國(guó)家電網(wǎng)公司四大特高壓直流工程年內(nèi)輸電量超千億千瓦時(shí)
[Abstract]:Recently, it was learned that the four UHV DC projects of the State Grid Company that have been put into operation have preliminarily constructed an energy allocation platform connecting the northwest coal power, wind power base, southwest hydropower base and the eastern and central load center of China. As of December 4, 2014, the cumulative capacity of the four UHVDC projects has reached 1.003 脳 1011 kW / h in the year. Among them, 8. 87 脳 1010 kW / h of clean hydropower is transported to Shanghai, Jiangsu, Zhejiang and other places in east China, and 1.16 脳 1010 kW / h from northwest to central China in the form of "wind and fire bundling", which promotes southwest China. The energy resources in Northwest China have been absorbed throughout the country, reducing coal consumption in the central and eastern regions by 3.4 脳 10 7 t and reducing carbon dioxide emissions by 8. 5%.
【分類號(hào)】:F426.61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張文亮;于永清;李光范;范建斌;宿志一;陸家榆;李博;;特高壓直流技術(shù)研究[J];中國(guó)電機(jī)工程學(xué)報(bào);2007年22期
2 ;±800kV特高壓直流轉(zhuǎn)換開(kāi)關(guān)樣機(jī)順利完成直流大電流分?jǐn)嘣囼?yàn)[J];電力建設(shè);2011年01期
3 李惠軍;郭穎;藍(lán)海波;朱小紅;;±800kV復(fù)奉特高壓直流送端電網(wǎng)安全穩(wěn)定控制系統(tǒng)[J];江蘇科技信息;2011年09期
4 ;哈密—鄭州特高壓直流工程(新疆段)前期工作完成[J];高壓電器;2011年12期
5 ;14項(xiàng)特高壓直流工程建設(shè)成2012年國(guó)網(wǎng)目標(biāo)[J];電器工業(yè);2012年03期
6 ;我國(guó)±800kV特高壓直流項(xiàng)目通過(guò)技術(shù)鑒定[J];農(nóng)村電工;2013年11期
7 張民;石巖;韓偉;;特高壓直流保護(hù)動(dòng)作策略的研究[J];電網(wǎng)技術(shù);2007年10期
8 馬為民;聶定珍;曹燕明;;向家壩—上!800kV特高壓直流工程中的關(guān)鍵技術(shù)方案[J];電網(wǎng)技術(shù);2007年11期
9 黃一鳴;任巍巍;趙s,
本文編號(hào):2247236
本文鏈接:http://sikaile.net/jingjilunwen/gongyejingjilunwen/2247236.html