天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

營口中板變電站項(xiàng)目融資風(fēng)險及防范措施研究

發(fā)布時間:2018-01-19 19:34

  本文關(guān)鍵詞: 電力項(xiàng)目融資 風(fēng)險識別 風(fēng)險評價 應(yīng)對措施 出處:《華北電力大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


【摘要】:項(xiàng)目融資方法的發(fā)展表明,銀行貸款、債券融資、股票融資、項(xiàng)目融資都各自存在優(yōu)缺點(diǎn)。而項(xiàng)目融資作為一種新興的融資方式,比其他幾種傳統(tǒng)的融資方式更加適應(yīng)當(dāng)今國內(nèi)外政治、經(jīng)濟(jì)、社會環(huán)境的不斷變化,所以項(xiàng)目融資方式更加適于資本密集型的電力行業(yè)項(xiàng)目融資。 本文通過對五礦營口中板變電站新建項(xiàng)目融資風(fēng)險的識別,建立該項(xiàng)目融資風(fēng)險評價指標(biāo)體系,采用多層次風(fēng)險模糊評價模型對該項(xiàng)目的項(xiàng)目融資風(fēng)險進(jìn)行綜合評價,并針對評價結(jié)果提出相應(yīng)的預(yù)防措施。 通過分析研究,本文將五礦營口中板變電站新建項(xiàng)目融資風(fēng)險分為I級嚴(yán)重風(fēng)險、II級較嚴(yán)重風(fēng)險、III級一般風(fēng)險。在各分項(xiàng)風(fēng)險中,地方政府行政行為的風(fēng)險、鋼鐵行業(yè)監(jiān)管法律法規(guī)變更的風(fēng)險、突發(fā)性自然災(zāi)難風(fēng)險、招標(biāo)風(fēng)險等風(fēng)險為I級嚴(yán)重風(fēng)險;人為因素導(dǎo)致的各種風(fēng)險、無法完工風(fēng)險、審批風(fēng)險等風(fēng)險為II級較嚴(yán)重風(fēng)險;延期完工風(fēng)險、技術(shù)設(shè)計(jì)風(fēng)險、成本超支風(fēng)險、環(huán)保風(fēng)險等風(fēng)險為III級一般風(fēng)險。 最后本文針對不同的風(fēng)險等級,還提出了相應(yīng)的風(fēng)險防范措施,使項(xiàng)目投資方可以做到有的放矢,提高效率。
[Abstract]:The development of project financing methods shows that bank loans, bond financing, stock financing, project financing have their own advantages and disadvantages. Project financing as a new financing method. Compared with other traditional financing methods, project financing is more suitable for capital-intensive power industry project financing because of the constant changes of domestic and foreign politics, economy and social environment. Based on the identification of the financing risk of the new project in Yingkou Zhongban Substation of Minmetals, the evaluation index system of the project financing risk is established in this paper. The multi-level risk fuzzy evaluation model is used to evaluate the project financing risk comprehensively, and the corresponding preventive measures are put forward according to the evaluation results. Through the analysis and study, this paper divides the financing risk of the new project of Yingkou Zhongban Substation of Minmetals into class I serious risk, II serious risk and III grade general risk. The risk of the local government's administrative behavior, the risk of the change of the laws and regulations of the iron and steel industry, the risk of sudden natural disaster, the risk of bidding and so on are grade I serious risks. All kinds of risks caused by human factors, such as the risk of failure to complete, the risk of examination and approval, etc., are more serious risks of grade II; Delay completion risk, technical design risk, cost overrun risk, environmental risk and so on risk is III grade general risk. Finally, according to the different risk levels, the paper puts forward the corresponding risk prevention measures, so that the project investors can be targeted and improve efficiency.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F426.61;F406.7

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 俞云,琚向紅;我國企業(yè)項(xiàng)目融資風(fēng)險管理現(xiàn)存的問題及其對策[J];商業(yè)研究;2005年12期

2 林志宏;董學(xué)晨;喬宏;;基于粗糙集和熵模型的電力企業(yè)融資風(fēng)險評價[J];科技和產(chǎn)業(yè);2008年10期

3 柏松;馬紅;;關(guān)于電力項(xiàng)目融資風(fēng)險與融資方式的研究[J];電力勘測設(shè)計(jì);2008年03期

4 高祺勛;權(quán)聰娜;李博;馬麗;;灰色模糊CIM模型的電力項(xiàng)目融資風(fēng)險評判構(gòu)架[J];工業(yè)工程;2010年04期

5 王亞霆;李文興;;電力行業(yè)投融資風(fēng)險分析與評估[J];管理現(xiàn)代化;2008年03期

6 馬曉國;張福生;常春圃;;風(fēng)電CDM項(xiàng)目融資管理研究[J];中國管理信息化;2011年18期

7 何健;;基于多層次動態(tài)模糊評判的水電項(xiàng)目融資風(fēng)險評價模型[J];廣西水利水電;2008年02期

8 劉崇明;王曉穎;;火力發(fā)電項(xiàng)目融資風(fēng)險管理對策研究[J];華北電力大學(xué)學(xué)報(社會科學(xué)版);2009年03期

9 李偉明;張艷麗;;電力投資的風(fēng)險分析及解決方案[J];黑龍江科技信息;2008年35期

10 秀英;;我國電力企業(yè)投融資發(fā)展問題探析[J];經(jīng)濟(jì)論壇;2008年22期

,

本文編號:1445291

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/zhengzhijingjixuelunwen/1445291.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶1aa8e***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com