成都人民南路維護改造項目進度控制研究
[Abstract]:This paper studies the control schedule management of large-scale municipal engineering projects. Municipal construction project is one of the important components of government projects, which has the characteristics of large investment, wide influence, tight construction period, complex construction organization, and so on. For a long time, how to effectively carry out municipal engineering project management has always been a concern in the field of project management. The object of this study is the people's South Road maintenance and renovation project. As the project is located in the center of Chengdu, whether the organization of the project is reasonable or not will directly affect the life and work of most Chengdu citizens. It can be said that this is a full-body project. How to organize and implement the project effectively is a very important problem for the project decision makers. Combined with project practice, this paper focuses on solving the following problem: 1. 1. This paper focuses on the basic characteristics of large-scale municipal engineering construction projects, and discusses systematically how to plan the project systematically, how to identify the project stakeholders effectively, and how to reasonably analyze the project environment and so on. This paper focuses on the organizational characteristics and work breakdown structure of municipal engineering construction projects, and studies how to effectively apply the project objective management theory and the scope management theory to the municipal engineering construction project management. Project management is the method of applying theory, method, tools and technology to project practice activities. Therefore, this paper focuses on the development of management tools based on concrete engineering cases, and summarizes typical project network planning templates. Improve project organization and management capability. Through summarizing the optimization principle and method of municipal construction project schedule, this paper puts forward a complete project schedule generation method. Through summing up the relevant project schedule control flow and control principle, combining with the actual case, the paper puts forward the concrete form tool and analysis flow to the earned value management method in the project control.
【學位授予單位】:電子科技大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TU722
【相似文獻】
相關期刊論文 前10條
1 季文;項目成功的12個關鍵原則[J];技術與市場.園林工程;2004年06期
2 梁松波;項目管理專業(yè)基礎概述[J];上海標準化;2005年10期
3 張海東;;“法人管項目”下的人資管理[J];施工企業(yè)管理;2012年05期
4 徐亮輝;;汽車零部件企業(yè)的項目管理成熟度模型研究[J];上海汽車;2012年12期
5 和宏明;論西方項目范疇[J];基建優(yōu)化;1998年03期
6 賽云秀;;項目三大目標相互作用分析[J];建筑經濟;2008年08期
7 利鎮(zhèn)有;何繼善;;項目業(yè)績系統(tǒng)評價模型及其改良研究[J];中國工程科學;2011年08期
8 盧錫雷;;“法人管項目”利弊何在[J];施工企業(yè)管理;2012年05期
9 許心華,崔婷;前進中的中德合作山東糧援項目[J];山東水利科技;1998年03期
10 秦剛;;成功的項目管理事業(yè)[J];江西建材;2014年07期
相關會議論文 前10條
1 ;征集項目一覽表[A];2010’第五屆綠色財富(中國)論壇會刊[C];2010年
2 趙彬;焦書長;;“三次會議”制度推進項目穩(wěn)步持續(xù)發(fā)展[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
3 劉中平;周甄;李亞玲;馬韜;;項目團隊組織、分工與工作模式[A];2013年中國航空學會管理科學分會學術會議論文集[C];2013年
4 陳登慧;郭紅梅;;水土保持執(zhí)法項目目標競爭崗位責任制的形成與效益分析[A];水土保持監(jiān)督管理論文選編[C];2003年
5 馮亮;;用項目管理模式開展ICT外包服務項目[A];海南省通信學會學術年會論文集(2006)[C];2006年
6 盛漢濱;樊軍;王紀泉;;杭甬高速公路項目目標可持續(xù)發(fā)展評價[A];第一屆全國公路科技創(chuàng)新高層論壇論文集環(huán)保與可持續(xù)發(fā)展卷[C];2002年
7 紀存興;;項目管理在原子能院核電項目中的應用研究[A];中國核科學技術進展報告(第二卷)——中國核學會2011年學術年會論文集第10冊(核情報(含計算機技術)分卷、核技術經濟與管理現(xiàn)代化分卷)[C];2011年
8 楊來成;唐慧中;;改革管理機制 搞好藉河項目建設[A];中國水土保持探索與實踐——小流域可持續(xù)發(fā)展研討會論文集[C];2005年
9 王作功;賈元華;李素芬;;高速公路項目目標持續(xù)性評價指標體系及方法研究[A];可持續(xù)發(fā)展的中國交通——2005全國博士生學術論壇(交通運輸工程學科)論文集(上冊)[C];2005年
10 袁偉峰;;基于WBS的項目掙值分析及其應用[A];2011年中國航空學會管理科學分會學術交流會議論文集[C];2011年
相關重要報紙文章 前10條
1 崔晶煒;如何確定項目目標?[N];中國計算機報;2004年
2 記者 莊啟e,
本文編號:2194565
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2194565.html