四川YC工廠易地技術(shù)改造工程項(xiàng)目可行性研究
[Abstract]:Since the beginning of the last century, the theory of feasibility research has achieved a qualitative leap, and its application in practice involves all aspects and levels of project operation. Now, a relatively independent scientific research system has been formed. The modern project feasibility study is no longer a single field of research and analysis, involving various professional areas, investment projects need to use the theory of various professional disciplines for cross-demonstration and analysis. At present, many countries in the world have achieved fruitful results in the project feasibility study system. As a key link in the project feasibility study, the financial evaluation and risk management have achieved remarkable results. The research results of system science further solidify the foundation for the maturation of modern feasibility theory. As a scientific method of investment analysis of engineering projects, feasibility study is of great importance in the development of social economy. Sichuan YC factory is one of the main cigarette production points in Sichuan and Chongqing cigarette Company. It is one of the leading enterprises and production intensive enterprises in Sichuan Province, and has been identified as one of the 36 key enterprises in tobacco industry by the state. With the expansion of production scale and the adjustment of product structure, the production capacity of the factory has been insufficient, the adaptability of silk making process is poor, the technology of process equipment is backward and the ability of ensuring process quality is low. It can not meet the needs of high-end cigarette brand production technology, which seriously affects the operation and development of Sichuan YC factory. Taking into account the fact that the factory is located in the original earthquake-stricken area, the original site is seriously damaged, the original supporting facilities and equipment are unable to meet the demand for production capacity, and there is no land available for sustainable production and development in the plant at present. To the original production plant for the overall relocation of the project for the technical transformation of the land. In this paper, the project of technical transformation of YC factory in Sichuan province is taken as the feasibility study object, and the investment project is analyzed and studied according to the framework of the feasibility study of the project. The main contents of the feasibility study of the project include: market, technology, progress, environment, human resources and other related feasibility analysis, focusing on the financial, risk management and control aspects of the demonstration and analysis, The above three aspects constitute the feasibility study system of the project in this paper, and each aspect has a great influence on the project system demonstration and project investment decision. According to the analysis results, the conclusion of feasibility of the project is drawn. Based on the investigation and systematic analysis of the actual situation of the project, this paper applies the theory of risk management to identify and evaluate the risk in detail from the point of view of management, according to the concrete problems existing in the manifestation