天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

海勃灣發(fā)電廠三期工程后評(píng)價(jià)研究

發(fā)布時(shí)間:2018-05-10 10:10

  本文選題:海勃灣發(fā)電廠三期工程 + 后評(píng)價(jià)。 參考:《華北電力大學(xué)》2013年碩士論文


【摘要】:針對(duì)海勃灣發(fā)電廠三期工程,本文首先分析了項(xiàng)目后評(píng)價(jià)理論和后評(píng)價(jià)方法,然后重點(diǎn)闡述了海勃灣發(fā)電廠三期工程建成后的一些基本指標(biāo)和數(shù)據(jù),最后很據(jù)項(xiàng)目后評(píng)價(jià)理論和發(fā)電廠的基本特點(diǎn),構(gòu)建了該項(xiàng)目后評(píng)價(jià)指標(biāo)體系,并利用序關(guān)系分析法對(duì)后評(píng)價(jià)指標(biāo)賦權(quán),利用模糊綜合評(píng)價(jià)法對(duì)該項(xiàng)目進(jìn)行了后評(píng)價(jià)。本文的研究工作主要體現(xiàn)在以下幾個(gè)方面:介紹了后評(píng)價(jià)的基本理論,和海勃灣發(fā)電廠三期工程項(xiàng)目的基本情況以及建設(shè)的必要性以及建設(shè)的內(nèi)容;分別從項(xiàng)目實(shí)施的準(zhǔn)備過(guò)程、項(xiàng)目的技術(shù)水平、項(xiàng)目的財(cái)務(wù)收益、項(xiàng)目的環(huán)境效益、項(xiàng)目的社會(huì)效益、項(xiàng)目的可持續(xù)能力全面分析了項(xiàng)目運(yùn)營(yíng)前后的基本情況;為選擇一種合適的后評(píng)價(jià)方法,分別介紹了模糊綜合評(píng)價(jià)法、D-S證據(jù)評(píng)價(jià)法、模糊積分評(píng)價(jià)法和一些其它評(píng)價(jià)法,并對(duì)這些評(píng)價(jià)方法進(jìn)行了比較分析,最終選擇模糊綜合評(píng)價(jià)法對(duì)本項(xiàng)目進(jìn)行后評(píng)價(jià)。根據(jù)后評(píng)價(jià)指標(biāo)體系的選取原則及海勃灣發(fā)電廠三期工程建設(shè)的基本情況,構(gòu)建了本項(xiàng)目的后評(píng)價(jià)指標(biāo)體系,該指標(biāo)體系主要包括項(xiàng)目的實(shí)施準(zhǔn)備工作、項(xiàng)目的技術(shù)水平、項(xiàng)目的財(cái)務(wù)效益、項(xiàng)目的影響和可持續(xù)發(fā)展能力該指標(biāo)體系等五個(gè)方面。在該項(xiàng)目評(píng)價(jià)過(guò)程中利用序關(guān)系分析法確定指標(biāo)的權(quán)重,并給出了詳細(xì)計(jì)算步驟;利用模糊綜合評(píng)價(jià)理論對(duì)本項(xiàng)目進(jìn)行模糊綜合評(píng)判,,并給出了后評(píng)價(jià)結(jié)論。最后給出論文的研究結(jié)論和進(jìn)一步改進(jìn)建議。
[Abstract]:In view of the three phase of the Haibowan power plant, this paper first analyzes the post evaluation theory and the post evaluation method, and then focuses on some basic indexes and data after the completion of the three phase of the project. Finally, according to the post evaluation theory and the basic characteristics of the power plant, the post evaluation index system of the project is constructed and used for the project. In this paper, the basic theory of post evaluation, the basic situation of the three phase of the Haibowan power plant, the necessity of the construction and the content of the construction, are mainly embodied in the following aspects. Not from the preparation process, the technical level of the project, the financial benefit of the project, the environmental benefits of the project, the social benefit of the project, the sustainable ability of the project, the basic situation of the project before and after the project is analyzed, and the fuzzy comprehensive evaluation method, the D-S evidence evaluation method, and the fuzzy evaluation method are introduced to select a suitable post evaluation method. The integral evaluation method and some other evaluation methods have been compared and analyzed. Finally, the fuzzy comprehensive evaluation method is selected for the post evaluation of the project. According to the selection principle of the index system of the post evaluation and the basic situation of the construction of the three phase of the Haibowan power plant, the post evaluation index system of the project is constructed, and the index body is constructed. The Department mainly includes the preparation of the project, the technical level of the project, the financial benefit of the project, the impact of the project and the index system of the sustainable development ability. In the evaluation process of the project, the weight of the index is determined by the order relation analysis method, and the detailed calculation steps are given, and the fuzzy comprehensive evaluation theory is used in the five aspects. The fuzzy comprehensive evaluation of the project is carried out, and the conclusion of the post evaluation is given. Finally, the research conclusions and suggestions for further improvement are given.

