臨運500kV線路工程經(jīng)濟(jì)效益及可持續(xù)性后評價研究
本文選題:經(jīng)濟(jì)效益 + 可持續(xù)性。 參考:《華北電力大學(xué)》2013年碩士論文
【摘要】:輸變電工程經(jīng)濟(jì)效益及可持續(xù)性后評價研究工作,具有重要的學(xué)術(shù)價值和實際意義。本文闡述了輸變電工程經(jīng)濟(jì)效益及可持續(xù)性后評價的背景和意義,介紹了項目后評價國內(nèi)外的研究動態(tài),并進(jìn)行經(jīng)濟(jì)效益及可持續(xù)性后評價理論研究。結(jié)合國家、電力行業(yè)項目后評價的相關(guān)規(guī)定以及輸變電工程投資特點,基于充分的調(diào)研工作,深入分析臨運500kV線路工程的經(jīng)濟(jì)效益及可持續(xù)性,并運用相關(guān)數(shù)學(xué)模型手段,對臨運500kV線路工程進(jìn)行了后評價實證研究。 在臨運500kV線路工程經(jīng)濟(jì)效益后評價研究中,本文首先結(jié)合工程實際情況和特點,構(gòu)建能夠反映臨運500kV線路工程經(jīng)濟(jì)效益的后評價指標(biāo)體系;然后采用熵權(quán)模糊評價模型,運用AHP法與熵權(quán)法結(jié)合確定指標(biāo)權(quán)重,采用模糊評價法確定隸屬度,對臨運500kV線路工程進(jìn)行實證研究;最后得到評價結(jié)論并提出針對性的建議措施。 在臨運500kV線路工程可持續(xù)性后評價研究中,本文首先結(jié)合工程實際情況和特點,構(gòu)建能夠反映臨運500kV線路工程可持續(xù)性的后評價指標(biāo)體系;然后確定評語集和評價標(biāo)準(zhǔn),對評價指標(biāo)進(jìn)行數(shù)據(jù)處理;最后采用BP神經(jīng)網(wǎng)絡(luò)評價模型,通過運用Matlab軟件對臨運500kV線路工程進(jìn)行基于BP神經(jīng)網(wǎng)絡(luò)的可持續(xù)性后評價實證研究,得到評價結(jié)論并提出針對性的建議措施。 本文采用了定性和定量相結(jié)合的評價方法,系統(tǒng)全面地評價了臨運500kV線路工程的經(jīng)濟(jì)效益及可持續(xù)性,對電網(wǎng)企業(yè)的輸變電工程建設(shè)起到了一定的積極作用,具有一定的現(xiàn)實意義。
[Abstract]:The research on economic benefit and sustainability of transmission and transformation project is of great academic value and practical significance. This paper expounds the background and significance of economic benefit and sustainability post evaluation of transmission and transformation engineering, introduces the research trends of project post evaluation at home and abroad, and studies the theory of economic benefit and sustainability post evaluation. Combined with the relevant regulations of post-evaluation of national and electric power industry projects and the investment characteristics of transmission and transformation projects, based on the full investigation work, the economic benefits and sustainability of 500kV line engineering are analyzed in depth, and the relevant mathematical models are used. An empirical study on post-evaluation of 500kV line engineering is carried out. In the study of post-evaluation of economic benefits of 500kV line engineering, this paper firstly constructs a post-evaluation index system which can reflect the economic benefits of 500kV line engineering, and then adopts entropy weight fuzzy evaluation model. AHP method and entropy weight method are used to determine the index weight and fuzzy evaluation method is used to determine the membership degree. Finally, the evaluation conclusions are obtained and the corresponding suggestions are put forward. In the research of post-evaluation of sustainability of 