海陽煙草1532直營店項目投資風險評價研究
[Abstract]:As we all know, the project investment risk evaluation is closely related to the success or failure of the project investment, Haiyang Tobacco 1532 Direct Store project is no exception. Under this background, it is of great theoretical and practical significance to study the investment risk evaluation of Haiyang Tobacco 1532 Direct Store Project. The purpose of this paper is to analyze and control the investment risk of Haiyang Tobacco 1532 Direct Store Project. Among them, risk analysis includes risk identification and risk evaluation. Risk identification refers to finding out the investment risk factors likely to be faced by Haiyang Tobacco 1532 Direct Store Project, and risk evaluation is measured. The risk control is based on the results of the first two steps and puts forward the countermeasures and suggestions to solve the investment risk of Haiyang Tobacco 1532 Direct Store Project. The main research methods of this paper are as follows: one is the research method which combines theoretical research with field research, that is, referring to a large number of relevant literature and materials at home and abroad. From the summary of the current scholars on investment risk management research point of view and degree, for the study of this project to provide theoretical support and methods of risk management reference, through field investigation, can obtain the most real and most effective information; The other is the research method of combining qualitative analysis with quantitative analysis, through the qualitative analysis of the risks faced by investment projects, the use of AHP method, fuzzy comprehensive evaluation method, Principal component Analysis (PCA) is used to analyze the investment risk of Haiyang Tobacco 1532 Direct Store Project. The evaluation index system and evaluation model of the project are constructed, and the evaluation results and suggestions are given. To sum up, the research framework of this paper can be summarized as follows: introduction (basis and background of topic selection, review of domestic and foreign research status, research contents and methods), The theoretical basis and research methods of project investment risk management (the basic contents of project investment risk management, the general process of project investment risk management), Introduction to the Project of Haiyang Tobacco 1532 Direct Store (Project profile, Project background, Project schedule and Investment, etc.) Internal and external environment analysis of the project) Haiyang Tobacco 1532 Direct Store project investment risk identification (project investment risk identification principles and methods, project investment risk factors, The process and result of project investment risk identification) Haiyang Tobacco 1532 Direct Store Project Investment risk Assessment (Haiyang Tobacco 1532 Direct Store Project Investment risk Fuzzy Evaluation, Haiyang Tobacco 1532 Direct Store Project Investment risk single Factor Evaluation, Haiyang Tobacco 1532 Direct Store Project Investment risk Assessment, Haiyang Tobacco 1532 Direct Store Project Investment risk Assessment, Haiyang Tobacco 1532 Direct Store Project Investment risk Fuzzy Evaluation, Haiyang Tobacco 1532 Direct Store Project Investment risk Evaluation, Haiyang Tobacco 1532 Direct Store Project Investment risk Comprehensive Evaluation) Haiyang Tobacco 1 532 Direct Store Project Investment risk Control suggestion (risk response measures, risk monitoring measures) conclusion. The main contents of this paper are seven parts. The innovation of this paper lies in adopting the case analysis method, focusing on the investment risk evaluation research for Haiyang Tobacco 1532 Direct Store Project, and discussing the effectiveness of establishing a comprehensive and reliable index system of risk evaluation and selecting science. On the basis of the simple evaluation method, this paper provides a reference for the investment of the 1532 direct store project, reduces the investment risk, and serves as the basis for similar research in the future. Finally, the author hopes to further analyze the data in the financial statements after the project is formally put into production, and perfect the conclusion of this paper by using the estimated financial data. Finally, the actual control and avoidance of the project risk of Haiyang Tobacco 1532 Direct Store is realized.
【學位授予單位】:中國海洋大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:F721
【參考文獻】
相關期刊論文 前5條
1 王作功;李慧洋;賈元華;;一種可用于高速公路投資風險評估的神經(jīng)網(wǎng)絡模型[J];交通運輸系統(tǒng)工程與信息;2013年04期
2 朱延福;張建平;;中外投資環(huán)境評價方法論的演進述評[J];湖北經(jīng)濟學院學報;2012年05期
3 陳偉;張永超;田世海;;基于熵權(quán)群組決策法的高新技術企業(yè)項目投資風險評價研究[J];科技進步與對策;2011年01期
4 張靜文,徐渝,柴國榮,朱少英;高新技術項目投資風險評價方法的比較研究[J];研究與發(fā)展管理;2004年02期
5 粟國敏;房地產(chǎn)項目投資風險評價研究[J];工業(yè)技術經(jīng)濟;2003年06期
相關博士學位論文 前6條
1 黃輝;基于不同目標的城市污水處理項目投資方案評價研究[D];重慶大學;2014年
2 劉珂;可再生能源發(fā)電投資風險分析與評估模型[D];華北電力大學;2013年
3 倪任付;我國水泥行業(yè)項目投資風險管理研究[D];中國礦業(yè)大學(北京);2013年
4 張路;國有資本境外投資的風險控制及評價研究[D];財政部財政科學研究所;2012年
5 王明和;基于語言變量的房地產(chǎn)項目投資風險評價研究[D];北京交通大學;2012年
6 唐朝賢;生物質(zhì)發(fā)電項目投資風險分析與決策研究[D];中南大學;2011年
相關碩士學位論文 前10條
1 王燕斌;太陽能光伏發(fā)電項目投資風險管理研究[D];中國科學院大學(工程管理與信息技術學院);2014年
2 佟艷;港口項目投資風險評價研究[D];大連海事大學;2014年
3 李洪娟;房地產(chǎn)項目投資風險評價研究[D];河北工業(yè)大學;2014年
4 韓延華;唐山鳳凰新城項目投資風險評價研究[D];燕山大學;2013年
5 溫方方;房地產(chǎn)項目投資風險分析和評價研究[D];西安建筑科技大學;2013年
6 常勝利;城市軌道交通BT項目投資風險評價研究[D];石家莊鐵道大學;2013年
7 楊曉玲;發(fā)電企業(yè)基建項目投資風險分析與決策理論研究[D];華北電力大學;2012年
8 沈永杰;臨沂銀座中心項目投資風險管理案例分析[D];陜西師范大學;2012年
9 袁國宏;南京星雨華府項目投資風險評價研究[D];西安建筑科技大學;2012年
10 韓迎;鋼鐵項目投資風險評價體系研究[D];西安建筑科技大學;2012年
,本文編號:2251398
本文鏈接:http://sikaile.net/jingjilunwen/guojimaoyilunwen/2251398.html