IMAX巨幕影院建設項目的質量管理
[Abstract]:Quality management is the key of IMAX cinema construction project. Only if the construction level and quality of the cinema itself meet the construction standards and requirements of IMAX, can the IMAX projection system, sound effect system and screen system be installed accurately. The equipment works properly to bring the audience an unparalleled viewing effect and experience, thereby ensuring IMAX's brand and continuing its market leadership and competitiveness. How to ensure the effective operation of the construction project quality management system is the core of the IMAX cinema construction project quality management, through the establishment and operation of the quality management system to ensure and improve the IMAX cinema construction project quality and management level. Is the purpose of this article and the focus of the discussion. Through the theoretical basis of total quality management, combined with the design and construction requirements of IMAX cinema construction, by comparing the existing national design and quality standard system, the two are compared. Find out that IMAX cinema construction is different from general cinema construction in quality characteristics, and combine with the actual engineering construction process of quality problems to carry out a detailed analysis, grasp the construction process of quality control points, And focus on the quality control point control. At the same time, aiming at the current situation of quality management system and the existing problems in IMAX cinema construction project of Wanda hospital line, this paper analyzes the quality control subsystem from three aspects: ideological guarantee, organization guarantee and quality control. Through causality analysis, this paper analyzes the factors that affect the effective operation of the quality management system in the current quality management system, and seeks corresponding solutions and countermeasures. Thus the quality management system which embodies the characteristics of IMAX cinema construction project management is formed, and various measures to ensure the effective operation of IMAX cinema construction project are formulated at the same time. This paper analyzes the quality status of IMAX cinema construction project, summarizes the quality elements of IMAX cinema construction project which is different from the general cinema construction project, and combines the characteristics of the quality system of the large screen cinema in our country at present. By using causality analysis method in quality management, according to the characteristics of IMAX cinema construction, this paper studies how to set up quality control points in the course of cinema design and construction, and puts forward some specific solutions and quality management strategies. At the same time, using the method of quality management cycle