工作研究在蛇形管制造作業(yè)優(yōu)化中的應(yīng)用研究
[Abstract]:China's power plant equipment manufacturing enterprises have benefited from the good macro situation at home and abroad, and the "blowout" market has emerged in the industry. However, at present, most power plant equipment manufacturing enterprises are still traditional state-owned enterprises. The company's manufacturing is more labor-intensive extensive manufacturing, mostly by the first-line staff through "experience" accumulation of production and manufacturing. Since entering the 21st century, with the continuous development of enterprises, customers are demanding more and more high product delivery time and product quality. Domestic power plant equipment manufacturers hope to adopt scientific management methods and effective management tools. Optimize the manufacturing process to promote the sustainable and healthy development of the enterprise. This paper is based on the production and manufacturing practice of SBWL Company, the leading enterprise of domestic power plant equipment, and based on the present situation of the production line of serpentine pipe workshop, the program diagram is used. The method of circuit diagram analyzes the problems of too many unproductive handling processes, very many in-process products and long production cycle in the production line of snake-shaped tube manufacturing, and applies the method of working research. The production layout and manufacturing process were improved. By means of operation research and action study, the mechanical butt welding of straight pipe, pipe bending operation and assembly accessory welding in the key process of serpentine tube manufacturing are analyzed, and the man-machine diagram, dynamic element analysis diagram and redivision of operation unit are used. The main working procedures of the production line are improved, the man-machine utilization ratio is improved, the operation method is standardized, the in-process inventory is greatly compressed, and the standard man-hour is approved by the method of job measurement. To meet the internal needs of enterprise manufacturing capability upgrading and external needs of new customer evaluation standards to enhance manufacturing capabilities.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TB497;F273;F426.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫建華,高廣章,蔣志強(qiáng);生產(chǎn)線平衡的手段與方法研究[J];成組技術(shù)與生產(chǎn)現(xiàn)代化;2004年04期
2 韓偉;;火電設(shè)備制造業(yè)三十年:支撐更高效清潔的電力發(fā)展[J];電力設(shè)備;2008年08期
3 陳忠保;;上海電站設(shè)備制造業(yè)的可持續(xù)發(fā)展[J];電站輔機(jī);2007年03期
4 劉廣;運(yùn)用流程程序分析法優(yōu)化攤鋪機(jī)裝配流程[J];工程機(jī)械;2005年06期
5 齊二石;劉洪偉;;我國(guó)工業(yè)工程本土化研究與應(yīng)用實(shí)踐分析[J];管理學(xué)報(bào);2010年11期
6 高昆;汪浩;;1997~2009年中國(guó)電力設(shè)備市場(chǎng)運(yùn)行研究[J];電器工業(yè);2010年10期
7 馬桂山;鄧偉;;發(fā)電設(shè)備產(chǎn)品結(jié)構(gòu)調(diào)整和企業(yè)轉(zhuǎn)型升級(jí)的一些思考[J];電器工業(yè);2012年05期
8 趙濤,齊二石;工業(yè)工程發(fā)展歷程與趨勢(shì)淺析[J];機(jī)械設(shè)計(jì);1997年09期
9 藺宇;齊二石;史英杰;;中國(guó)工業(yè)工程發(fā)展及其在制造業(yè)的應(yīng)用研究[J];科學(xué)學(xué)與科學(xué)技術(shù)管理;2007年04期
10 李小兵;吉衛(wèi)喜;賈繼勇;;基于秒表法的工時(shí)定額測(cè)算過程研究與實(shí)現(xiàn)[J];計(jì)算機(jī)應(yīng)用與軟件;2013年04期
本文編號(hào):2294586
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2294586.html