of the project risk. Systematic and comprehensive put forward the idea and countermeasure of supervision risk. In the actual risk management and control, this paper puts forward the method of "tripartite joint management account", and uses the means of information technology to manage the risk of the project construction link funds, and provides the scientific basis and solution for the relevant decision of the investor. And strive to provide a more ideal control means for the related industries to solve the project management risks.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F426.8
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 N.J.Gibbs;J.Sroka;林光民;;為籌措資金進(jìn)行的可行性研究——銀行家在工程貸款申請中期待著什么?[J];國外金屬礦采礦;1979年09期
2 ;一個可行性研究的邏輯程序[J];有色礦山;1979年04期
3 張玉娥;可行性研究座談會[J];煤礦設(shè)計(jì);1980年04期
4 ;可行性研究[J];金屬礦山;1980年03期
5 莫友怡;;淺談可行性研究[J];有色礦山;1980年06期
6 林易;可行性研究[J];化工礦山技術(shù);1981年02期
7 ;可行性研究工作通訊[J];煤礦設(shè)計(jì);1981年02期
8 王松山;對可行性研究工作的幾點(diǎn)建議[J];煤礦設(shè)計(jì);1981年11期
9 楊城;可行性研究[J];現(xiàn)代化工;1981年02期
10 程志曄;;簡介可行性研究[J];河南化工;1981年02期
相關(guān)會議論文 前10條
1 顧肖蒙;孫雪;;中國政府購買體育場館公共服務(wù)的可行性研究[A];第九屆全國體育科學(xué)大會論文摘要匯編(2)[C];2011年
2 趙增翔;劉洪俊;;趣味田徑在田徑教學(xué)中的可行性研究[A];中國體育科學(xué)學(xué)會運(yùn)動訓(xùn)練學(xué)分會第六屆全國田徑運(yùn)動發(fā)展研究成果交流會論文集[C];2013年
3 張永倫;;項(xiàng)目可行性研究的可靠性問題[A];中國金屬學(xué)會冶金技術(shù)經(jīng)濟(jì)專業(yè)委員會第七屆年會論文集[C];2001年
4 付軍明;;改進(jìn)可行性研究工作建議[A];中國公路學(xué)會2004年學(xué)術(shù)年會論文集[C];2004年
5 孫翠云;;淺析建設(shè)項(xiàng)目可行性研究及出現(xiàn)的問題與對策[A];土木建筑學(xué)術(shù)文庫(第16卷)[C];2012年
6 王世平;潛德元;;推行說理性處罰決定書必要性與可行性研究[A];浙江煙草(2012年第3期總第122期)[C];2012年
7 吳林源;李小妹;;組建企業(yè)集團(tuán)可行性研究初探[A];全國經(jīng)濟(jì)管理院校工業(yè)技術(shù)學(xué)研究會第五屆學(xué)術(shù)年會論文集[C];1994年
8 于晶晶;馮靜;陳亭;張一民;何輝;;6分鐘步行試驗(yàn)評價(jià)中老年人心肺功能的可行性研究[A];第九屆全國體育科學(xué)大會論文摘要匯編(2)[C];2011年
9 姬英濤;付強(qiáng);許錦秀;傅蘭英;;新醫(yī)改背景下高等醫(yī)學(xué)院!绑w醫(yī)結(jié)合”人才培養(yǎng)模式的可行性研究[A];第九屆全國體育科學(xué)大會論文摘要匯編(4)[C];2011年
10 馬芳;;運(yùn)動處方教學(xué)在執(zhí)行《學(xué)生體質(zhì)健康標(biāo)準(zhǔn)》過程中的可行性研究[A];第二屆全民健身科學(xué)大會論文摘要集[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 李曄;應(yīng)建立“不可行性研究”機(jī)制[N];中國化工報(bào);2004年
2 黃敏;不可行性研究應(yīng)納入決策過程[N];光明日報(bào);2002年
3 本報(bào)記者 錢敏;投資前來個“不可行性研究”[N];中國化工報(bào);2006年
4 嵇立群;決策應(yīng)重視“不可行性研究”[N];貴陽日報(bào);2009年
5 首都師范大學(xué)教授 嵇立群;決策也應(yīng)重視“不可行性研究”[N];北京日報(bào);2009年
6 郭文;中澳啟動雙邊自由貿(mào)易協(xié)定談判可行性研究[N];國際商報(bào);2004年
7 唐齊千(民建);為“可行性研究”正名[N];聯(lián)合時報(bào);2010年
8 本報(bào)記者 王斌 本報(bào)見習(xí)記者 王開廣;適時開展城管立法可行性研究[N];法制日報(bào);2014年
9 《中國金融家》記者 周宏達(dá);將審議亞太自貿(mào)區(qū)可行性研究[N];金融時報(bào);2014年
10 ;“不可行性研究”值得推廣[N];安徽日報(bào);2004年
相關(guān)博士學(xué)位論文 前1條
1 聶晶;VEGF及受體基因多態(tài)性在體育科研中應(yīng)用的可行性研究[D];北京體育大學(xué);2008年
相關(guān)碩士學(xué)位論文 前10條
1 鐘曜;惠州市HZ溫泉度假區(qū)項(xiàng)目可行性研究[D];華南理工大學(xué);2010年
2 邱月佳;D公司收購XX公司FPC項(xiàng)目的可行性分析[D];云南財(cái)經(jīng)大學(xué);2015年
3 周金陽;H公司年產(chǎn)1.6萬噸聚乙烯塑料管項(xiàng)目可行性研究[D];北京化工大學(xué);2015年
4 高峰;河北世界華文交流項(xiàng)目建設(shè)投資可行性研究報(bào)告[D];華南理工大學(xué);2014年
5 殷立義;閘北區(qū)打造商務(wù)咨詢集團(tuán)的可行性研究[D];電子科技大學(xué);2015年
6 蘇穎冬;我國加入《海牙誘拐兒童公約》的必要性與可行性研究[D];廣東外語外貿(mào)大學(xué);2015年
7 羅冰;四川YC工廠易地技術(shù)改造工程項(xiàng)目可行性研究[D];電子科技大學(xué);2014年
8 楊濤;成都S房地產(chǎn)項(xiàng)目可行性研究[D];西南財(cái)經(jīng)大學(xué);2013年
9 曹曉娟;長株潭城際鐵路湘潭段站場工程項(xiàng)目可行性研究[D];湘潭大學(xué);2014年
10 張亞瓊;空手道項(xiàng)目在我國發(fā)展的現(xiàn)狀與可行性研究[D];北京體育大學(xué);2009年
,本文編號:2324315
本文鏈接:http://sikaile.net/jingjilunwen/gongyejingjilunwen/2324315.html