臨江66kvXG變電站工程成本控制研究
本文選題:臨江66kv + XG變電站 ; 參考:《吉林大學(xué)》2017年碩士論文
【摘要】:成本控制是項(xiàng)目管理的主要內(nèi)容之一。變電站工程項(xiàng)目在建設(shè)過(guò)程中由于工程組織結(jié)構(gòu)復(fù)雜、電氣化部分工程技術(shù)水平難度大要求高、工序復(fù)雜,施工影響因素眾多等原因,使得變電站建設(shè)的工程成本控制難度越來(lái)越大。在大多數(shù)的變電站工程的建設(shè)過(guò)程中,由于管理手段的落后,材料浪費(fèi)嚴(yán)重,人工成本超出預(yù)算,使得變電站項(xiàng)目的建設(shè)出現(xiàn)成本失控的局面。但是在競(jìng)爭(zhēng)激烈的環(huán)境之下,誰(shuí)能夠?qū)⒊杀窘档?管理控制在合理的范圍之內(nèi),誰(shuí)就能夠在激烈的競(jìng)爭(zhēng)環(huán)境中取得優(yōu)勢(shì)地位。所以本文以臨江66kvXG變電站工程為研究對(duì)象,對(duì)其建設(shè)過(guò)程中的成本管理進(jìn)行分析,找出其成本控制存在的問(wèn)題及存在問(wèn)題的原因,并根據(jù)原因和問(wèn)題總結(jié)出成本優(yōu)化的措施,從而為施工企業(yè)提高利潤(rùn)提供一定的有益借鑒。本文一共分為六大部分,第一部分簡(jiǎn)要概述了本論文的選題背景、研究意義和目的、國(guó)內(nèi)外在成本控制研究的理論成果和本文研究的方法和技術(shù)路線,從理論上的角度對(duì)項(xiàng)目的成本優(yōu)化控制進(jìn)行了一定的介紹;第二部分對(duì)文章涉及的概念進(jìn)行了介紹,主要是論述了項(xiàng)目管理和成本控制的概念及各自的特點(diǎn)和原則,另外還對(duì)項(xiàng)目成本優(yōu)化的理論基礎(chǔ)進(jìn)行了介紹,筆者認(rèn)為系統(tǒng)控制理論、動(dòng)態(tài)成本控制理論、全面成本管理理論和掙得值管理理論構(gòu)成了成本控制的理論基本;第三部分對(duì)XG變電站當(dāng)前的成本控制現(xiàn)狀予以介紹,指出存在的問(wèn)題,并深入剖析了其在成本控制上存在問(wèn)題的原因,從而為成本優(yōu)化的控制尋找依據(jù);第四部分以第三部分存在的問(wèn)題和產(chǎn)生問(wèn)題的原因?yàn)閰⒖?對(duì)變電站項(xiàng)目的成本控制進(jìn)行優(yōu)化,提出了優(yōu)化方案,包括優(yōu)化的基本原則和具體措施;第五部分則是方案落實(shí)的具體保障措施,從組織、績(jī)效管理和人員的培訓(xùn)三方面來(lái)展開(kāi)。經(jīng)過(guò)一系列的改進(jìn)優(yōu)化措施,成本控制基本能達(dá)到預(yù)定的目標(biāo),施工企業(yè)的利潤(rùn)得到提高。
[Abstract]:Cost control is one of the main contents of project management. In the construction process of substation project, the engineering organization structure is complex, the technical level of electrification part is very difficult, the working procedure is complicated, the construction influence factor is numerous and so on. It is more and more difficult to control the project cost of substation construction. In the construction process of most substation projects, due to the backwardness of management means, the serious waste of materials and the cost of labor exceeding the budget, the construction cost of substation project is out of control. But in the competitive environment, who can reduce the cost and control the management within a reasonable range, who will be able to gain an advantage in the fierce competitive environment. So this paper takes the Linjiang 66kvXG substation project as the research object, analyzes the cost management in the construction process, finds out the problems existing in the cost control and the causes of the problems, and sums up the cost optimization measures according to the reasons and problems. So as to improve the profits of construction enterprises to provide some useful reference. This paper is divided into six parts. The first part gives a brief overview of the background, significance and purpose of this paper, the theoretical results of cost control research at home and abroad, and the research methods and technical routes of this paper. In the second part, the concepts of project management and cost control are introduced, including the concepts of project management and cost control, as well as their characteristics and