輸電工程供應(yīng)鏈風(fēng)險評價研究

發(fā)布時間:2018-08-16 09:00
【摘要】:隨著經(jīng)濟全球化的進(jìn)程和發(fā)展,供應(yīng)鏈管理已經(jīng)開始被越來越多的企業(yè)重視,并得到越來越廣泛的應(yīng)用。輸電工程是我國電網(wǎng)工程建設(shè)的重要組成部分。輸電工程成本主要由本體工程費用和其他費用組成。由于輸電工程的特殊性,設(shè)備材料的費用占本體工程費用一半以上,在有些特高壓輸電工程中,設(shè)備材料費用所占的比例甚至高達(dá)70%。建設(shè)材料成本占比的巨大,加之輸電工程具有沿途線路長、施工環(huán)境險惡、工期要求緊等特點,導(dǎo)致了輸電工程供應(yīng)鏈的特殊性,以及潛在的風(fēng)險因素的不確定性。 本文研究了工程供應(yīng)鏈風(fēng)險管理的基本理論,回顧了工程供應(yīng)鏈及供應(yīng)鏈風(fēng)險研究的現(xiàn)狀,系統(tǒng)研究了輸電工程供應(yīng)鏈風(fēng)險的來源。通過頭腦風(fēng)暴法和德爾菲調(diào)查法,對輸電工程供應(yīng)鏈風(fēng)險因素進(jìn)行了識別,建立了輸電工程供應(yīng)鏈風(fēng)險指標(biāo)體系,運用層次分析法對供應(yīng)鏈風(fēng)險指標(biāo)權(quán)重進(jìn)行計算,構(gòu)建了輸電工程供應(yīng)鏈風(fēng)險評價模型。本文提出了輸電工程供應(yīng)鏈的風(fēng)險因素由內(nèi)生風(fēng)險和外生風(fēng)險兩個維度構(gòu)成,內(nèi)生風(fēng)險由信息風(fēng)險、生產(chǎn)風(fēng)險和物流風(fēng)險組成,而外生風(fēng)險包括自然環(huán)境、社會文化、政策制度、意外事故和政治經(jīng)濟五個方面。最后,本文采用綜合評價法對新疆與西北主網(wǎng)聯(lián)網(wǎng)750千伏第二通道輸電工程的供應(yīng)鏈風(fēng)險進(jìn)行了綜合評價和實證研究,并根據(jù)風(fēng)險評價結(jié)果提出相應(yīng)的風(fēng)險管理措施和對策,為輸電工程施工企業(yè)控制輸電工程項目的供應(yīng)鏈風(fēng)險,順利完成工程項目具有一定的理論和實際意義。
[Abstract]:With the process and development of economic globalization, supply chain management (SCM) has been paid more and more attention by enterprises and applied more and more widely. Transmission engineering is an important part of power grid construction in China. The cost of transmission project is mainly composed of self-engineering cost and other cost. Because of the particularity of transmission project, the cost of equipment material accounts for more than half of the cost of bulk project. In some UHV transmission projects, the proportion of equipment material cost is even as high as 70%. The huge cost of construction materials and the characteristics of transmission project with long route, dangerous construction environment and tight time limit lead to the particularity of supply chain and the uncertainty of potential risk factors. This paper studies the basic theory of engineering supply chain risk management, reviews the present situation of engineering supply chain and supply chain risk research, and systematically studies the source of transmission engineering supply chain risk. Through brainstorming method and Delphi investigation method, the risk factors of supply chain of transmission engineering are identified, and the index system of supply chain risk of transmission engineering is established, and the weight of supply chain risk index is calculated by AHP. The supply chain risk assessment model of transmission engineering is constructed. This paper puts forward that the risk factors of supply chain of transmission engineering consist of two dimensions: endogenous risk and exogenous risk. The endogenous risk consists of information risk, production risk and logistics risk, while exogenous risk includes natural environment, social culture. Policy system, accident and political economy five aspects. Finally, this paper makes a comprehensive evaluation and empirical study on the supply chain risk of the second transmission project of 750 kV in Xinjiang and Northwest main Network, and puts forward corresponding risk management measures and countermeasures according to the results of risk evaluation. It is of theoretical and practical significance to control the supply chain risk of transmission project in power transmission engineering construction enterprises and to complete the project successfully.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F274;F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 王勇;姜意揚;鄧哲鋒;;不確定環(huán)境下的物流服務(wù)供應(yīng)鏈風(fēng)險分析[J];商業(yè)研究;2011年07期

2 薛正亮,陳繼祥,朱近;電力供應(yīng)鏈上電網(wǎng)公司的定位[J];上海電力學(xué)院學(xué)報;2002年03期

3 周艷菊;邱莞華;王宗潤;;供應(yīng)鏈風(fēng)險管理研究進(jìn)展的綜述與分析[J];系統(tǒng)工程;2006年03期

4 韓東東,施國洪,馬漢武;供應(yīng)鏈管理中的風(fēng)險防范[J];工業(yè)工程;2002年03期

5 ;重大工程項目風(fēng)險管理中的綜合集成方法[J];管理科學(xué)文摘;1997年05期

6 陳志祥,馬士華,陳榮秋,王一凡;供應(yīng)鏈管理與基于活動的成本控制策略[J];工業(yè)工程與管理;1999年05期

7 陸震,白勤虎;供應(yīng)鏈戰(zhàn)略合作伙伴關(guān)系分析與研究[J];合肥工業(yè)大學(xué)學(xué)報(社會科學(xué)版);2004年02期

8 晚春東;王雅林;齊二石;;供應(yīng)鏈系統(tǒng)風(fēng)險識別與評估研究綜述[J];哈爾濱工業(yè)大學(xué)學(xué)報(社會科學(xué)版);2007年06期

9 于艷飛;王效俐;;制造商與供應(yīng)商合作伙伴關(guān)系的博弈分析[J];經(jīng)濟論壇;2006年13期

10 王沖;夏遠(yuǎn)強;張昌生;;供應(yīng)鏈管理相關(guān)理論研究綜述[J];價值工程;2006年03期

相關(guān)碩士學(xué)位論文 前3條

1 楊俊;供應(yīng)鏈風(fēng)險管理理論與方法研究[D];武漢理工大學(xué);2005年

2 郭榮興;中國電力產(chǎn)業(yè)供求狀況與發(fā)展戰(zhàn)略分析[D];山東大學(xué);2006年

3 鄒陽春;基于信息共享的供應(yīng)鏈協(xié)調(diào)問題研究[D];華中科技大學(xué);2006年



本文編號:2185519

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2185519.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c9507***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com