科林集團(tuán)金域緹香項(xiàng)目成本控制研究
本文關(guān)鍵詞:科林集團(tuán)金域緹香項(xiàng)目成本控制研究 出處:《吉林大學(xué)》2014年碩士論文 論文類(lèi)型:學(xué)位論文
更多相關(guān)文章: 項(xiàng)目開(kāi)發(fā) 成本階段性控制 保障措施
【摘要】:我國(guó)的房地產(chǎn)項(xiàng)目開(kāi)發(fā)大多以開(kāi)發(fā)商立項(xiàng)、設(shè)計(jì)單位與施工單位參與的模式為主,因此開(kāi)發(fā)商在項(xiàng)目開(kāi)發(fā)中的影響占主要部分,人為因素會(huì)在項(xiàng)目的實(shí)施過(guò)程中產(chǎn)生各種干擾,影響到成本管控的科學(xué)性和合理性。設(shè)計(jì)單位與施工單位之間是相互對(duì)立的關(guān)系,因此在工作配合方面缺乏積極性和主動(dòng)性,,客觀的降低了施工效率,項(xiàng)目開(kāi)發(fā)的各環(huán)節(jié)銜接也就不能夠連續(xù)。雖然可以通過(guò)有效的監(jiān)管降低單一階段內(nèi)的成本,但是不同階段之間的銜接空隙,造成了人力資源的浪費(fèi)和工期的浪費(fèi),從總體來(lái)看,反而增加了項(xiàng)目成本。在國(guó)內(nèi)的房地產(chǎn)項(xiàng)目開(kāi)發(fā)過(guò)程中,成本控制的實(shí)際情況往往與預(yù)想情況相差甚遠(yuǎn),各項(xiàng)目的實(shí)際消耗超出成本預(yù)算也是常見(jiàn)現(xiàn)象,因此必須高度重視我國(guó)的房地產(chǎn)項(xiàng)目成本控制研究。 房地產(chǎn)項(xiàng)目的成本主要由土地成本、建筑施工成本、間接成本(公關(guān)、管理等)構(gòu)成,房地產(chǎn)項(xiàng)目的成本管理主要從投資、設(shè)計(jì)、招標(biāo)、采購(gòu)和驗(yàn)收等環(huán)節(jié)入手,分階段進(jìn)行資金投資,分階段進(jìn)行成本控制,細(xì)化成本控制目標(biāo)、明確各階段成本控制舉措,最終實(shí)現(xiàn)項(xiàng)目整體成本的下降,從而提升項(xiàng)目的競(jìng)爭(zhēng)力和利潤(rùn)空間。以科林集團(tuán)的金域緹香為例,分析項(xiàng)目本身成本構(gòu)成情況以及當(dāng)前成本控制的管理情況,根據(jù)項(xiàng)目實(shí)際情況,結(jié)合成本控制理論分析其現(xiàn)存問(wèn)題,并提出針對(duì)性的舉措和保障性措施,用以確保房地產(chǎn)項(xiàng)目金域緹香的成本控制目標(biāo)的實(shí)現(xiàn)。成本控制舉措針對(duì)項(xiàng)目不同階段提出了具體的執(zhí)行方案,為了確保該成本控制體系的順利施行,制定了配套的成本控制措施保障措施,主要是三個(gè)方面的針對(duì)性舉措:一是對(duì)房地產(chǎn)企業(yè)項(xiàng)目管理部門(mén)、現(xiàn)場(chǎng)施工管理部門(mén)和公關(guān)部門(mén)進(jìn)行機(jī)構(gòu)精簡(jiǎn),削減行政成本;二是加強(qiáng)自身成本控制人才隊(duì)伍建設(shè),確保成本控制管理人員的素質(zhì);三是強(qiáng)化財(cái)務(wù)監(jiān)督,杜絕項(xiàng)目成本的非正常支出。通過(guò)跳出傳統(tǒng)的成本控制框架,從更為全面的角度分析房地產(chǎn)項(xiàng)目的成本控制方法,同時(shí)分析各環(huán)節(jié)中成本控制的實(shí)施方法,深入剖析項(xiàng)目成本的構(gòu)成,以探究更有效的成本控制方法。結(jié)合國(guó)內(nèi)外先進(jìn)成本控制理論,分析金域緹香的成本控制方法以及保障成本控制方案實(shí)現(xiàn)的措施。
[Abstract]:Real estate development projects in China are mostly developers, project design unit and construction unit in the main mode, so developers in the project development accounted for the major part, human factors will produce a variety of interference in the process of implementation of the project cost control, affect the scientificity and rationality. The relationship between design units and construction units is mutually exclusive. Therefore, lack of initiative and initiative in work coordination objectively reduces construction efficiency, and links of all links in project development cannot be continuous. Though effective supervision can reduce the cost in a single stage, the gap between different stages leads to the waste of human resources and the waste of time. In general, it increases the cost of project. In the development process of real estate projects in China, the actual situation of cost control is often far from the expected scenario. The actual consumption of each item exceeds the cost budget, which is also a common phenomenon. Therefore, we must attach great importance to the cost control research of real estate projects in China.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:F299.233.4;F275.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 邢旭昌;;試論如何控制人力資源管理成本[J];經(jīng)濟(jì)師;2009年06期
2 燕永貞,白明;建立掙值管理體系 集成控制項(xiàng)目進(jìn)度與成本[J];基建優(yōu)化;2004年02期
3 王生謙;施工項(xiàng)目成本管理初探[J];科技情報(bào)開(kāi)發(fā)與經(jīng)濟(jì);2004年04期
4 柯寶紅;夏鑫;;房地產(chǎn)開(kāi)發(fā)前期成本控制的研究[J];全國(guó)商情(理論研究);2011年02期
5 苗海峰;劉孝生;張潔;;人力資源管理成本控制探析[J];商場(chǎng)現(xiàn)代化;2009年01期
6 岑玢;董曉宏;;現(xiàn)代成本管理的五大理論[J];商場(chǎng)現(xiàn)代化;2009年03期
7 戚安邦;項(xiàng)目掙值分析方法中的錯(cuò)誤與解決方案[J];數(shù)量經(jīng)濟(jì)技術(shù)經(jīng)濟(jì)研究;2004年05期
8 王軼姝;;金融危機(jī)背景下房地產(chǎn)開(kāi)發(fā)成本控制研究[J];現(xiàn)代商貿(mào)工業(yè);2009年18期
9 吳飛紅;;中小企業(yè)內(nèi)部審計(jì)外包問(wèn)題研究[J];現(xiàn)代商貿(mào)工業(yè);2009年18期
10 高志偉;;房地產(chǎn)開(kāi)發(fā)成本管理研究[J];現(xiàn)代商貿(mào)工業(yè);2010年21期
本文編號(hào):1341503
本文鏈接:http://sikaile.net/jingjilunwen/jingjiguanlilunwen/1341503.html