寧東地區(qū)風(fēng)電接納能力分析及應(yīng)用研究
[Abstract]:With the introduction of the 12th Five-Year Plan of Wind Power Development in China in 2012, the future wind power development target has been defined. By 2015, the connected grid installed capacity will reach 100 million kilowatts, and by 2020, the installed capacity will reach 200 million. From the content of the plan we can clearly see the country's attention to the development of wind energy industry. At the same time, in 2012, with the rapid growth of wind power installation in China, the phenomenon of abandoned wind and limited power in local power grids is serious. According to statistics, the total amount of abandoned wind power in the whole country is about 20 billion kilowatt-hours, many wind power-related enterprises have suffered losses or profits have decreased substantially. Has caused the national electric power profession to the wind power development high attention. In renewable energy, wind power is the most mature technology, the most large-scale development conditions and commercial operation and maintenance of new energy. Especially in the situation of reducing greenhouse gases and dealing with global warming, the world pays close attention to it. During the 11th Five-Year Plan period, wind power in China has been developed rapidly, the installed capacity has been continuously increased, and large-scale wind power grid has been realized in local areas. However, with the rapid growth of wind power installed capacity, it is difficult to adjust peak frequency and frequency in local areas or power grids. The decrease in the number of hours of wind power utilization and the frequent occurrence of wind power abandonment and power limit lead to the wind power acceptance ability becoming an important factor restricting the sustainable and healthy development of wind power. Starting with the calculation of wind power acceptance capacity in Ningdong area, this paper analyzes the factors that affect the wind power acceptability, such as the current situation of wind power resources, the characteristics of wind power generation, the power supply structure, the peak shaving situation, etc. On the basis of fully considering the influence of wind power characteristics on peak shaving, the wind power acceptance capacity in Ningdong area is calculated. At the same time, using the cost-benefit analysis tool, the paper analyzes the cost and benefit of wind power acceptance in Ningdong area, and gives the calculation conclusion: in 2017, when the marginal benefit of Ningfeng power admission is equal to the marginal cost, The wind power resources in Ningdong area are utilized to the maximum extent, otherwise the wind power investment is wasted. This paper provides technical support for the sustainable development of wind power generation in Ningdong area, has guiding significance for the grid construction in Ningdong area, and gives a risk hint for the disorderly development of wind power resources in power generation enterprises.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:F426.61;TM614
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李崢;;風(fēng)力發(fā)電的歷史、現(xiàn)狀和未來(lái)展望[J];東方企業(yè)文化;2011年08期
2 郭永智;梁曉萍;劉小軍;;簡(jiǎn)析提升電網(wǎng)安全運(yùn)行水平的工作方法[J];電力學(xué)報(bào);2007年04期
3 周原冰;王乾坤;方彤;;歐洲風(fēng)電并網(wǎng)研究項(xiàng)目概述[J];能源技術(shù)經(jīng)濟(jì);2010年08期
4 雷亞洲;與風(fēng)電并網(wǎng)相關(guān)的研究課題[J];電力系統(tǒng)自動(dòng)化;2003年08期
5 張國(guó)強(qiáng);張伯明;;考慮風(fēng)電接入后二次備用需求的優(yōu)化潮流算法[J];電力系統(tǒng)自動(dòng)化;2009年08期
6 王芝茗;蘇安龍;魯順;;基于電力平衡的遼寧電網(wǎng)接納風(fēng)電能力分析[J];電力系統(tǒng)自動(dòng)化;2010年03期
7 尹明;王成山;葛旭波;;風(fēng)電并網(wǎng)經(jīng)濟(jì)技術(shù)評(píng)價(jià)研究綜述[J];電力系統(tǒng)及其自動(dòng)化學(xué)報(bào);2010年05期
8 于貴勇;;美國(guó)與中國(guó)領(lǐng)跑全球風(fēng)電產(chǎn)業(yè)[J];電器工業(yè);2009年09期
9 曾鳴;呂春泉;邱柳青;田廓;;風(fēng)電并網(wǎng)時(shí)基于需求側(cè)響應(yīng)的輸電規(guī)劃模型[J];電網(wǎng)技術(shù);2011年04期
10 田豐;;歐洲風(fēng)電發(fā)展及對(duì)我國(guó)的啟示[J];電源技術(shù)應(yīng)用;2010年04期
,本文編號(hào):2248084
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2248084.html