【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李晟;蔣維;胡國(guó)良;;基于ANP的模糊多層次分析法的風(fēng)電項(xiàng)目后評(píng)價(jià)研究[J];安徽電力;2009年04期

2 韓富春;任婷婷;陳晶晶;;基于層次分析法的輸變電工程項(xiàng)目后評(píng)價(jià)研究[J];電氣技術(shù);2009年02期

3 常鮮戎,邢金峰,張潔;基于多級(jí)模糊綜合評(píng)價(jià)法的電網(wǎng)調(diào)度員培訓(xùn)評(píng)估[J];電網(wǎng)技術(shù);2005年17期

4 韋鋼;楊毅;王建;周冰;;基于綜合評(píng)價(jià)方法的輸變電工程技術(shù)后評(píng)價(jià)[J];電網(wǎng)技術(shù);2010年03期

5 張殿科,賀明軍;500kV輸變電工程項(xiàng)目綜合后評(píng)價(jià)研究[J];山西電力;2005年05期

6 楊永紅;李獻(xiàn)東;;風(fēng)電項(xiàng)目后評(píng)價(jià)理論方法探討[J];華北電力大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2008年03期

7 蔣黎明;何加浪;張宏;;D-S證據(jù)理論中一種新的沖突證據(jù)融合方法[J];計(jì)算機(jī)科學(xué);2011年04期

8 李振宇;江偉;;輸變電項(xiàng)目后評(píng)價(jià)指標(biāo)體系構(gòu)建[J];科技信息;2009年15期

9 呂顯智;馬建云;陶昆;馬峰;陳碩;;基于模糊綜合評(píng)價(jià)法的高層賓館消防安全現(xiàn)狀評(píng)價(jià)[J];中國(guó)安全生產(chǎn)科學(xué)技術(shù);2011年05期

10 何沙;吉安民;陳東升;;模糊綜合評(píng)價(jià)在鉆井隊(duì)安全管理評(píng)價(jià)中的應(yīng)用[J];中國(guó)安全生產(chǎn)科學(xué)技術(shù);2011年06期

相關(guān)碩士學(xué)位論文 前10條

1 袁翰青;深州220KV輸變電項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué);2011年

2 巴音虎;龍?jiān)达L(fēng)電工程項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué);2011年

3 劉燁;石家莊市北輸變電工程項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué);2011年

4 馮茂森;電力建設(shè)項(xiàng)目后評(píng)價(jià)研究[D];天津大學(xué);2010年

5 賀明軍;運(yùn)城500千伏輸變電工程項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2005年

6 程宏偉;輸變電工程項(xiàng)目后評(píng)價(jià)方法探索[D];鄭州大學(xué);2005年

7 辛益;高壓輸變電工程環(huán)境影響后評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2007年

8 齊金定;淶源220KV輸變電項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué)(河北);2008年

9 張建明;輸變電工程項(xiàng)目經(jīng)濟(jì)效益后評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2008年

10 劉嵐;風(fēng)電工程項(xiàng)目后評(píng)價(jià)指標(biāo)體系與評(píng)價(jià)方法研究[D];華北電力大學(xué)(北京);2008年



本文編號(hào):1868891

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1868891.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶ce2b5***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com