大型格構(gòu)式雙肢鋼柱安裝關(guān)鍵技術(shù)
發(fā)布時(shí)間:2018-11-04 15:12
【摘要】:以某鋼柱安裝為例,介紹了鋼柱安裝的主要工藝流程及關(guān)鍵工序,并重點(diǎn)闡述了鋼柱安裝的技術(shù)難點(diǎn)及解決措施,按本技術(shù)施工取得了良好的施工效果。
[Abstract]:Taking a steel column installation as an example, this paper introduces the main technological process and key working procedure of steel column installation, and emphatically expounds the technical difficulties and solving measures of steel column installation. According to this technology, good construction results are obtained.
【作者單位】: 中冶天工集團(tuán)天津有限公司;
【分類(lèi)號(hào)】:TU758.11
,
本文編號(hào):2310219
[Abstract]:Taking a steel column installation as an example, this paper introduces the main technological process and key working procedure of steel column installation, and emphatically expounds the technical difficulties and solving measures of steel column installation. According to this technology, good construction results are obtained.
【作者單位】: 中冶天工集團(tuán)天津有限公司;
【分類(lèi)號(hào)】:TU758.11
,
本文編號(hào):2310219
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2310219.html
最近更新
教材專(zhuān)著