房地產(chǎn)項(xiàng)目設(shè)計階段成本控制研究
[Abstract]:The design stage is an important stage of the formation of the real estate project cost, which plays an important role in the composition of the final cost of the whole real estate project. To strengthen and perfect the cost control in the design stage, to optimize the cost of the real estate project, It is of great significance to improve the market competitiveness of real estate development enterprises. This article revolves around the real estate project design stage cost control related question unfolds, first of all, finds out the restriction present design stage cost control the main question, summarizes in three aspects: first, the designer to influence the cost the main factor not to know clearly; Second, designers are not willing to reduce costs; third, there is a lack of communication mechanism between design and cost budgeting personnel. Then, under the guidance of quota design theory and value engineering theory, it is proposed that the cost control in the project design stage should be strengthened from two aspects: technology and management. In the technical aspect, the main measures put forward in this paper are: according to the working procedure of the design stage, from the project design link, the preliminary design link, the construction drawing design link, Find out the main factors that affect the cost control in each link, namely, the key points of cost control, and make clear the main factors that affect the cost in the design stage, including the sufficient volume ratio, the sufficient building density, the reasonable determination of the height of the floor, and the balance of the earthwork of the site. Optimizing the amount of steel bar and concrete, and analyzing, combing and summing up, which is used to guide the optimization of cost control in the design stage, so as to solve the problem that the designers do not know clearly the main factors that affect the cost; In the aspect of management, this paper puts forward the following three aspects, including perfecting the bidding system of selecting the design unit, establishing the mechanism of reward and punishment of the design fee, and establishing the joint examination system of the design drawing. Thus enhancing the designers' willingness to reduce costs and establishing communication mechanism between design and cost budgeting personnel. Finally, the feasibility of the viewpoints and measures discussed in this paper is verified by an example of LX project. Through the study of the cost control in the design stage of real estate project, this paper establishes the system and measures of cost control in the design stage, and then forms a relatively complete management system, thus ensuring the realization of the cost control goal in the design phase.
【學(xué)位授予單位】:北京建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F299.233.42
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 周淑玲;項(xiàng)目設(shè)計階段如何加強(qiáng)造價管理[J];鄭州航空工業(yè)管理學(xué)院學(xué)報;1999年03期
2 周淑玲;;項(xiàng)目設(shè)計階段如何加強(qiáng)造價管理[J];鄭州航空工業(yè)管理學(xué)院學(xué)報;1999年03期
3 沈建忠;;房地產(chǎn)項(xiàng)目設(shè)計階段的成本控制[J];技術(shù)與市場;2009年07期
4 周力明;楊燕;;工程項(xiàng)目設(shè)計階段造價管理[J];科技信息;2009年22期
5 李悅軍;;房地產(chǎn)項(xiàng)目設(shè)計階段存在的問題與管理措施[J];中國高新技術(shù)企業(yè);2013年24期
6 桑云香;闞秋蕊;;淺談房地產(chǎn)項(xiàng)目設(shè)計階段的成本控制[J];建設(shè)科技;2006年14期
7 張久國;;工程項(xiàng)目設(shè)計階段的質(zhì)量控制[J];科技創(chuàng)新導(dǎo)報;2008年24期
8 馬建偉;;航天建設(shè)項(xiàng)目設(shè)計階段推行監(jiān)理的必要性研究[J];項(xiàng)目管理技術(shù);2013年10期
9 邢寧;;淺談建設(shè)項(xiàng)目設(shè)計階段的價值管理[J];中國勘察設(shè)計;2006年07期
10 鄧西錄;解成威;;工程項(xiàng)目設(shè)計階段質(zhì)量控制探討[J];中小企業(yè)管理與科技(下旬刊);2009年10期
相關(guān)會議論文 前10條
1 李海燕;宋文靜;李楠;;淺談建設(shè)項(xiàng)目設(shè)計階段的造價管理與控制[A];土木建筑學(xué)術(shù)文庫(第9卷)[C];2008年
2 徐峗;凌春;崔松芳;李紅;崔松濤;;水利工程項(xiàng)目設(shè)計階段的造價控制[A];濮陽市首屆學(xué)術(shù)年會論文選編[C];2006年
3 朱仁波;徐巍;;建設(shè)項(xiàng)目設(shè)計階段的工程造價控制[A];河南省土木建筑學(xué)會2010年學(xué)術(shù)研討會論文集[C];2010年
4 張小燕;熊德彬;;項(xiàng)目成本控制的關(guān)鍵[A];土木建筑學(xué)術(shù)文庫(第8卷)[C];2007年
5 曹程;梁廣輝;;淺析企業(yè)施工階段的成本控制[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
6 范承;魏寧;;施工企業(yè)項(xiàng)目成本控制制度淺析[A];河南省土木建筑學(xué)會2010年學(xué)術(shù)大會論文集[C];2010年
7 盧俊紅;冶偉峰;;淺析施工企業(yè)施工階段的成本控制[A];河南省土木建筑學(xué)會2010年學(xué)術(shù)研討會論文集[C];2010年
8 魏志文;;施工各階段成本控制要點(diǎn)分析[A];河南省土木建筑學(xué)會2009年學(xué)術(shù)大會論文集[C];2009年
9 宋廣州;張占峰;;項(xiàng)目成本控制的探討[A];土木建筑學(xué)術(shù)文庫(第16卷)[C];2012年
10 張麗;劉軍;;如何在施工項(xiàng)目管理中進(jìn)行成本控制[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
相關(guān)重要報紙文章 前10條
1 通訊員 向遠(yuǎn);中遠(yuǎn)香港集團(tuán)狠抓成本控制工作[N];中國遠(yuǎn)洋報;2012年
2 通訊員 劉萌;打響成本控制保衛(wèi)戰(zhàn)[N];中國遠(yuǎn)洋報;2012年
3 張奎;安徽礦機(jī)鑄造分公司 成本控制“算得精”[N];中國建材報;2014年
4 曉勇 海龍 星辦;成本控制大有可為[N];中國遠(yuǎn)洋報;2000年
5 牛平;戰(zhàn)略、方法與步驟——成本控制的整體規(guī)劃[N];經(jīng)理日報;2006年
6 浙江泰舜建設(shè)有限公司 王建祥邋楊煥堯;芻議項(xiàng)目成本控制管理[N];建筑時報;2007年
7 朱以師;成本控制要“先下手為強(qiáng)”[N];中國房地產(chǎn)報;2009年
8 通訊員 劉萌;大遠(yuǎn)著力打造成本控制文化[N];中國遠(yuǎn)洋報;2010年
9 煙臺市財政局 王宏志;成本控制面臨挑戰(zhàn),我國企業(yè)如何應(yīng)對[N];中國會計報;2010年
10 山西大學(xué) 李志強(qiáng);在市場經(jīng)濟(jì)條件下,更應(yīng)重視企業(yè)的成本控制[N];山西日報;2011年
相關(guān)博士學(xué)位論文 前2條
1 韓l毲,
本文編號:2139372
本文鏈接:http://sikaile.net/jingjilunwen/jingjiguanlilunwen/2139372.html