天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

施工階段工程造價(jià)動態(tài)預(yù)控方法研究

發(fā)布時(shí)間:2018-03-25 09:47

  本文選題:施工階段 切入點(diǎn):工程造價(jià) 出處:《沈陽建筑大學(xué)》2015年碩士論文


【摘要】:在工程項(xiàng)目建設(shè)期間,作為建筑產(chǎn)品形成期,施工階段的現(xiàn)場資源配置引起的工程造價(jià)變動很大,作業(yè)人員的技術(shù)水平、原材料的精確配置、主輔設(shè)備的選擇,工程趕工導(dǎo)致的工期壓縮,是工程造價(jià)增大的重要原因。隨著建筑施工技術(shù)的日益成熟和工程管理手段的不斷豐富,工程項(xiàng)目質(zhì)量、工期、成本等多目標(biāo)的均衡優(yōu)化已成為工程造價(jià)發(fā)展的必然趨勢,基于此,如何科學(xué)的進(jìn)行資源配置,如何在工序質(zhì)量定位基礎(chǔ)上規(guī)劃資源質(zhì)量等級,提高效率、降低損耗,如何使資源使用效率最大化,工期壓縮導(dǎo)致的質(zhì)量降低幅度最小化,是實(shí)現(xiàn)施工階段工程造價(jià)最優(yōu)化的有效途徑。本文總體上立足于工程施工階段,側(cè)重于人力、物力資源優(yōu)化配置,借助規(guī)劃理論實(shí)現(xiàn)人力資源和物力資源的具體量化,以期解決資源配置制約工程造價(jià)最優(yōu)化的瓶頸問題;側(cè)重施工階段工人分級、材料配置、主輔設(shè)備協(xié)調(diào)的綜合質(zhì)量水平,借助規(guī)劃理論實(shí)現(xiàn)資源的具體量化,以期解決基于質(zhì)量控制的工程造價(jià)優(yōu)化問題;側(cè)重工藝連續(xù)、資源匹配、質(zhì)量合格,借助規(guī)劃理論對工期進(jìn)行壓縮,讓實(shí)際工期趨于原工期,實(shí)際人工量趨于原計(jì)劃用量,降低實(shí)際造價(jià)與原造價(jià)幅度差,實(shí)現(xiàn)工期壓縮導(dǎo)致的工程造價(jià)最優(yōu)化。本文研究內(nèi)容主要包括如下幾個(gè)部分:以工程造價(jià)控制理論為基礎(chǔ),總結(jié)剖析了施工階段工程造價(jià)信息數(shù)據(jù)控制、預(yù)測、調(diào)整等方面的研究現(xiàn)狀,結(jié)合建筑工程施工特點(diǎn),提出了施工階段工程造價(jià)動態(tài)預(yù)控理念。結(jié)合施工階段工程造價(jià)動態(tài)、彈性、系統(tǒng)、信息反饋等控制原理,分析施工階段工程造價(jià)的影響因素,系統(tǒng)闡述了施工階段工程造價(jià)動態(tài)控制的流程與環(huán)節(jié)。借助灰色理論,構(gòu)建GM(1,1)模型對施工階段工程造價(jià)實(shí)時(shí)預(yù)測,進(jìn)行偏差分析,及時(shí)找出偏差原因,確定動態(tài)調(diào)整措施。應(yīng)用規(guī)劃理論,在考慮人力、物力資源協(xié)調(diào)均衡的各種約束下,以顯性成本與隱性成本最小化為目標(biāo)函數(shù),建立了基于資源配置的工程造價(jià)優(yōu)化調(diào)整模型;在考慮施工作業(yè)人員的質(zhì)量活動能力、設(shè)備供應(yīng)協(xié)調(diào)度、材料配置水平等各種約束下,兼顧質(zhì)量合格,以資源用量與質(zhì)量等級最小化為目標(biāo)函數(shù),建立了基于工程質(zhì)量的工程造價(jià)優(yōu)化調(diào)整模型;在考慮資源最大使用率、工作面限制、工人用料速度、工藝連續(xù)等各種約束下,以工壓縮期成本與資源增量最小化為目標(biāo)函數(shù),建立了基于工期壓縮的工程造價(jià)優(yōu)化調(diào)整模型。通過實(shí)例應(yīng)用進(jìn)行對比分析,驗(yàn)證優(yōu)化后的方案同傳統(tǒng)方案相比,顯著降低了工程造價(jià),對施工階段工程造價(jià)實(shí)踐提供了定量優(yōu)化技術(shù)支持。
[Abstract]:During the construction period of the project, as the forming period of the construction products, the site resource allocation in the construction stage caused great changes in the project cost, the technical level of the operators, the accurate allocation of raw materials, the selection of the main and auxiliary equipment, With the maturation of construction technology and the continuous enrichment of engineering management means, the quality of project, the duration of project, the quality of project, the construction period, the quality of the project, the construction period, the quality of the project, the quality of the project, the duration of the project, The balanced optimization of cost and other multi-objective has become an inevitable trend of construction cost development. Based on this, how to scientifically allocate resources, how to plan resource quality grade on the basis of process quality positioning, how to improve efficiency and reduce wastage, etc. How to maximize the efficiency of the use of resources and minimize the reduction of quality caused by the compression of construction period is an effective way to realize the optimization of engineering cost in the construction phase. In order to solve the bottleneck problem which restricts the optimization of project cost, the optimization allocation of material resources is realized with the aid of planning theory, and the workers' grading and material allocation in construction stage are emphasized. In order to solve the problem of engineering cost optimization based on quality control, the coordinated comprehensive quality level of main and auxiliary equipment can be realized by means of planning theory. With the help of the planning theory, the time limit is compressed to make the actual time limit tend to the original time limit, and the actual manpower quantity tends to the original plan amount, so as to reduce the difference between the actual cost and the original cost. The main contents of this paper are as follows: based on the theory of project cost control, this paper summarizes and analyzes the information data control of construction cost in construction stage. According to the characteristics of construction, this paper puts forward the idea of dynamic pre-control of construction cost in construction stage, combining with the control principles of construction cost dynamics, elasticity, system, information feedback and so on. This paper analyzes the influencing factors of engineering cost in construction stage, and expounds systematically the process and link of dynamic control of project cost in construction stage. With the help of grey theory, the author constructs GM1 / 1) model to predict the construction cost in real time and analyzes the deviation of the construction cost in real time. To find out the cause of deviation in time, to determine the dynamic adjustment measures. Under the constraints of considering the balance of manpower and material resources, the objective function is to minimize the explicit cost and implicit cost. The optimization and adjustment model of engineering cost based on resource allocation is established, which takes into account the quality activity ability of construction workers, the coordination degree of equipment supply, the level of material allocation, and so on. Taking the minimization of resource consumption and quality grade as the objective function, a project cost optimization and adjustment model based on engineering quality is established, which takes into account the maximum utilization rate of resources, the working face limitation, the speed of material used by workers, the continuous process, and so on. Taking the minimization of cost and resource increment as objective function, an optimal adjustment model of project cost based on duration compression is established. The comparison between the optimized scheme and the traditional scheme is carried out through the application of an example. It reduces the engineering cost significantly and provides the quantitative optimization technical support for the engineering cost practice in the construction stage.
【學(xué)位授予單位】:沈陽建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU723.3

