BIM技術(shù)在上海來福士廣場(chǎng)項(xiàng)目深基坑工程中的應(yīng)用
本文選題:基坑工程 + 深基坑; 參考:《城市住宅》2015年11期
【摘要】:隨著信息技術(shù)的發(fā)展,BIM技術(shù)在建筑行業(yè)得到越來越廣泛的應(yīng)用,但現(xiàn)階段主要集中在管線排布、施工模擬、工程量統(tǒng)計(jì)等方面,缺乏新應(yīng)用點(diǎn)。本文介紹了BIM技術(shù)在上海來福士廣場(chǎng)項(xiàng)目深基坑工程中的應(yīng)用,在鋼格構(gòu)柱施工策劃、支撐拆除部署、構(gòu)件優(yōu)化設(shè)計(jì)方面取得了一定成果,并獲得良好的經(jīng)濟(jì)和社會(huì)效益。
[Abstract]:With the development of information technology, BIM technology has been more and more widely used in the construction industry, but at the present stage, it is mainly focused on pipeline arrangement, construction simulation, engineering quantity statistics and so on, lacking of new application points. This paper introduces the application of BIM technology in the deep foundation pit engineering of Shanghai Lafusi Square Project. It has obtained some achievements in construction planning of steel lattice columns, support removal and deployment, and optimization design of components, and has obtained good economic and social benefits.
【作者單位】: 中國(guó)建筑一局(集團(tuán))有限公司;張家口市建設(shè)工程質(zhì)量監(jiān)督站;
【分類號(hào)】:TU753
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 岳菊紅,王海霖;深基坑施工中的監(jiān)測(cè)項(xiàng)目及其特點(diǎn)[J];中州煤炭;2003年03期
2 盧一凡;深基坑工程管理淺談[J];長(zhǎng)江建設(shè);2004年01期
3 黃宏偉,邊亦海;深基坑工程施工中的風(fēng)險(xiǎn)管理[J];地下空間與工程學(xué)報(bào);2005年04期
4 鐘才根;劉慧霞;;深基坑工程風(fēng)險(xiǎn)源分析及防范對(duì)策[J];建設(shè)監(jiān)理;2005年06期
5 何顯舜;莫振瀚;;淺談深基坑的安全施工[J];四川建材;2006年03期
6 陳芳;黨淑鳳;;深基坑工程環(huán)境安全風(fēng)險(xiǎn)的技術(shù)控制[J];安裝;2007年02期
7 王偉;劉征;;上海市區(qū)深基坑工程風(fēng)險(xiǎn)管理——上海恒升名邸深基坑工程[J];上海建設(shè)科技;2007年06期
8 陳軍;;風(fēng)險(xiǎn)管理理論在深基坑工程中的應(yīng)用[J];安徽建筑;2008年06期
9 楊鵬;;深基坑工程風(fēng)險(xiǎn)應(yīng)對(duì)策略分析[J];中華建設(shè);2008年12期
10 吳忠懷;;論某花園廣場(chǎng)的深基坑支護(hù)應(yīng)用[J];建材與裝飾(下旬刊);2008年01期
相關(guān)會(huì)議論文 前10條
1 施振東;;深基坑工程風(fēng)險(xiǎn)管理淺析[A];地基基礎(chǔ)工程與錨固注漿技術(shù):2009年地基基礎(chǔ)工程與錨固注漿技術(shù)研討會(huì)論文集[C];2009年
2 李,
本文編號(hào):2088307
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2088307.html