N公司裝配生產(chǎn)線布局研究
[Abstract]:Equipment investment in the communications industry is very high and depreciation of equipment is generally the largest item in the cost structure of the product. For the mobile phone manufacturing plant, the comprehensive efficiency of equipment is an important index to measure the level of production management and cost competitiveness. The purpose of the research is to improve the utilization rate of capital, and finally to reduce the cost of products. Based on the lean production theory, this paper synthetically applies the relevant theories and methods of lean production and industrial engineering, through the combination of quantitative analysis and qualitative analysis, systematic and comprehensive analysis, The purpose of this paper is to improve the production efficiency and reduce the cost of the plant layout improvement project of N Company China. This paper systematically discusses the continuous improvement of the factory layout and the analysis and optimization of the production line layout, logistics, production process, production capacity balance, etc., which eliminates a large amount of wasteful and ineffective operations without creating value. Reducing WIP, shortening manufacturing cycle, basically realizing the production mode of single piece flow, using Kanban mode of production, changing from propulsive production side to pull-type production mode, so as to improve production efficiency in an all-round way. Thus reducing the cost to enhance the competitiveness of the product market. Combining the concept of lean production with the principle of world grade manufacturing factory creatively, applying the balance theory and value flow method to analyze the current layout, logistics and production process of the factory. The bottleneck affecting the production efficiency of the factory is excavated, and the corresponding production line layout countermeasures are put forward. Through the implementation of the corresponding countermeasures, to achieve efficiency, cost reduction and set improvement goals.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F273;F426.6
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 田青,周剛,齊二石;豐田生產(chǎn)方式的物流系統(tǒng)研究[J];工業(yè)工程;2000年04期
2 李銀滿,劉滿洲;信息環(huán)境下工業(yè)工程的改善技術(shù)[J];工業(yè)工程;2003年01期
3 李薦名,李璐;工業(yè)工程中的成本技術(shù)[J];工業(yè)工程;2003年03期
4 郭伏,李森;作業(yè)測(cè)定技術(shù)應(yīng)用中的問(wèn)題研究[J];工業(yè)工程;2003年03期
5 馬亞男,孫林巖,汪應(yīng)洛;中小制造企業(yè)發(fā)展先進(jìn)制造技術(shù)現(xiàn)狀及對(duì)策研究[J];工業(yè)工程;2003年04期
6 劉子先,劉旭,李從東;我國(guó)制造企業(yè)成本管理存在問(wèn)題及解決問(wèn)題策略的研究[J];工業(yè)工程;2003年05期
7 郭紅偉,錢省三;IE在CELL生產(chǎn)方式中的應(yīng)用[J];工業(yè)工程;2003年05期
8 戚曉曜;及時(shí)生產(chǎn)制(JIT)應(yīng)用的探討[J];工業(yè)工程;2004年01期
9 齊二石,李中陽(yáng),安景玲;間歇移動(dòng)流水生產(chǎn)線分析與組織設(shè)計(jì)[J];工業(yè)工程;2004年02期
10 張畢西,周艷,劉鑫;離散生產(chǎn)系統(tǒng)車間設(shè)施布置優(yōu)化[J];工業(yè)工程;2004年02期
本文編號(hào):2128332
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2128332.html