improvement to improve the quality management level in the process of project construction, through the specific IMAX construction project case, elaborated the IMAX cinema construction project operation mechanism and safeguard measures. At the same time, it is hoped that with the help of the research on the quality management in IMAX cinema construction project management, this paper will provide the train of thought to strengthen the quality management for the construction of other domestic cinemas, especially for the large screen cinema construction. In quality management plays a certain reference role.
【學位授予單位】:上海交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TU712.3
【相似文獻】
相關期刊論文 前10條
1 王玉明;宿州市嚴格二期網改質量管理[J];農電管理;2002年12期
2 薛福連;日本質量管理的特點[J];城市質量監(jiān)督;2003年06期
3 張根保;質量管理新進展:數(shù)字化質量管理系統(tǒng)[J];四川兵工學報;2004年03期
4 ;標準化和質量管理是什么關系[J];國防技術基礎;2009年09期
5 盛軍;;淺談質量管理的方法與思路[J];科技資訊;2011年35期
6 徐偉豪;;淺析建筑項目工程的質量管理[J];建筑設計管理;2012年11期
7 余榮昌;;建設工程施工現(xiàn)場質量管理的研究[J];中國新技術新產品;2013年09期
8 魯國鋒;;建設工程項目的質量管理與保證[J];科技創(chuàng)業(yè)家;2013年07期
9 石川馨;周濱;;日本質量管理在國外[J];質量與可靠性;1986年02期
10 晨光;質量管理新說[J];質量與可靠性;1990年05期
相關會議論文 前10條
1 胡憲明;;21世紀企業(yè)質量管理特點分析[A];加入WTO和中國科技與可持續(xù)發(fā)展——挑戰(zhàn)與機遇、責任和對策(上冊)[C];2002年
2 葉茂;;企業(yè)全面質量管理[A];2007海南機械科技論壇論文集[C];2007年
3 林德帥;李志音;;淺看企業(yè)質量管理與經濟效益[A];第四屆十三省區(qū)市機械工程學會科技論壇暨2008海南機械科技論壇論文集[C];2008年
4 張培江;;加強企業(yè)質量管理,促進質量效益持續(xù)提高[A];面向21世紀的科技進步與社會經濟發(fā)展(下冊)[C];1999年
5 林興耀;;21世紀我國企業(yè)質量管理面臨的新挑戰(zhàn)及其對策[A];新世紀 新機遇 新挑戰(zhàn)——知識創(chuàng)新和高新技術產業(yè)發(fā)展(上冊)[C];2001年
6 王建衛(wèi);;施工企業(yè)建立和實施質量管理體系的八忌[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2007)[C];2007年
7 李靜;李錚;梁彥美;;淺談質量管理體系在企業(yè)中的作用[A];土木建筑學術文庫(第9卷)[C];2008年
8 喬亮;耿建偉;;項目施工中的質量管理[A];土木建筑學術文庫(第8卷)[C];2007年
9 李家鑫;盧芳;;質量管理是發(fā)展優(yōu)撫醫(yī)院的基本手段[A];慶祝中國民政康復醫(yī)學會成立十周年醫(yī)院管理改革與發(fā)展研討會論文專集[C];1995年
10 李文鳳;王曉華;;淺談消毒供應室的質量管理[A];2013年河南省醫(yī)院消毒供應中心(室)規(guī)范化建設與管理學術會議論文集[C];2013年
相關重要報紙文章 前10條
1 李倫;未來企業(yè)質量管理[N];中國航空報;2000年
2 通訊員 呂作璐;武漢開發(fā)區(qū)管委會推行ISO9001質量管理體系[N];湖北日報;2007年
3 崔鵬森;山東質量管理顯成效[N];中國郵政報;2004年
4 ;質量管理 任重道遠[N];中國食品質量報;2000年
5 翟編;21世紀的企業(yè)質量管理[N];中國航空報;2001年
6 李京苑;培育品質[N];中國航天報;2000年
7 聞宗;把“質量管理”引入教育[N];中國教育報;2005年
8 四川省獸藥監(jiān)察所 謝青;關注質量管理的組織保障體系[N];中國畜牧獸醫(yī)報;2005年
9 本報記者 甄書秀;用六西格瑪?shù)囊笞鍪虑閇N];中國質量報;2005年
10 張宗清;企業(yè)質量管理重在有序[N];經理日報;2005年
相關博士學位論文 前5條
1 隋麗輝;企業(yè)綠色質量管理體系的構建與過程控制研究[D];哈爾濱工業(yè)大學;2007年
2 于家太;中小學質量管理研究[D];華東師范大學;2005年
3 趙玉忠;我國制造業(yè)質量管理影響要素分析與評價[D];天津大學;2009年
4 楊靜萍;鋼鐵制造業(yè)集成化生產質量管理方法研究[D];大連理工大學;2009年
5 李江蛟;企業(yè)質量管理體系拓展和深化的研究[D];南京理工大學;2007年
相關碩士學位論文 前10條
1 孫偉;SG乳業(yè)公司質量管理的改進研究[D];哈爾濱理工大學;2014年
2 呂玉平;卡特青州(CQL)質量管理與控制體系優(yōu)化研究[D];大連海事大學;2015年
3 高巖松;C公司IRIS質量管理體系重建研究[D];西南交通大學;2015年
4 張春秀;民用飛機項目設計質量管理研究[D];上海交通大學;2015年
5 劉相龍;國道煙上線珠巖大橋改造工程質量管理研究[D];中國海洋大學;2014年
6 趙興軍;壽光市靜山花園建設項目質量管理研究[D];中國海洋大學;2014年
7 于朝陽;房地產項目精細化質量管理體系的構建研究[D];南京郵電大學;2015年
8 王s,
本文編號:2127241
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2127241.html