大跨度重型鋼結(jié)構(gòu)廠房造價控制分析
[Abstract]:Under the new normal state of China's economic development, considering the trend of the heavy industrial field's demand for industrial factories towards the direction of greater span, higher carrying capacity, faster construction speed, less environmental damage and pollution, and better economy, Taking a practical project as the background, this paper intends to build a large-span single-story double-span heavy steel structure factory building as the research object, and analyzes the cost control method of the large-span heavy steel structure factory building from the three stages of design, manufacture, construction and installation. In the design stage, the sensitivity of steel content per unit area of steel frame, crane beam, support system, purlin and wall beam to the change of column spacing is studied by comparing and analyzing three kinds of column spacing layout schemes of 6 m ~ 9 m ~ (-1) ~ (12 m), such as steel frame, crane beam, support system, purlin, wall beam and so on. The results show that the amount of steel used in steel frame decreases with the increase of column distance, the amount of steel used in crane beam, support system, purlin and wall beam increases with the increase of column distance, and the steel content of the workshop is the least when the distance of column is 9 m. In the manufacturing stage, the influence of the production process, the equipment and the process of the key manufacturing procedure on the production cost of the steel structure factory building is analyzed. The results show that the proper selection of processing equipment and process in key manufacturing processes such as cutting, welding and coating has a significant effect on the cost of steel structure fabrication. Automatic submerged arc welding and airless spraying can effectively reduce the production cost of steel structures. In the stage of construction and installation, the influence of installation process, hoisting scheme, installation technology, labor force organization and equipment on installation cost is analyzed. The research results show that the installation cost of steel structure can be effectively reduced by selecting the automobile crane and arranging the machine shift according to the need, and considering all kinds of factors synthetically, Reasonable construction organization scheme and scientific construction management method can effectively control the installation cost of steel structure. Through the three stages of design, manufacture and installation, mainly considering the three elements of material, labor and construction tools, the reasonable suggestions for the cost control of large-span heavy steel structure factory building are put forward, which can provide a useful reference for the construction of this type of workshop.
【學(xué)位授予單位】:長安大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU391;TU201.7
【參考文獻(xiàn)】
相關(guān)期刊論文 前3條
1 吳賢官,王塘;建筑鋼結(jié)構(gòu)涂料涂裝[J];腐蝕與防護(hù);2002年09期
2 邱燦;魏立;范小娟;;無氣噴涂機(jī)在鋼結(jié)構(gòu)涂裝中的應(yīng)用[J];現(xiàn)代涂料與涂裝;2011年12期
3 ;《1996—2010年建筑技術(shù)政策》正式頒布[J];中國建設(shè)信息;1998年02期
相關(guān)博士學(xué)位論文 前2條
1 康靈果;大型火力發(fā)電廠少墻型鋼混凝土框架主廠房抗震性能試驗(yàn)與設(shè)計方法研究[D];西安建筑科技大學(xué);2009年
2 劉林;大型火電廠主廠房少墻型鋼混凝土框架結(jié)構(gòu)體系地震作用效應(yīng)與設(shè)計方法研究[D];西安建筑科技大學(xué);2009年
相關(guān)碩士學(xué)位論文 前8條
1 劉華峰;多跨重型廠房結(jié)構(gòu)體系與結(jié)構(gòu)分析研究[D];河海大學(xué);2007年
2 陳曉波;門式剛架輕型房屋鋼結(jié)構(gòu)經(jīng)濟(jì)性探索[D];重慶大學(xué);2007年
3 王霞;大型冶金工程項(xiàng)目進(jìn)度—成本聯(lián)合控制的研究[D];西安建筑科技大學(xué);2009年
4 劉睿;SXJS公司鋼結(jié)構(gòu)項(xiàng)目成本管理研究[D];西北大學(xué);2012年
5 胡長威;鋼管砼柱和鋼柱在中重型廠房中的對比分析[D];內(nèi)蒙古科技大學(xué);2012年
6 張林林;輕型門式剛架設(shè)計階段的優(yōu)化[D];哈爾濱工程大學(xué);2013年
7 宋少峰;SSE公司東源鋼結(jié)構(gòu)廠房建設(shè)項(xiàng)目實(shí)施管理研究[D];大連理工大學(xué);2013年
8 王明振;單層磚柱廠房震害分析及破壞機(jī)理研究[D];中國地震局工程力學(xué)研究所;2013年
,本文編號:2164120
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2164120.html