淺談項(xiàng)目施工進(jìn)度管理
本文選題:工程項(xiàng)目 切入點(diǎn):施工進(jìn)度 出處:《工業(yè)建筑》2011年S1期
【摘要】:工程項(xiàng)目施工的進(jìn)度目標(biāo)能否順利實(shí)現(xiàn),不僅體現(xiàn)了施工單位項(xiàng)目管理水平的高低,同時對工程項(xiàng)目的經(jīng)濟(jì)效益也有非常大的影響。從現(xiàn)場管理的角度,通過分析施工進(jìn)度控制管理在項(xiàng)目管理中的地位和作用、影響工程項(xiàng)目施工進(jìn)度的眾多因素,簡單地闡述了工程項(xiàng)目進(jìn)度控制的原理,提出了工程項(xiàng)目進(jìn)度控制方法,供施工單位參考。
[Abstract]:Whether the progress goal of construction project can be realized smoothly not only reflects the level of project management of the construction unit, but also has a great influence on the economic benefit of the project.From the point of view of site management, through analyzing the position and function of construction schedule control management in project management, and many factors influencing the construction progress of engineering project, this paper simply expounds the principle of project schedule control.The method of project schedule control is put forward for the reference of construction units.
【作者單位】: 五冶集團(tuán)上海有限公司;
【分類號】:TU722
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 劉愛;;淺析工程施工進(jìn)度管理[J];廣西城鎮(zhèn)建設(shè);2009年11期
2 劉睿;張宇清;趙振宇;;建設(shè)項(xiàng)目中的工期延誤影響因素研究[J];建筑經(jīng)濟(jì);2007年S1期
3 朱保建;陳書利;;施工項(xiàng)目進(jìn)度控制[J];山西建筑;2007年33期
4 歐春花;;淺談工程施工進(jìn)度管理[J];山西建筑;2008年08期
5 董俊民;;大型房屋建筑工程施工總進(jìn)度的協(xié)調(diào)與管理[J];民營科技;2010年01期
6 盧立華;丁國棟;;淺談建筑工程的施工管理與進(jìn)度控制[J];四川建材;2010年01期
7 伊安海;倪化秋;;進(jìn)度管理走出窘境的方法[J];施工技術(shù);2008年02期
8 凌玉標(biāo);江埡水利樞紐工程施工進(jìn)度控制和管理[J];中國水利;2000年02期
9 李淵;;淺談住宅工程項(xiàng)目施工進(jìn)度管理[J];中國高新技術(shù)企業(yè);2010年06期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫秋;;工業(yè)建筑施工現(xiàn)場進(jìn)度管理與控制[J];中國城市經(jīng)濟(jì);2011年20期
2 張濤;;工業(yè)建筑的施工管理與進(jìn)度控制[J];科技創(chuàng)新與應(yīng)用;2012年11期
3 農(nóng)光東;;建筑工程項(xiàng)目進(jìn)度管理研究[J];東方企業(yè)文化;2012年10期
4 林芝;;工程款支付和工期延誤法律評析——由一則工程款支付糾紛的案例引發(fā)的思考[J];法制與社會;2012年14期
5 裴勝興;張靜;袁v,
本文編號:1718168
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1718168.html