供電企業(yè)遠(yuǎn)程自動(dòng)抄表系統(tǒng)建設(shè)與應(yīng)用研究
[Abstract]:The construction of remote automatic meter reading system in power supply enterprises is a complex system engineering, with complex engineering, distinctive characteristics of the industry, and few experiences that can be used for reference. In the process of exploring the construction method of the pilot project, the construction of the pilot project has appeared in a more chaotic situation. The result of the chaos in the construction of the project is that the order of electric power marketing management is destroyed. The basic reason is that the overall planning and construction plan of the pilot project are obviously extensive and lack of systematization and flowability. According to the construction characteristics of remote automatic meter reading system and the business structure of the electric energy sales management system, the basic theory of project management is applied in this paper, which is based on the analysis of the reasons for the problems in the pilot project construction and the characteristics of the project construction of the remote automatic meter reading system. Combined with the basic business knowledge of electric power marketing, according to the principle of integration of power marketing business and engineering construction business, the whole operation process of construction project is systematically planned and designed. Based on the basic theory of project management, the control countermeasures of risk, quality and schedule are worked out. The final formation includes: each stage construction flow chart, the clear post responsibility, the project construction risk control countermeasure, the quality control countermeasure, the project progress control countermeasure, As well as the remote automatic meter reading system construction operation flow system including the contents of ensuring the strict operation of each process. With the increasing construction of remote automatic meter reading system in power supply enterprises, this subject has universal reference significance for the practical application of remote automatic meter reading system in power supply area.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:F426.61;F270.7
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 韓曉平;;智能電網(wǎng)——信息革命和新能源革命的整合[J];電力需求側(cè)管理;2009年02期
2 余貽鑫,王成山,肖俊,嚴(yán)雪飛,葛少云,黃純?nèi)A;城網(wǎng)規(guī)劃計(jì)算機(jī)輔助決策系統(tǒng)[J];電力系統(tǒng)自動(dòng)化;2000年15期
3 林功平;配電網(wǎng)饋線自動(dòng)化技術(shù)及其應(yīng)用[J];電力系統(tǒng)自動(dòng)化;1998年04期
4 楊少平;;智能電表特點(diǎn)及其應(yīng)用[J];福建建設(shè)科技;2008年03期
5 黃全權(quán);;2020年建成統(tǒng)一的“堅(jiān)強(qiáng)智能電網(wǎng)”[J];國(guó)家電網(wǎng);2009年06期
6 曾乃鴻;自動(dòng)抄表技術(shù)在北美的發(fā)展[J];供用電;1996年01期
7 趙曉玲,楊春暉;項(xiàng)目管理的應(yīng)用與發(fā)展[J];化工技術(shù)經(jīng)濟(jì);2002年06期
8 劉錦華;;低壓電力線遠(yuǎn)程載波集中抄表系統(tǒng)的應(yīng)用[J];科技情報(bào)開(kāi)發(fā)與經(jīng)濟(jì);2008年06期
9 侯麗梅;;電能計(jì)量自動(dòng)抄表技術(shù)的現(xiàn)狀與展望[J];科協(xié)論壇(下半月);2007年10期
10 宋榮;周巍;;電能計(jì)量自動(dòng)抄表系統(tǒng)現(xiàn)狀及發(fā)展趨勢(shì)[J];山西科技;2007年04期
相關(guān)碩士學(xué)位論文 前6條
1 黃正超;電力大客戶(hù)負(fù)荷管理研究[D];西安理工大學(xué);2006年
2 文志連;基于低壓電力線載波和GPRS的電能自動(dòng)抄表系統(tǒng)的研究[D];中南大學(xué);2007年
3 趙羽萌;基于數(shù)據(jù)壓縮寬頻載波和GPRS的電能表遠(yuǎn)程集中抄表系統(tǒng)在安徽省電力公司的應(yīng)用[D];合肥工業(yè)大學(xué);2008年
4 黃曉明;黑龍江省電力有限公司電能采集系統(tǒng)的研究與實(shí)現(xiàn)[D];華北電力大學(xué)(北京);2008年
5 侯建峰;J公司工程管理流程優(yōu)化研究[D];蘭州大學(xué);2009年
6 賀志新;項(xiàng)目管理在HCE公司新產(chǎn)品開(kāi)發(fā)過(guò)程中的應(yīng)用[D];天津大學(xué);2009年
,本文編號(hào):2419979
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2419979.html