珊溪水庫工程建設(shè)概要
發(fā)布時間:2018-07-16 19:37
【摘要】:珊溪水庫規(guī)模系大 (Ⅰ )型 ,大壩高 132 5m ,為國內(nèi)在建鋼筋混凝土面板堆石壩中第二高壩 ,1997年開工以來 ,經(jīng)建設(shè)、設(shè)計、施工、監(jiān)理等有關(guān)方面的努力 ,工程建設(shè)已取得了階段性成果 ,工程質(zhì)量評定暫定優(yōu)良 ,并通過蓄水安全鑒定和蓄水階段驗收 ,2 0 0 0年 5月 12日下閘成功。 6月 12日水庫水位達(dá)到最低發(fā)電水位 98m ,6月 2 8日首臺 (4號 )機(jī)組并網(wǎng)發(fā)電 ,9月 2 8日第 2臺 (3號 )機(jī)組并網(wǎng)發(fā)電。
[Abstract]:The scale of Shanxi reservoir is large (I) type, and the height of the dam is 132 5m. It is the second high dam in the construction of reinforced concrete face rockfill dam in China. Since 1997, the construction, design, construction, supervision and other related efforts have been made. In the water storage stage, the sluice was successful in May 12, 2000. In June 12th, the water level of the reservoir reached the minimum water level 98m, the first (No. 4) unit in June 28th was connected to the grid, and the second units (No. 3) in September 28th were connected to the grid.
【作者單位】: 珊溪水利樞紐工程總指揮部!浙江溫州325304
【分類號】:TV632
本文編號:2127457
[Abstract]:The scale of Shanxi reservoir is large (I) type, and the height of the dam is 132 5m. It is the second high dam in the construction of reinforced concrete face rockfill dam in China. Since 1997, the construction, design, construction, supervision and other related efforts have been made. In the water storage stage, the sluice was successful in May 12, 2000. In June 12th, the water level of the reservoir reached the minimum water level 98m, the first (No. 4) unit in June 28th was connected to the grid, and the second units (No. 3) in September 28th were connected to the grid.
【作者單位】: 珊溪水利樞紐工程總指揮部!浙江溫州325304
【分類號】:TV632
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳新樂;珊溪水庫泄洪洞鋼襯制作[J];水電站機(jī)電技術(shù);1999年02期
2 林澤強(qiáng);珊溪水庫工程建設(shè)概要[J];水力發(fā)電;2000年10期
3 吳垂?jié)?優(yōu)質(zhì)高效建設(shè)珊溪水庫工程[J];水力發(fā)電;2000年10期
4 陳澤鑫;珊溪水庫工程施工管理[J];水力發(fā)電;2000年10期
5 陳振文;珊溪水庫工程樞紐總布置[J];水力發(fā)電;2000年10期
6 徐躍明;珊溪水庫泄洪洞設(shè)計[J];水力發(fā)電;2000年10期
7 應(yīng)寧堅;珊溪水庫面板堆石壩施工及其特點[J];水力發(fā)電;2000年10期
8 李中方;珊溪水庫工程開挖爆破施工[J];水力發(fā)電;2000年10期
9 陳文明,周清水;珊溪混凝土面板堆石壩墊層料生產(chǎn)與填筑[J];水力發(fā)電;2000年10期
10 應(yīng)寧堅,朱麗萍;珊溪水庫面板堆石壩施工渡汛保護(hù)方案淺析[J];水力發(fā)電;2000年10期
,本文編號:2127457
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2127457.html
最近更新
教材專著