特高壓輸電工程效益綜合評(píng)價(jià)研究
本文選題:社會(huì)效益 切入點(diǎn):經(jīng)濟(jì)效益 出處:《華北電力大學(xué)》2014年碩士論文 論文類(lèi)型:學(xué)位論文
【摘要】:隨著經(jīng)濟(jì)的發(fā)展和社會(huì)的進(jìn)步,能源問(wèn)題越來(lái)越受到世界上各個(gè)國(guó)家的關(guān)注,已逐漸成為衡量國(guó)家綜合競(jìng)爭(zhēng)力的一項(xiàng)重要指標(biāo)。電力能源作為國(guó)家的重要能源之一,為國(guó)家經(jīng)濟(jì)的發(fā)展、科技的進(jìn)步、社會(huì)的穩(wěn)定等方面做出了重要貢獻(xiàn)。電網(wǎng)工程作為電力能源使用的基礎(chǔ),對(duì)服務(wù)經(jīng)濟(jì)社會(huì)有著不可忽略的作用。而隨著電力消費(fèi)量的不斷增加,對(duì)供電線路的要求越來(lái)越高,為減少長(zhǎng)距離供電過(guò)程中的損耗,越來(lái)越多的國(guó)家增加了高電壓及特高電壓線路的研究。 近年來(lái),我國(guó)電力負(fù)荷增長(zhǎng)速度較快,超高壓輸電工程逐漸出現(xiàn)了輸送能力不足、輸電走廊緊缺、遠(yuǎn)距離大容量輸送困難、環(huán)保壓力較大的問(wèn)題。同一般輸電線路相比,特高壓輸電線路體系具有電壓等級(jí)高、涉及面廣、跨度較大和海拔高等特點(diǎn),這也間接增加了特高壓輸電塔線體系建立的難度。本文結(jié)合實(shí)際工作,以哈密-鄭州±800kV直流輸電線路工程為例對(duì)特高壓輸電工程的效益進(jìn)行了研究。 在介紹了特高壓輸電工程的特點(diǎn)、優(yōu)勢(shì)及其存在的問(wèn)題和對(duì)策后,本文從經(jīng)濟(jì)效益、環(huán)境效益、社會(huì)效益和電網(wǎng)效益四個(gè)一級(jí)指標(biāo),盈利能力、償債能力、用戶滿意度等12個(gè)二級(jí)指標(biāo),凈現(xiàn)值率、投資利潤(rùn)率、投資回收期等23個(gè)指標(biāo)構(gòu)建了特高壓輸電工程綜合效益評(píng)價(jià)指標(biāo)體系。然后對(duì)后評(píng)價(jià)方法進(jìn)行了研究并選擇了模糊層次綜合評(píng)價(jià)法,對(duì)特高壓輸電工程的效益進(jìn)行了分析研究。根據(jù)分析結(jié)果我們發(fā)現(xiàn)該工程的效益介于一般和較好之間,其中社會(huì)效益水平較稍微接近于較好,經(jīng)濟(jì)效益和電網(wǎng)效益比一般稍微好,各方面效益均不理想。需建立廣泛的全國(guó)性特高壓輸電網(wǎng)絡(luò)線路。
[Abstract]:With the development of economy and social progress, the problem of energy has attracted more and more attention in various countries of the world, has gradually become an important indicator to measure the comprehensive competitiveness of the country. The electric energy is one of the important national energy, for the development of the national economy, progress of science and technology, make an important contribution to social stability and so on. As a basis for power grid engineering energy use, there can not be ignored for economic and social services. And with the increasing of power consumption, the power supply line of the increasingly high demand, in order to reduce the loss of long distance power supply in the process, more and more countries increase the research of high voltage and extra high voltage line.
In recent years, China's electric power load faster, UHV transmission engineering has gradually appeared insufficient transmission capacity of transmission corridor, long distance and large capacity shortage, difficulties in transportation, environmental pressure. Compared with the general transmission line, UHV transmission line system with high voltage level, involving a wide range, large span and high altitude, which also indirectly increases the establishment of UHV transmission tower line system. This paper combined with the actual work, studied in Hami - Zhengzhou 800kV HVDC line project for the benefit of UHV transmission project.
In the characteristics of UHV transmission technology, advantages and existing problems and countermeasures, this article from the economic benefits, environmental benefits, social benefits and power efficiency of four first level indicators, profitability, solvency, customer satisfaction 12 two level index, rate of net present value, the investment profit rate, investment payback period 23 indicators to build a comprehensive evaluation index system of UHV transmission project. Then studies and choose the fuzzy hierarchy comprehensive evaluation of post evaluation method of UHV transmission engineering efficiency were analyzed. According to the analysis results, we found that the benefits of the project between good and average level of social benefits, including is a little closer to the good economic efficiency and the benefit is slightly better than the general power grid, the benefits are not ideal. Need to establish a comprehensive national network of UHV transmission lines.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:TM72;F283
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李東偉;趙會(huì)茹;王鑫;;公共網(wǎng)絡(luò)輸變電項(xiàng)目效益后評(píng)價(jià)方法探討[J];電力技術(shù)經(jīng)濟(jì);2006年06期
2 鄭風(fēng)雷;;輸電網(wǎng)擴(kuò)展的社會(huì)經(jīng)濟(jì)性評(píng)估方法[J];電力系統(tǒng)及其自動(dòng)化學(xué)報(bào);2008年05期
3 代仕勇;彭曉濤;王丹;張志峰;李子壽;林常青;;基于模糊優(yōu)選的特高壓輸電方式綜合評(píng)價(jià)方法[J];高電壓技術(shù);2012年12期
4 ;Briefs & Events[J];Electricity;2007年01期
5 紀(jì)航;劉新平;楊慶華;孟夏卿;;基于模糊綜合評(píng)價(jià)的超高壓輸電線路狀態(tài)評(píng)估方法思考[J];華東電力;2009年07期
6 董軍;蔣雪;;輸電項(xiàng)目評(píng)價(jià)研究現(xiàn)狀綜述[J];華東電力;2010年03期
7 尤丹丹;張丹;;我國(guó)發(fā)展特高壓輸電中一些問(wèn)題的討論[J];科技信息;2012年13期
8 張娟;;泉頭河220kV送變電工程項(xiàng)目財(cái)務(wù)效益評(píng)價(jià)分析[J];科技致富向?qū)?2013年11期
9 ;Novel combinatorial algorithm for the problems of fuzzy grey multi-attribute group decision making[J];Journal of Systems Engineering and Electronics;2007年04期
10 白海峰;李宏男;;輸電線路桿塔疲勞可靠性研究[J];中國(guó)電機(jī)工程學(xué)報(bào);2008年06期