武安煤矸石電廠工程建設(shè)項(xiàng)目進(jìn)度管理研究

發(fā)布時(shí)間:2018-01-19 07:06

  本文關(guān)鍵詞: 工程項(xiàng)目 建設(shè)進(jìn)度 進(jìn)度管理 出處:《華北電力大學(xué)》2013年碩士論文 論文類(lèi)型:學(xué)位論文


【摘要】:電能是現(xiàn)代社會(huì)經(jīng)濟(jì)發(fā)展的能源保證和動(dòng)力支持,為了滿足經(jīng)濟(jì)飛速發(fā)展對(duì)電能的大力需求,各大發(fā)電集團(tuán)對(duì)發(fā)電項(xiàng)目的建設(shè)投入了極大的熱情,使得電力工程建設(shè)項(xiàng)目的競(jìng)爭(zhēng)越來(lái)越激烈。武安煤矸石電廠屬于大型火電工程建設(shè)項(xiàng)目,任務(wù)繁重,工期緊張,為了保證項(xiàng)目順利完工,及早投產(chǎn),需要對(duì)影響進(jìn)度的成本因素、組織因素、質(zhì)量因素、風(fēng)險(xiǎn)因素等眾多影響因素進(jìn)行控制。 現(xiàn)代項(xiàng)目進(jìn)度管理不僅僅是對(duì)工期進(jìn)行管理,更重要的是在有限的資源約束下,對(duì)集成本、績(jī)效與工期為一體的總體目標(biāo)進(jìn)行管理,達(dá)到項(xiàng)目管理的最佳效果。同時(shí),項(xiàng)目管理不是一個(gè)機(jī)械的過(guò)程,在進(jìn)度計(jì)劃開(kāi)始執(zhí)行以后,需要及時(shí)收集并更新進(jìn)度情況信息,必要的時(shí)候?qū)τ?jì)劃進(jìn)行適當(dāng)?shù)卣{(diào)整,使得預(yù)期計(jì)劃與實(shí)際情況有機(jī)地統(tǒng)一起來(lái),,保證工程能夠順利地按期完成。 本文在現(xiàn)代項(xiàng)目管理理論的基礎(chǔ)上,分析了武安煤矸石電廠進(jìn)行進(jìn)度管理所采用的方法,探討了成本因素、組織因素、質(zhì)量因素以及風(fēng)險(xiǎn)因素對(duì)武安電廠進(jìn)度管理的影響機(jī)理,并針對(duì)不同的因素提出了相應(yīng)的一般控制方法。應(yīng)用模糊綜合評(píng)價(jià)法對(duì)武安電廠的進(jìn)度管理狀況進(jìn)行了綜合評(píng)價(jià),并就進(jìn)度管理方面的不足之處提出了進(jìn)度優(yōu)化的方法,在一定程度上對(duì)于火電建設(shè)項(xiàng)目甚至是其他領(lǐng)域的進(jìn)度管理具有借鑒意義。
[Abstract]:Electric energy is the energy guarantee and power support for the development of modern society and economy. In order to meet the rapid development of economy, the major power generation groups have invested great enthusiasm in the construction of power generation projects. Wuan coal gangue power plant belongs to the large thermal power project construction project, the task is heavy, the construction period is tight, in order to ensure the smooth completion of the project, the project is put into production as soon as possible. Need to control the cost factors, organizational factors, quality factors, risk factors and so on. Modern project schedule management is not only to manage the duration of the project, but also to manage the overall goal of integration, performance and duration under the constraints of limited resources. To achieve the best results of project management. At the same time, project management is not a mechanical process, after the implementation of the progress plan, need to collect and update progress information. When necessary, the plan should be adjusted properly, so that the expected plan can be integrated with the actual situation, and the project can be completed on schedule. On the basis of modern project management theory, this paper analyzes the methods of schedule management in Wuan coal gangue power plant, and discusses the cost factors and organizational factors. The influence mechanism of quality factors and risk factors on schedule management of Wuan Power Plant. According to different factors, the corresponding general control method is put forward, and the fuzzy comprehensive evaluation method is applied to evaluate the progress management situation of Wuan Power Plant. The paper also puts forward the method of schedule optimization in the aspect of schedule management, which can be used as a reference for the progress management of thermal power construction projects and even other fields to a certain extent.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前9條

1 宋鐵,柴君;對(duì)我國(guó)工程項(xiàng)目管理的探討[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2004年01期

2 趙靜;張丹;;建筑工程施工影響因素的探討[J];經(jīng)營(yíng)管理者;2010年11期

3 程婷婷;陳偉亞;;IT項(xiàng)目管理中制約因素的分析和研究[J];甘肅農(nóng)業(yè);2006年03期

4 代永新,王運(yùn)敏,李如忠,孫政;尾礦庫(kù)工程管理系統(tǒng)[J];金屬礦山;2005年07期

5 王靜;;建設(shè)工程進(jìn)度管理的復(fù)雜系統(tǒng)設(shè)計(jì)[J];山西建筑;2011年28期

6 王鵬;李?lèi)?ài)彬;趙文闖;;“211工程”重點(diǎn)學(xué)科建設(shè)項(xiàng)目進(jìn)度管理研究[J];科技管理研究;2010年15期

7 馬國(guó)豐,屠梅曾,史占中,吳偉;基于關(guān)鍵鏈技術(shù)的項(xiàng)目進(jìn)度管理系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[J];上海交通大學(xué)學(xué)報(bào);2004年03期

8 周小橋;;項(xiàng)目管理工具系列談之八——活動(dòng)網(wǎng)絡(luò)圖:編排工作順序[J];項(xiàng)目管理技術(shù);2006年02期

9 魏波周;;淺談施工項(xiàng)目和進(jìn)度的管理[J];科技咨詢導(dǎo)報(bào);2007年10期

相關(guān)碩士學(xué)位論文 前3條

1 宮振清;龍山電廠工程建設(shè)項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2011年

2 李桂利;大連世達(dá)購(gòu)物廣場(chǎng)項(xiàng)目進(jìn)度管理研究[D];大連理工大學(xué);2005年

3 張秉權(quán);國(guó)華內(nèi)蒙古準(zhǔn)格爾電廠工程進(jìn)度管理研究[D];華北電力大學(xué)(河北);2008年



本文編號(hào):1443123

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1443123.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶562e2***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com