某大型儲(chǔ)罐工程巖土勘察研究
發(fā)布時(shí)間:2018-04-11 00:16
本文選題:大型儲(chǔ)罐 + 鉆探 ; 參考:《西安建筑科技大學(xué)》2015年碩士論文
【摘要】:我國(guó)的巖土種類多樣化,存在于巖土工程方面的問(wèn)題也復(fù)雜多樣,而好的巖土工程勘察工作方法對(duì)查明地質(zhì)條件,為工程建設(shè)提供可靠的地質(zhì)數(shù)據(jù)就顯得尤為重要。論文對(duì)國(guó)內(nèi)外巖土工程勘察的現(xiàn)狀和差異從專業(yè)體制、勘察理念、安全理念、勘察過(guò)程、勘察方法等方面進(jìn)行了詳細(xì)的比對(duì)分析;簡(jiǎn)述了我國(guó)巖土工程勘察中的幾種常用方法、包括工程地質(zhì)測(cè)繪、勘探與取樣、原位測(cè)試與室內(nèi)試驗(yàn)和現(xiàn)場(chǎng)檢驗(yàn)與監(jiān)測(cè)等,并對(duì)幾種勘察方法的使用目的、優(yōu)缺點(diǎn)和具體的一些試驗(yàn)內(nèi)容做了簡(jiǎn)要的介紹;分析了實(shí)際工程的地質(zhì)構(gòu)造和環(huán)境因素,列舉了工程所在地的地形地貌、氣象和水文等資料;通過(guò)在工程勘察過(guò)程中對(duì)鉆探、工程物探、原位測(cè)試和室內(nèi)試驗(yàn)等四種勘察方法和多種試驗(yàn)的組合運(yùn)用,收集、匯總、整理了大量的試驗(yàn)數(shù)據(jù),并對(duì)試驗(yàn)數(shù)據(jù)進(jìn)行了圖表化處理;對(duì)建設(shè)地的不良地質(zhì)狀況、巖土情況和場(chǎng)地適應(yīng)性等作出客觀的評(píng)價(jià)分析,對(duì)建設(shè)地的地基提出整體的治理和解決方案。通過(guò)對(duì)該工程巖土勘察的研究,參照所運(yùn)用的各類勘察方法、對(duì)勘察數(shù)據(jù)的圖表化處理方式及分析對(duì)比的思路,為類似大型儲(chǔ)罐工程和重要場(chǎng)所建設(shè)的巖土勘察工程提供了寶貴的勘察經(jīng)驗(yàn)。
[Abstract]:The variety of geotechnical types in China and the problems existing in geotechnical engineering are also complicated, and good methods of geotechnical engineering survey are particularly important for finding out geological conditions and providing reliable geological data for engineering construction.The present situation and difference of geotechnical engineering survey at home and abroad are compared and analyzed in detail from the aspects of professional system, reconnaissance idea, safety concept, survey process, survey method, etc. Several common methods in geotechnical engineering survey in China are briefly described.It includes engineering geological mapping, exploration and sampling, in-situ test and indoor test, field inspection and monitoring, etc. The purpose, advantages and disadvantages of several survey methods and some specific test contents are briefly introduced.The geological structure and environmental factors of the actual engineering are analyzed, and the topographic, geomorphological, meteorological and hydrological data of the site of the project are listed.Combined use of four survey methods and various tests, such as in situ test and indoor test, the collection, collection, collation and collation of a large number of test data, as well as the graphical treatment of the test data, as well as the bad geological conditions of the construction site,Through objective evaluation and analysis of geotechnical conditions and site adaptability, the overall treatment and solution to the foundation of the construction site are put forward.Through the study of geotechnical investigation of the project, referring to all kinds of survey methods used, the way of processing the survey data and the way of analysis and comparison are discussed.It provides valuable exploration experience for geotechnical survey engineering similar to large storage tank project and important site construction.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TE972;TU195
【引證文獻(xiàn)】
相關(guān)會(huì)議論文 前1條
1 趙衛(wèi)民;;淺談國(guó)內(nèi)外巖土工程勘察的幾點(diǎn)體會(huì)[A];吉林省土木建筑學(xué)會(huì)2012年學(xué)術(shù)年會(huì)論文[C];2012年
,本文編號(hào):1733580
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/1733580.html
最近更新
教材專著