荒溝抽水蓄能電站建設(shè)項目經(jīng)濟評價研究
[Abstract]:The construction of Kuangou pumped storage power station not only effectively alleviates the difficulty of peak regulation in Heilongjiang power grid, improves the economic and safe operation ability of power grid, but also plays an important role in optimizing the power supply structure and saving energy and emission reduction in Heilongjiang Province. In this paper, the economic feasibility of the construction project of the barren ditch pumped storage power station is studied from the aspects of financial evaluation, national economic evaluation and comprehensive economic evaluation, which provides an important basis for the smooth implementation of the construction project. First of all, the paper introduces the general situation of the construction project of Kuangou Pumped-Storage Power Station, and analyzes the market environment of the project. Secondly, on the basis of collecting and estimating the various financial data of the project, by calculating the investment recovery period, the internal financial return rate, the financial net present value and other key indicators of the construction project, In this paper, the profitability and solvency of the project are analyzed and studied in depth, and on this basis, the financial feasibility of the project is obtained by using break-even analysis and sensitivity analysis to evaluate the project's ability to resist risks. Thirdly, through the in-depth analysis of the national economic costs and benefits of the project, the economic feasibility and social benefits of the project are studied and evaluated from the point of view of the national economy. Finally, select a number of key economic evaluation indicators, through the establishment of a comprehensive economic evaluation index system model, the use of fuzzy analytic hierarchy process to carry out comprehensive, systematic, scientific research and evaluation of the construction project economy. It is concluded that the construction project is economically feasible. The research results of this paper provide a more objective and scientific basis for the investment decision of the project and ensure the smooth implementation of the project.
【學(xué)位授予單位】:哈爾濱工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F426.61;TV743
【參考文獻】
相關(guān)期刊論文 前10條
1 陳同法;張暉;趙桂元;;關(guān)于抽水蓄能項目經(jīng)濟評價機制的思考[J];水力發(fā)電;2013年01期
2 李文廣;;抽水蓄能電站靜態(tài)效益分析[J];安徽農(nóng)學(xué)通報(上半月刊);2012年15期
3 謝傳勝;賈曉希;陳英杰;韓錦瑞;;基于PCA改進雷達圖的抽水蓄能電站效益綜合評價[J];水電能源科學(xué);2012年03期
4 馮雁敏;陳守峰;張雪源;;某混合式抽水蓄能電站綜合效益研究[J];水電能源科學(xué);2012年02期
5 王偉;王高紅;周翔;董博;;抽水蓄能電站服務(wù)電網(wǎng)評價指標(biāo)體系及方法[J];電網(wǎng)與清潔能源;2010年08期
6 李天華;黃健元;;抽水蓄能電站建設(shè)對經(jīng)濟拉動效應(yīng)的實證研究[J];華北水利水電學(xué)院學(xué)報;2009年06期
7 劉巖;;蒙西電網(wǎng)建設(shè)抽水蓄能電站的經(jīng)濟性分析[J];內(nèi)蒙古電力技術(shù);2009年03期
8 高蘇杰;婁素華;;抽水蓄能電站綜合效益評估綜述[J];水電自動化與大壩監(jiān)測;2008年01期
9 王耀華;梁芙翠;白建華;;抽水蓄能電站在電力系統(tǒng)中的效益評價探析[J];電力技術(shù)經(jīng)濟;2007年01期
10 郭玉泉;劉文毅;;大型蓄能電站綜合效益評價研究[J];華東電力;2006年12期
相關(guān)博士學(xué)位論文 前1條
1 孫薇;市場條件下抽水蓄能電站效益綜合評價及運營模式研究[D];華北電力大學(xué)(河北);2007年
相關(guān)碩士學(xué)位論文 前10條
1 王學(xué)良;分布式抽水蓄能系統(tǒng)的效益評估與運營策略[D];哈爾濱工業(yè)大學(xué);2011年
2 高尚;呼市抽水蓄能電站項目財務(wù)和經(jīng)濟效益評價[D];華北電力大學(xué);2011年
3 童靈華;抽水蓄能電站效益分析與運行優(yōu)化[D];浙江大學(xué);2010年
4 顧曉亮;抽水蓄能電站效益綜合評價研究[D];合肥工業(yè)大學(xué);2010年
5 孫潔;抽水蓄能電站建設(shè)項目風(fēng)險管理研究[D];華北電力大學(xué)(河北);2009年
6 周永麗;基于層次分析法的上市企業(yè)價值評估研究[D];大連理工大學(xué);2008年
7 胡裕杰;基于層次分析法的企業(yè)盈利能力模糊綜合評價體系研究[D];廣東外語外貿(mào)大學(xué);2008年
8 柳詠梅;泰安抽水蓄能電站項目經(jīng)濟效益評價研究[D];華北電力大學(xué)(河北);2008年
9 劉凡;抽水蓄能電站動態(tài)效益評估方法研究[D];華中科技大學(xué);2008年
10 袁廣;基于模糊數(shù)學(xué)的財務(wù)分析指標(biāo)體系設(shè)計[D];中南大學(xué);2006年
,本文編號:2326187
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2326187.html