中國石油山東淄博第69加油站項目后評價研究
本文選題:中國石油 切入點:加油站 出處:《中國石油大學(華東)》2013年碩士論文 論文類型:學位論文
【摘要】:項目后評價工作在整個項目周期中占據(jù)著重要的位置,,國內(nèi)各行業(yè)對項目后評價工作越來越重視,不斷加強項目后評價理論方法的研究和應用。2004年底,中國石油天然氣集團公司為提高加油站項目的項目管理水平和投資收益,提出了開展項目后評價工作的要求。但是在當前的石油企業(yè)中,很多企業(yè)開展的項目后評價工作都是簡化后評價,沒有對項目進行深入分析評價。本文旨在以中國石油山東淄博第69加油站為例,首先構(gòu)建一套完整的第69加油站項目后評價指標體系,然后對第69加油站開展詳細后評價,發(fā)現(xiàn)問題,為后期開發(fā)的加油站提供借鑒。 在對項目后評價工作相關(guān)理論進行深入研究的基礎(chǔ)上,結(jié)合加油站項目的實際情況,本文構(gòu)建了第69加油站項目后評價指標體系。在該套項目后評價指標體系中,設(shè)定了前期工作、建設(shè)實施、生產(chǎn)運行、投資與財務(wù)效益、影響與持續(xù)性五個一級評價指標,每一個一級評價指標下又設(shè)立了多項二級評價指標,通過利用層次分析法確定了各指標的權(quán)重。以構(gòu)建的第69加油站項目后評價指標體系為依據(jù),本文對第69加油站進行了詳細后評價,并利用成功度模糊綜合評價法對第69加油站進行了綜合后評價。通過對后評價結(jié)果的分析,總結(jié)第69加油站開發(fā)、建設(shè)、運營過程中存在的諸多問題,提煉出有代表性的問題,為后期開發(fā)的加油站提供借鑒,從而提高加油站項目的投資收益。
[Abstract]:Post-project evaluation occupies an important position in the whole project cycle. The domestic industries pay more and more attention to the post-project evaluation, and strengthen the research and application of the theory and method of post-project evaluation at the end of 2004. In order to improve the project management level and investment income of the gas station project, CNPC has put forward the request to carry out the post-project evaluation work. However, in the current oil enterprises, Many enterprises carry out post-project evaluation work is simplified post-evaluation, there is no in-depth analysis and evaluation of the project. The purpose of this paper is to take PetroChina Shandong Zibo No. 69 Gas Station as an example. Firstly, a complete post-evaluation index system of the 69th gas station project is constructed, and then the detailed post-evaluation of the 69th gas station is carried out to find out the problems, which can be used as a reference for the later development of the gas station. On the basis of deep research on the relevant theories of post-project evaluation, combined with the actual situation of the gas station project, this paper constructs the post-evaluation index system of the 69th gas station project. Five primary evaluation indicators, namely, pre-work, construction implementation, production operation, investment and financial benefits, impact and sustainability, have been set up, and several second-level evaluation indicators have been set up under each first-level evaluation index. The weight of each index is determined by using analytic hierarchy process. Based on the post-evaluation index system of the 69th gas station project, the detailed post-evaluation of the 69th gas station is carried out in this paper. Through the analysis of the results of the post-evaluation, many problems in the development, construction and operation of the No. 69 gas station are summarized, and the representative problems are extracted. To provide reference for the later development of the gas station, so as to improve the investment income of the gas station project.
【學位授予單位】:中國石油大學(華東)
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:F426.22
【參考文獻】
相關(guān)期刊論文 前10條
1 陳建設(shè);王曉東;韓武波;;國外項目后評價研究進展及其對我國土地整理項目后評價的啟示[J];國土資源科技管理;2008年02期
2 張禮安;李華啟;李剛;洪保民;;建設(shè)項目后評價方法和程序[J];國際石油經(jīng)濟;2005年11期
3 黃旭楠;李華啟;王錫柱;;油氣勘探項目后評價指標體系與定量化評價[J];國際石油經(jīng)濟;2010年01期
4 方興君;趙連增;杜敏;高軍;丁世強;;對改進投資項目后評價方法體系的探討[J];國際石油經(jīng)濟;2010年04期
5 高軍;高穎;;對成品油銷售網(wǎng)絡(luò)投資項目后評價指標體系構(gòu)建的探討[J];國際石油經(jīng)濟;2010年07期
6 牛東曉;李建青;;基于物元可拓模型的火電廠建設(shè)項目過程后評價研究[J];華北電力大學學報(自然科學版);2010年06期
7 丁海潮;陳惠玲;管殿聆;張偉;;城市基礎(chǔ)設(shè)施建設(shè)項目施工階段后評價及案例分析[J];建筑經(jīng)濟;2009年04期
8 王廣浩,周堅;項目后評價方法探析[J];科技進步與對策;2004年01期
9 杜靜;;對汶川震后恢復重建項目后評價工作的探討[J];科技進步與對策;2009年21期
10 王尊先;;基于成功度綜合評價模型的水電工程施工后評價[J];南水北調(diào)與水利科技;2008年05期
相關(guān)博士學位論文 前1條
1 楊文升;油氣田產(chǎn)能建設(shè)項目后評價研究[D];哈爾濱工程大學;2009年
本文編號:1604737
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1604737.html