mechanical parameters of loess and the technical parameters of step method are statistically analyzed, and the statistical values of each parameter and the relationship between them are obtained. By comparing and analyzing the simulation results of bench height, the influence of step length and step height on tunnel excavation under different water content conditions is obtained, and the step length under different water content conditions is given in combination with data statistics. The reference value of step height. 3) through the comparison and analysis of the calculation results of different sizes of core soil excavated by reserved core soil, it is concluded that the core soil can control the deformation of palm surface very well, and the larger the size of core soil is. The more obvious the effect is, the suggested value is that the core soil height is about 2 m, and the upper and lower bottom is 1 / 3 / 1 / 2 of the width of the hole in which the core soil is located. Through the comparative analysis of the three excavation procedures, it is concluded that the left and right interleaving excavation is better than the left and right interleaving excavation, and the left and right interleaving excavation is better than the middle slot first excavation. The construction technical parameters of three kinds of working procedures are given. The construction technical parameters of the staggered excavation on both sides of the middle groove are suggested: the length of the core soil is about 5 m and the distance between the middle steps is 3 m. The construction technical parameters of the staggered excavation procedure are suggested: the core soil length of the upper step is about 5 m, and the distance between the left and right sides of the middle step is 2 ~ 4 m. The distance between the left and right sides of the lower step is about 2 m. The suggested value of the construction technical parameters of the first excavation procedure of the middle groove is: the length of the core soil of the upper step is about 5 m; The first distance of middle step is 2m, and the distance of lower step is 4m.) the advance support can control the sinking of the vault well. Both advanced support and temporary inverted arch can effectively control peripheral convergence, maximum and minimum stress of initial support and maximum plastic strain of surrounding rock. The construction technical parameters of auxiliary measures are given: the length of advance support is 4m.
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U455.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 樊東;;鄭西客專黃土隧道基礎(chǔ)沉降問題研究[J];科技創(chuàng)新導(dǎo)報(bào);2013年07期
2 ;黃土隧道設(shè)計(jì)中幾個(gè)問題的討論[J];鐵路標(biāo)準(zhǔn)設(shè)計(jì)通訊;1972年08期