500kV line engineering, this paper firstly constructs a post-evaluation index system which can reflect the sustainability of 500kV line project, and then determines the evaluation set and evaluation criteria, according to the actual situation and characteristics of the project, and then establishes a post-evaluation index system that can reflect the sustainability of the project, and then determines the evaluation set and evaluation criteria. Finally, using BP neural network evaluation model and using Matlab software to carry out the sustainable post-evaluation research based on BP neural network. Get the evaluation conclusion and put forward the targeted measures. In this paper, the qualitative and quantitative evaluation method is used to evaluate the economic benefit and sustainability of the 500kV line project systematically and comprehensively, which plays a positive role in the transmission and transformation project construction of the power grid enterprise. Has certain realistic significance.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F426.61;TM726.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 華新;左玉輝;;中國電力行業(yè)可持續(xù)發(fā)展研究[J];環(huán)境科學(xué)與管理;2007年08期
2 唐健;張婷;曾鳴;;基于改進(jìn)的模糊層次分析法的供電企業(yè)服務(wù)補(bǔ)救質(zhì)量綜合評價[J];電力技術(shù)經(jīng)濟(jì);2007年05期
3 楊衛(wèi)紅;何永秀;李德智;李艷;李芙蓉;;模糊區(qū)間評價與層次分析相結(jié)合的電網(wǎng)改造項目綜合后評估方法[J];電網(wǎng)技術(shù);2009年05期
4 劉培哲;可持續(xù)發(fā)展理論與《中國21世紀(jì)議程》[J];地學(xué)前緣;1996年01期
5 韋鋼;吳偉力;胡丹云;劉佳;;電力投資項目經(jīng)濟(jì)效益評價方法的比較[J];上海電力學(xué)院學(xué)報;2007年01期
6 鄭燕,王敬敏,鄭紹欣;在項目后評價中運用層次分析法確定指標(biāo)的權(quán)值[J];華北電力大學(xué)學(xué)報;2004年02期
7 竹隰生,陳汝均,任宏;建設(shè)項目可持續(xù)發(fā)展評價及其應(yīng)用模式研究[J];重慶建筑大學(xué)學(xué)報;2002年02期
8 韓敏;宋秀莉;崔和瑞;;電力行業(yè)可持續(xù)發(fā)展的對策研究[J];經(jīng)濟(jì)論壇;2008年05期
9 黃灝然;俞守華;周玉意;;基于AHP的模糊綜合評價方法在方案評價中的應(yīng)用[J];價值工程;2007年01期
10 李振宇;江偉;;輸變電項目后評價指標(biāo)體系構(gòu)建[J];科技信息;2009年15期
相關(guān)博士學(xué)位論文 前3條
1 黃德春;投資項目后評價理論、方法及應(yīng)用研究[D];河海大學(xué);2003年
2 鄭小晴;建設(shè)項目可持續(xù)性及其評價研究[D];重慶大學(xué);2005年
3 鄭燕;電力投資項目后評價研究及應(yīng)用[D];華北電力大學(xué)(河北);2007年
相關(guān)碩士學(xué)位論文 前8條
1 馮茂森;電力建設(shè)項目后評價研究[D];天津大學(xué);2010年
2 陳剛;投資項目后評價研究[D];重慶大學(xué);2004年
3 柴中華;電力項目后評價理論、方法及應(yīng)用研究[D];河海大學(xué);2007年
4 王國威;電網(wǎng)建設(shè)項目可持續(xù)發(fā)展后評價研究[D];華北電力大學(xué)(河北);2008年
5 劉彥斌;變電站建設(shè)項目經(jīng)濟(jì)效益后評價研究[D];華北電力大學(xué)(河北);2008年
6 吳淑芳;輸變電項目后評估體系研究[D];昆明理工大學(xué);2007年
7 張建明;輸變電工程項目經(jīng)濟(jì)效益后評價研究[D];華北電力大學(xué)(北京);2008年
8 鐘道奎;電網(wǎng)建設(shè)項目后評估研究[D];華北電力大學(xué)(北京);2009年
,本文編號:1846456
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1846456.html