principles. In addition, the theoretical basis of project cost optimization is introduced. The author thinks that the theory of system control, dynamic cost control, total cost management and earned value management constitute the basic theory of cost control. The third part introduces the current status of cost control in XG substation, points out the existing problems, and deeply analyzes the causes of the problems in cost control, so as to find the basis for cost optimization control. The fourth part takes the problems in the third part and the causes of the problems as the reference to optimize the cost control of the substation project, and put forward the optimization scheme, including the basic principles and specific measures of optimization; The fifth part is the implementation of the specific protection measures, from the organization, performance management and personnel training to carry out three aspects. After a series of improvement and optimization measures, the cost control can basically reach the predetermined target, and the profit of the construction enterprise can be improved.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM63
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 何苗;劉志剛;;試論建設(shè)工程成本控制[J];價(jià)值工程;2011年18期
2 周付春;;淺談水利工程成本控制[J];中國(guó)水利;2013年22期
3 錢(qián)益東;工程成本控制小議[J];建設(shè)科技;2005年08期
4 林謀祥;;試論施工企業(yè)的工程成本控制與管理[J];有色冶金設(shè)計(jì)與研究;2006年05期
5 羅月華;;工程成本控制的重要性[J];山西建筑;2007年14期
6 劉金軍;;工程成本控制淺析[J];中國(guó)高新技術(shù)企業(yè);2007年11期
7 王小兵;;公路工程成本控制[J];山西建筑;2009年26期
8 王雨田;;談市政工程成本控制的“三大工作”[J];黑龍江科技信息;2009年35期
9 劉銳;劉勇;;淺談公路工程成本控制[J];內(nèi)蒙古科技與經(jīng)濟(jì);2010年08期
10 祝玉標(biāo);;建筑施工企業(yè)的工程成本控制與管理[J];江西建材;2010年02期
相關(guān)會(huì)議論文 前5條
1 李菲;李建永;;淺談工程成本控制的措施[A];土木建筑學(xué)術(shù)文庫(kù)(第14卷)[C];2010年
2 曹潔;閆麗紅;;施工企業(yè)項(xiàng)目部工程成本控制[A];土木建筑學(xué)術(shù)文庫(kù)(第16卷)[C];2012年
3 盧榮根;;施工班組建設(shè)與管理在工程成本控制中的作用[A];電網(wǎng)工程造價(jià)管理優(yōu)秀論文[C];2011年
4 李建永;李菲;;試論設(shè)計(jì)階段的工程成本控制[A];土木建筑學(xué)術(shù)文庫(kù)(第14卷)[C];2010年
5 張佳;張士強(qiáng);張金泉;;基于項(xiàng)目管理法下的爆破工程成本控制初探[A];第十一屆中國(guó)煤炭學(xué)會(huì)爆破學(xué)術(shù)會(huì)議論文集[C];2010年
相關(guān)重要報(bào)紙文章 前5條
1 張禎桂;強(qiáng)化工程成本控制 確保項(xiàng)目達(dá)標(biāo)[N];中華建筑報(bào);2007年
2 北京城建二公司 蒲江 周從亮;實(shí)現(xiàn)工程成本控制可采用分部分項(xiàng)核算法[N];中國(guó)建設(shè)報(bào);2012年
3 尚云功 艷梅;馬萊工程指揮部工程成本控制經(jīng)驗(yàn)獲好評(píng)[N];中華建筑報(bào);2007年
4 記者 魏志俊;加強(qiáng)工程成本控制 保證施工質(zhì)量安全 建設(shè)精品示范工程[N];馬鞍山日?qǐng)?bào);2012年
5 衡水市市政工程管理處 王鐵彬;市政工程成本控制探討[N];大眾科技報(bào);2006年
相關(guān)碩士學(xué)位論文 前10條
1 孫玉民;乳山東崮110千伏變電站工程成本控制實(shí)證研究[D];華北電力大學(xué);2015年
2 李朝瑞;新建110kV變電站項(xiàng)目工程成本控制研究[D];華北電力大學(xué);2015年
3 劉函玫;EPCM模式的石化工程成本控制研究[D];浙江大學(xué);2015年
4 冀小璇;市政管道工程成本控制研究[D];蘭州交通大學(xué);2016年
5 尹志恒;臨江66kvXG變電站工程成本控制研究[D];吉林大學(xué);2017年
6 唐榮君;湘江長(zhǎng)沙綜合樞紐工程成本控制研究[D];中南大學(xué);2013年
7 譚鋒;電信運(yùn)營(yíng)企業(yè)傳輸工程成本控制研究[D];北京郵電大學(xué);2008年
8 王玉良;工程成本控制研究[D];河北工業(yè)大學(xué);2006年
9 王健;MDS公司總承包工程成本控制研究[D];安徽大學(xué);2013年
10 周桂全;通信工程成本控制研究[D];暨南大學(xué);2003年
,本文編號(hào):1817687
本文鏈接:http://sikaile.net/guanlilunwen/jixiaoguanli/1817687.html