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 艾 瑋,王 鵬,朱志強(qiáng);談降低工程造價(jià)的途徑和措施[J];河北建筑科技學(xué)院學(xué)報(bào)(社科版);2001年03期

2 ;控制工程造價(jià)的幾個(gè)關(guān)鍵環(huán)節(jié)[J];中國電力企業(yè)管理;2001年09期

3 楊詠梅;工程造價(jià)超概算原因及對策[J];當(dāng)代建設(shè);2002年01期

4 海根;2001年全國工程造價(jià)軟件和網(wǎng)絡(luò)研討會在京召開[J];中國建材;2002年05期

5 程鴻群;王先甲;;工程造價(jià)的優(yōu)化確定分析[J];科技進(jìn)步與對策;2003年11期

6 戴小蓓;淺談如何做好工程造價(jià)的審核工作[J];山西建筑;2003年08期

7 于德洪,訾寬,陶磊;如何有效的控制工程造價(jià)[J];遼寧建材;2004年01期

8 黃勇;;加強(qiáng)工程造價(jià)管理,合理控制工程造價(jià)[J];寧夏電力;2004年S1期

9 楊正民;;淺析工程造價(jià)之發(fā)展趨勢[J];陰山學(xué)刊(自然科學(xué)版);2005年03期

10 高靜;蔣鋒;李偉騰;;工程造價(jià)有效控制的探討[J];防災(zāi)技術(shù)高等專科學(xué)校學(xué)報(bào);2005年04期

相關(guān)會議論文 前10條

1 張嘉利;;工程造價(jià)的幾個(gè)關(guān)鍵環(huán)節(jié)[A];土木建筑學(xué)術(shù)文庫(第7卷)[C];2007年

2 高田冰;劉長明;趙春陽;;論工程造價(jià)咨詢對控制工程造價(jià)的影響[A];2013年海峽兩岸經(jīng)濟(jì)管理學(xué)術(shù)研討會論文集[C];2013年

