康巴什電網(wǎng)建設(shè)與改造項目經(jīng)濟(jì)前評價研究
[Abstract]:Grid is a complex system, it is the network channel that sells the power generated by the power to the end-user. The safety and stability of the power grid is closely related to the production and life of the people. It is of great significance to the sustained, healthy and rapid development of the whole society. Due to the complexity, instability and high risk of power grid engineering construction and reconstruction projects, the decision-making of power grid engineering construction and transformation projects can not be separated from the support of pre-economic evaluation of the projects. The establishment and perfection of the pre-evaluation mechanism of power grid construction projects has become an urgent and new subject in the process of deepening the reform of the investment and financing system. On the basis of studying the theory and method of financial evaluation of general construction projects, aiming at the problems existing in the economic evaluation of power grid construction projects in the past, this paper takes Kangbashi power grid construction and transformation project as an example, combining with the actual situation of Kangbashi. On the basis of full investigation, the economic index analysis, break-even analysis, sensitivity analysis and internal economic analysis of the 110kV substation project in Kangbashi Power Grid are carried out to evaluate the economic performance of the project in four parts: economic index analysis, breakeven analysis, sensitivity analysis and internal economic analysis. This paper uses two investment schemes, respectively from the profitability, solvency, operational capacity, efficiency ratio, growth capacity of the five aspects of the project economic indicators analysis; From the break-even point and the safety margin, the paper analyzes the profit and break-even balance of the project, analyzes the sensitivity of the investment amount, the change of electricity sales to the discount rate and the degree of price increase. Finally, the internal economic benefits are analyzed from four aspects: power efficiency, quality benefit, electricity price benefit and strategic planning benefit. Through the scientific analysis and calculation, the objective evaluation conclusion is drawn, which shows the practicability of the research theory adopted in this paper.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 華新;左玉輝;;中國電力行業(yè)可持續(xù)發(fā)展研究[J];環(huán)境科學(xué)與管理;2007年08期
2 張文泉;高玉君;;電力技術(shù)經(jīng)濟(jì)學(xué)的建立與發(fā)展[J];電力技術(shù)經(jīng)濟(jì);2004年03期
3 楊柳;楊靜;劉俊廷;;電網(wǎng)技術(shù)改造項目后評價方法及其指標(biāo)體系[J];能源技術(shù)經(jīng)濟(jì);2010年02期
4 黃保軍,史京楠;電網(wǎng)建設(shè)項目經(jīng)濟(jì)評價方法研究[J];電力建設(shè);2003年02期
5 韓冬;嚴(yán)正;宋依群;孫強(qiáng);張義斌;;基于系統(tǒng)動力學(xué)的智能電網(wǎng)動態(tài)評價方法[J];電力系統(tǒng)自動化;2012年03期
6 黃保軍,李明,朱莉,杜林,辛小利;城網(wǎng)改造經(jīng)濟(jì)評價中的幾個問題[J];電網(wǎng)技術(shù);2000年11期
7 程振峰;;我國企業(yè)核心競爭力財務(wù)評價體系研究[J];中國管理信息化;2008年23期
8 賀靜,韋鋼,張一塵,錢珞江;電網(wǎng)規(guī)劃方案經(jīng)濟(jì)評估方法研究[J];華東電力;2004年07期
9 張熠;王先甲;;基于數(shù)據(jù)包絡(luò)分析和模糊理論的投資項目評價方法研究[J];技術(shù)經(jīng)濟(jì);2010年02期
10 陳曉霞;劉納兵;;經(jīng)濟(jì)評價在電網(wǎng)建設(shè)項目決策中的應(yīng)用[J];江蘇建材;2007年03期
相關(guān)碩士學(xué)位論文 前10條
1 史景堅;城網(wǎng)建設(shè)與改造經(jīng)濟(jì)效益后評價[D];華北電力大學(xué)(北京);2004年
2 陳志莉;電網(wǎng)建設(shè)項目后評價理論及應(yīng)用研究[D];華北電力大學(xué)(北京);2005年
3 潘寧;財務(wù)評價在電力建設(shè)項目中的應(yīng)用與研究[D];對外經(jīng)濟(jì)貿(mào)易大學(xué);2006年
4 李東偉;電網(wǎng)建設(shè)項目后評價理論研究及實(shí)證分析[D];華北電力大學(xué)(北京);2007年
5 李渝;輸電網(wǎng)規(guī)劃方案經(jīng)濟(jì)評價方法的研究[D];華北電力大學(xué)(北京);2007年
6 王佳賢;城市配電網(wǎng)經(jīng)濟(jì)性評估研究[D];上海交通大學(xué);2008年
7 吳建國;承德市區(qū)中低壓配電網(wǎng)規(guī)劃項目經(jīng)濟(jì)評價[D];華北電力大學(xué)(河北);2008年
8 王國威;電網(wǎng)建設(shè)項目可持續(xù)發(fā)展后評價研究[D];華北電力大學(xué)(河北);2008年
9 馬利群;邯鄲地區(qū)城市電網(wǎng)建設(shè)項目經(jīng)濟(jì)評價與分析研究[D];華北電力大學(xué)(河北);2010年
10 金學(xué);密云電網(wǎng)改造項目經(jīng)濟(jì)評價研究[D];南華大學(xué);2012年