大型公共工程項(xiàng)目,large public engineering project,音標(biāo),讀音,翻譯,英文
本文關(guān)鍵詞:大型工程項(xiàng)目管理的中國特色及與美蘇的比較,由筆耕文化傳播整理發(fā)布。
您的位置:首頁 -> 詞典 -> 大型公共工程項(xiàng)目
1) large public engineering project
大型公共工程項(xiàng)目
1.
Decision making of the large public engineering project based on the analysis of entropy weight;
基于熵權(quán)分析的大型公共工程項(xiàng)目決策
更多例句>>
2) large construction project company
大型建設(shè)工程項(xiàng)目公司
例句>>
3) public project
公共工程項(xiàng)目
1.
The differences between the public project and the private project come to decide that they have not the same factors during the evaluation.
公共工程項(xiàng)目與私人工程項(xiàng)目的不同點(diǎn)決定了其相關(guān)評價(jià)要素的特殊性。
2.
With the rapid development of our society and economy, there is urgent demand for public projects such as infrastructure; yet, we have been confronted with difficulties to achieve the goal, as the traditional mode of running a public project only by the central or local government.
社會(huì)經(jīng)濟(jì)的發(fā)展對基礎(chǔ)設(shè)施等公共工程項(xiàng)目建設(shè)有迫切的需求,但公共工程項(xiàng)目由國家單一投資,由政府組織建設(shè)的傳統(tǒng)模式,難以滿足這一需求,因此值得去探索通過借鑒PFI等國際先進(jìn)管理方法,建立吸收非政府的多渠道來源資金的公共項(xiàng)目建設(shè)模式的問題。
3.
It is necessary and feasible to conduct performance evaluation of public project expenditure as the proportion of public project expenditure in government finance is becoming greater and greater.
由于公共工程項(xiàng)目支出在政府財(cái)政中所占的比重越來越大 ,開展公共工程項(xiàng)目支出績效評估就具有其必要性和可行性 ,但我國公共工程項(xiàng)目支出績效評估的發(fā)展尚處于初級階段 ,在公共工程項(xiàng)目支出績效評估的制度、機(jī)構(gòu)、程序等方面都存在許多問題。
更多例句>>
4) large-scale public project
大型公共項(xiàng)目
1.
During the operation process of large-scale public project,financing risk is a main factor to the success of project.
在大型公共項(xiàng)目的運(yùn)作過程中,融資已經(jīng)成為解決資金缺口的主要手段。
更多例句>>
5) large engineering projects
大型工程項(xiàng)目
1.
The feasibility research on large engineering projects may have great influence on the national economy, and deep impact on the society, economy, politics and culture.
大型工程項(xiàng)目的可行性研究事關(guān)國計(jì)民生,對社會(huì)、經(jīng)濟(jì)、政治和文化有著深遠(yuǎn)影響。
更多例句>>
6) large-scale project
大型工程項(xiàng)目
1.
Application of network method in power demand for large-scale projects;
網(wǎng)絡(luò)法在大型工程項(xiàng)目電力使用中的應(yīng)用
2.
Application of network method in power demand of large-scale projects;
網(wǎng)絡(luò)法在大型工程項(xiàng)目電力使用計(jì)劃中的應(yīng)用
3.
The Chinese Characteristics of Large-Scale Projects Management and its Comparison with US and USSR
大型工程項(xiàng)目管理的中國特色及與美蘇的比較
更多例句>>
補(bǔ)充資料:工程項(xiàng)目監(jiān)理
工程項(xiàng)目監(jiān)理 工程監(jiān)理是指由獨(dú)立的、專業(yè)化的社會(huì)監(jiān)理單位,受業(yè)主(或投資者)的委托,對項(xiàng)目建設(shè)全過程實(shí)施的一種專業(yè)化管理。其內(nèi)容主要是根據(jù)委托者的需要,對項(xiàng)目建設(shè)的過程進(jìn)行監(jiān)督管理,可以包括項(xiàng)目建設(shè)前期的可行性研究及項(xiàng)目評估、實(shí)施階段的招投標(biāo)、勘察、設(shè)計(jì)、施工等。
說明:補(bǔ)充資料僅用于學(xué)習(xí)參考,,請勿用于其它任何用途。
本文關(guān)鍵詞:大型工程項(xiàng)目管理的中國特色及與美蘇的比較,由筆耕文化傳播整理發(fā)布。
本文編號:184434
本文鏈接:http://sikaile.net/guanlilunwen/gongchengguanli/184434.html