3 王艷艷;陳起俊;黃偉典;周景陽;;工程造價(jià)專業(yè)實(shí)驗(yàn)教學(xué)改革的研究[A];土木建筑教育改革理論與實(shí)踐[C];2009年

4 張美文;;工程造價(jià)有效控制的方法[A];科學(xué)發(fā)展——七省市第九屆建筑市場與招標(biāo)投標(biāo)優(yōu)秀論文集[C];2009年

5 熊艷;郭宇波;;工程造價(jià)現(xiàn)狀及發(fā)展對策研究[A];土木建筑學(xué)術(shù)文庫(第14卷)[C];2010年

6 史紅梅;馬麗;;工程造價(jià)的全過程管理[A];河南省土木建筑學(xué)會2008年學(xué)術(shù)大會論文集[C];2008年

7 陸愛霞;張芳芳;;淺析施工企業(yè)工程造價(jià)的全過程管理[A];土木建筑學(xué)術(shù)文庫(第12卷)[C];2009年

8 程峰;;工程造價(jià)的結(jié)算審核[A];土木建筑學(xué)術(shù)文庫(第15卷)[C];2011年

9 徐傳磊;王欣;;淺談工程造價(jià)的控制[A];土木建筑學(xué)術(shù)文庫(第15卷)[C];2011年

10 肖鋒;楊海島;;計(jì)算機(jī)在工程造價(jià)中的應(yīng)用和前景[A];土木建筑學(xué)術(shù)文庫(第9卷)[C];2008年

相關(guān)重要報(bào)紙文章 前10條

1 徐君觀;工程造價(jià)不能一味求“低”[N];廣東建設(shè)報(bào);2004年

2 徐君雙;市場經(jīng)濟(jì)中如何規(guī)范工程造價(jià)[N];建筑時(shí)報(bào);2004年

3 呂梁公路分局 王敏;怎樣有效控制工程造價(jià)[N];山西科技報(bào);2004年

4 記者 劉祥飛;工程造價(jià):念好四字“真言”[N];中國石油報(bào);2006年

5 記者 潘從武;工程造價(jià)作假最高罰十萬[N];法制日報(bào);2009年

6 鄭曉東;工程造價(jià)類司法鑒定案件存在的問題及對策[N];建筑時(shí)報(bào);2011年

7 鄭曉東;工程造價(jià)案件呈現(xiàn)四大特點(diǎn)[N];建筑時(shí)報(bào);2011年

8 浙江中聯(lián)建設(shè)集團(tuán)有限公司 王鐵鋒 張萍;如何控制園林景觀工程造價(jià)[N];建筑時(shí)報(bào);2011年

9 張新福 李中東;工程造價(jià)全程管理方法初探[N];江蘇經(jīng)濟(jì)報(bào);2013年

10 記者 任思源;濟(jì)寧:審計(jì)60個(gè)政府投建項(xiàng)目 審減工程造價(jià)1.8億[N];財(cái)會信報(bào);2012年

相關(guān)博士學(xué)位論文 前2條

1 侯波;公路工程造價(jià)管理體系及確定方法與控制模式研究[D];長安大學(xué);2010年

2 彭光金;小樣本工程造價(jià)數(shù)據(jù)的智能學(xué)習(xí)方法及其在輸變電工程中的應(yīng)用研究[D];重慶大學(xué);2010年

相關(guān)碩士學(xué)位論文 前10條

1 劉鵬;工程造價(jià)本科畢業(yè)生專業(yè)能力評價(jià)研究[D];長安大學(xué);2015年

2 方遠(yuǎn);我國政府投資工程造價(jià)管理問題研究[D];廣西大學(xué);2015年

3 朱澤松;工程變更因素對工程造價(jià)的影響分析[D];安徽建筑大學(xué);2015年

4 袁s,

本文編號:1662583


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/1662583.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶7b13c***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com