3 潘昌實(shí);鐵路黃土隧道襯砌設(shè)計(jì)研究[J];土木工程學(xué)報(bào);1980年01期
4 楊嚴(yán);;淺埋黃土隧道下穿公路施工技術(shù)[J];中國西部科技;2014年07期
5 陳鶴,管振祥,喬春生;富水黃土隧道的開挖監(jiān)控及變形判別[J];巖土工程界;2002年10期
6 胡平;艾進(jìn)東;常海洲;李晉德;馮鴻干;;黃土隧道修筑技術(shù)[J];公路隧道;2005年04期
7 賀虹;李德武;;特大斷面黃土隧道靜力穩(wěn)定性分析[J];工程質(zhì)量;2006年09期
8 周尚國;;黃土隧道的主要地質(zhì)災(zāi)害類型[J];地質(zhì)與勘探;2007年02期
9 馬學(xué)寧;邢立軍;韓峰;;蘭青二線高廟黃土隧道開挖支護(hù)變形分析[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì);2007年06期
10 邢東泉;;大跨度黃土隧道的施工塌方防治技術(shù)[J];甘肅科技;2007年07期
相關(guān)會議論文 前10條
1 賈滿倉;;單線鐵路老黃土隧道的分類[A];甘肅巖石力學(xué)與工程進(jìn)展——第四次全國巖石力學(xué)與工程學(xué)術(shù)大會[C];1996年
2 蘇新民;;特大斷面黃土隧道有限元分析[A];第15屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集(第Ⅱ冊)[C];2006年
3 張金柱;郝文廣;;黃土隧道塌方情況及病害原因分析[A];第六屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會論文集[C];2007年
4 趙輝雄;喻渝;楊建民;;高速鐵路黃土隧道合理支護(hù)參數(shù)試驗(yàn)研究[A];自主創(chuàng)新與持續(xù)增長第十一屆中國科協(xié)年會論文集(2)[C];2009年
5 豆世康;趙秋林;李凌志;;客運(yùn)專線黃土隧道勘測設(shè)計(jì)中若干問題的探討[A];鐵路客運(yùn)專線建設(shè)技術(shù)交流會論文集[C];2005年
6 楊建民;;談鄭西客運(yùn)專線黃土隧道沉降控制及基礎(chǔ)處理[A];鐵路客運(yùn)專線建設(shè)技術(shù)交流會論文集[C];2005年
7 董濤;齊吉龍;萬甸甸;張建;;大斷面黃土隧道初襯結(jié)構(gòu)參數(shù)反演分析研究[A];中國煤炭學(xué)會成立五十周年系列文集2012年全國礦山建設(shè)學(xué)術(shù)會議專刊(下)[C];2012年
8 林東;;大斷面黃土隧道臺階六部開挖法[A];第四屆中國巖石錨固與注漿學(xué)術(shù)會議論文集[C];2007年
9 陳黨輝;劉旭全;馬海民;雷向鋒;晁平安;;大斷面黃土隧道與輔助坑道交叉口施工技術(shù)[A];客運(yùn)專線工程技術(shù)學(xué)術(shù)研討會論文集(上)[C];2008年
10 劉旭全;王永璽;雷向鋒;石新橋;竇忠孝;;監(jiān)控量測技術(shù)在客運(yùn)專線大斷面黃土隧道中的應(yīng)用[A];客運(yùn)專線工程技術(shù)學(xué)術(shù)研討會論文集(上)[C];2008年
相關(guān)重要報(bào)紙文章 前7條
1 通訊員 李佳笑;我國最大斷面黃土隧道報(bào)捷[N];中國鐵道建筑報(bào);2013年
2 江耀明 王桂元 馬寶喜;面對黃土:破解世界級難題[N];中國鐵道建筑報(bào);2006年
3 白秀喜邋通訊員 張紀(jì)平 劉健彪 銀平;世界最大斷面黃土隧道秦東隧道貫通[N];中國建設(shè)報(bào);2008年
4 記者 鄭鳳岐邋通訊員 江耀明 楊廣臣;世界首座大斷面富水黃土長隧道提前貫通[N];山西日報(bào);2008年
5 記者 溫格林;我國最大斷面黃土隧道——唐家塬隧道在陜順利貫通[N];現(xiàn)代物流報(bào);2014年
6 本報(bào)記者 張榮文 通訊員 李俊發(fā) 黃祖元;成事在人[N];中國鐵道建筑報(bào);2010年
7 本報(bào)特約記者 張榮文 本報(bào)通訊員 李俊發(fā) 黃祖元;成事在人[N];人民鐵道;2010年
相關(guān)博士學(xué)位論文 前4條
1 郭軍;客運(yùn)專線大斷面黃土隧道施工力學(xué)及支護(hù)設(shè)計(jì)理論研究[D];西南交通大學(xué);2008年
2 薛富春;富水黃土隧道隧底動力特性研究[D];西南交通大學(xué);2011年
3 李健;大斷面黃土隧道初支作用機(jī)理及變形控制技術(shù)研究[D];北京交通大學(xué);2012年
4 扈世民;大斷面黃土隧道圍巖變形特征及控制技術(shù)研究[D];北京交通大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 孟慶賀;淺埋大斷面黃土隧道灰土擠密樁復(fù)合地基受力與變形性狀研究[D];長安大學(xué);2015年
2 古彥超;深埋大斷面黃土隧道旋噴樁復(fù)合地基受力與變形性狀研究[D];長安大學(xué);2015年
3 錢聚強(qiáng);黃土隧道圍巖工程特性及穩(wěn)定性分析[D];西安建筑科技大學(xué);2015年
4 戎少偉;淺埋大跨黃土隧道力學(xué)特性及下穿構(gòu)筑物施工技術(shù)研究[D];石家莊鐵道大學(xué);2015年
5 馬賽;黃土隧道臺階法施工效應(yīng)及技術(shù)參數(shù)研究[D];石家莊鐵道大學(xué);2015年
6 軒俊杰;黃土隧道變形規(guī)律研究[D];長安大學(xué);2008年
7 張國輝;南山口黃土隧道施工技術(shù)研究[D];中國地質(zhì)大學(xué)(北京);2010年
8 周小賓;大跨富水黃土隧道的工程特性與施工技術(shù)研究[D];北京交通大學(xué);2008年
9 樊浩博;軟弱黃土隧道隧底受力變形特征與沉降控制研究[D];長安大學(xué);2014年
10 孫長海;公路黃土隧道的設(shè)計(jì)與施工技術(shù)研究[D];長安大學(xué);2007年
,本文編號:1412173