北京市事業(yè)單位加強(qiáng)多項目全過程管理淺析
發(fā)布時間:2018-06-17 04:31
本文選題:預(yù)算管理制度 + 多項目管理; 參考:《財務(wù)與會計》2017年03期
【摘要】:正隨著預(yù)算管理制度改革的不斷深入,部門預(yù)算管理的內(nèi)外部環(huán)境發(fā)生了深刻變化,對項目管理也提出了進(jìn)一步要求。目前在多項目環(huán)境下,北京市事業(yè)單位項目管理仍存在一些問題,主要體現(xiàn)在:一是現(xiàn)行管理模式難以適應(yīng)多項目同步實施。多項目實施過程中在時間、人力等資源上往往存在爭奪關(guān)系或資源過載等問題,且項目管理人員較少,常常導(dǎo)致多項目并進(jìn)時項目管理部門工作重心落在采購,并非全過程管理,一旦合同簽訂
[Abstract]:With the deepening of the reform of the budget management system, the internal and external environment of the department budget management has undergone profound changes, and further requirements for project management have been put forward. At present, in the multi-project environment, there are still some problems in the project management of Beijing institutions, which are mainly reflected in: first, the current management model is difficult to adapt to the implementation of multi-project synchronization. In the process of multi-project implementation, there are often some problems such as competing relationship or overloading of resources, such as time, manpower, etc, and the project management personnel are few, which often leads to the project management department focusing on procurement when the multi-project is going forward side by side. Not all process management, once the contract is signed
【作者單位】: 北京市環(huán)境保護(hù)監(jiān)測中心財務(wù)科;
【分類號】:D630
【相似文獻(xiàn)】
相關(guān)期刊論文 前9條
1 黃冬梅;推進(jìn)我區(qū)預(yù)算管理制度改革的幾點(diǎn)思考[J];理論研究;2000年06期
2 ;為什么要改進(jìn)預(yù)算管理制度?[J];當(dāng)代貴州;2014年16期
3 ;江西省人民委員會關(guān)于一九六三年預(yù)算管理制度的幾項補(bǔ)充規(guī)定[J];江西政報;1963年03期
4 高培勇;;從“審計風(fēng)暴”看我國預(yù)算管理制度改革[J];學(xué)習(xí)月刊;2005年10期
5 劉光濤;楊振清;;加強(qiáng)軍隊資產(chǎn)預(yù)算管理制度要先行[J];軍事經(jīng)濟(jì)研究;2008年03期
6 ;湖南省人民委T嶧峁賾諞瘓帕陮≌䴓算管理制度的幾,
本文編號:2029703
本文鏈接:http://sikaile.net/guanlilunwen/zhengwuguanli/2029703.html
最近更新
教材專著