建設(shè)單位對建設(shè)工程合同管理的研究
[Abstract]:The construction unit entrusts the design, consultation, geological prospecting, construction and other work of the building project to the participating unit of the project to complete. A project basically takes one to several years to complete, while the project participation unit (the design unit, the consulting unit), Geological prospecting units, construction units, etc.) is to do many projects in one year. In the process of transformation from planned economy to market economy in the construction market, there is no division of responsibility and power between the construction unit and the participating unit for a period of time, and the construction project management has no rules to follow. The construction engineering market is a seller's market. When the construction unit chooses to participate in the construction unit, it considers itself to be in an active position. There are two unscientific phenomena at this time: first, the construction unit allows the participating unit to underlay the construction project. The overbearing clause appears in the construction project contract, and the project participating unit reduces the normal investment in the process of the project construction for the profit of the enterprise, which reduces the quality of the project. Construction units think they're taking advantage, but they actually get it at the expense of the quality of the product. Second, due to the limited professional and technical personnel, the management ability of the construction unit is not as good as that of the project participating unit, the management of the construction project contract is too passive, the opportunity of claim for compensation by the participating unit is many, the project investment is too large, and the project cost is unscientific and economical. After the construction unit is determined, the construction unit is often in a passive position because of its lack of experience and policy. The quality, progress and cost of the project are basically determined by the construction unit. Based on the analysis and research of the present situation of construction project contract management, this paper will sum up the deficiency of construction engineering contract management from the angle of construction unit, and point out the importance of construction engineering contract management. In the whole process of engineering construction, the connotation of construction contract in different stages is analyzed, the methods and contents of contract management are further studied, and the construction process is described and analyzed by fuzzy hierarchy method. Practical measures to ensure that the construction unit through contract management to achieve project quality, progress, cost expected results. By studying the project contract from the point of view of the construction unit and finding out the systematic management method, the construction unit can control the quality and progress of the project scientifically and reasonably under the condition of less management personnel and unskilled policy. Safety and civilization construction and cost have certain guiding significance.
【學(xué)位授予單位】:武漢工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU723.1
【相似文獻】
相關(guān)期刊論文 前10條
1 于暉,徐立斌,陳利公;淺議建設(shè)單位與監(jiān)理單位的關(guān)系[J];黑龍江水專學(xué)報;2000年03期
2 胡建漢;建設(shè)單位如何適應(yīng)入世環(huán)境[J];工程建設(shè)與設(shè)計;2003年01期
3 劉勇 ,林曉鶯;鐵道部重申建設(shè)單位不準(zhǔn)經(jīng)辦多經(jīng)技協(xié)等業(yè)務(wù)[J];鐵道運輸與經(jīng)濟;2005年10期
4 李海濤;;進一步強化建設(shè)單位安全主體責(zé)任的建議[J];重慶科技學(xué)院學(xué)報(社會科學(xué)版);2011年10期
5 劉暢;;關(guān)于如何加強建設(shè)單位資金管理的思考[J];當(dāng)代經(jīng)濟;2011年20期
6 陳之泉;如何加強對建設(shè)單位的管理[J];建筑;1995年12期
7 董學(xué)成;也談建設(shè)單位駐工地代表職責(zé)[J];建筑;1996年06期
8 黃夢林;對建設(shè)單位也應(yīng)該管一管[J];工程質(zhì)量管理與監(jiān)測;1997年02期
9 張振剛;;市政建設(shè)單位創(chuàng)建文明工地活動的行業(yè)特色[J];當(dāng)代建設(shè);1998年04期
10 朱麗嫻;;關(guān)于加強建設(shè)單位經(jīng)營管控的措施探析[J];企業(yè)導(dǎo)報;2014年09期
相關(guān)會議論文 前10條
1 劉勇;林曉鶯;;鐵道部重申建設(shè)單位不準(zhǔn)經(jīng)辦多經(jīng)技協(xié)等業(yè)務(wù)[A];第十二屆鐵路站場樞紐學(xué)術(shù)研討會論文集[C];2005年
2 高昂;;淺談建設(shè)單位的現(xiàn)場管理[A];土木建筑學(xué)術(shù)文庫(第15卷)[C];2011年
3 張勝偉;張海亮;李忠;;規(guī)范建設(shè)單位行為 確保建設(shè)工程質(zhì)量[A];土木建筑學(xué)術(shù)文庫(第9卷)[C];2008年
4 溫紅運;王鑫;;建設(shè)單位在降低工程項目造價中的風(fēng)險管理[A];土木建筑學(xué)術(shù)文庫(第10卷)[C];2008年
5 陳宇;;我國建設(shè)單位在住宅工程中質(zhì)量安全主體責(zé)任的研究[A];第六屆全國土木工程研究生學(xué)術(shù)論壇論文集[C];2008年
6 王明浩;;建設(shè)單位如何把好投資項目質(zhì)量關(guān)[A];河南省土木建筑學(xué)會2009年學(xué)術(shù)年會論文集[C];2009年
7 孫輝;;淺議建設(shè)單位應(yīng)如何加強建設(shè)項目全過程的投資控制與管理[A];中國有色金屬建設(shè)協(xié)會2004優(yōu)秀技術(shù)管理論文評選論文集[C];2004年
8 李振松;;淺談建設(shè)單位對工程項目的質(zhì)量控制[A];河南省土木建筑學(xué)會2008年學(xué)術(shù)交流會論文集[C];2008年
9 王正峰;杜學(xué)瑞;牛志剛;;淺談建設(shè)單位的工程管理[A];土木建筑學(xué)術(shù)文庫(第9卷)[C];2008年
10 楊向榮;曹文銜;;工程未經(jīng)驗收提前使用的質(zhì)量損害賠償責(zé)任[A];中國民商法實務(wù)論壇論文集[C];2001年
相關(guān)重要報紙文章 前10條
1 劉琴;2007年度42所國家示范性高職立項建設(shè)單位確定[N];中國教育報;2007年
2 王冬建;東莞減輕建設(shè)單位項目報批負擔(dān)[N];中國建設(shè)報;2009年
3 ;大連市“十一五”信息化建設(shè)優(yōu)秀項目、先進單位表彰名單[N];大連日報;2011年
4 記者 蘇莉;長沙建設(shè)單位 未按規(guī)定移交檔案將受罰[N];湖南日報;2010年
5 關(guān) 力;大連審計督促建設(shè)單位加強項目管理[N];中國審計報;2005年
6 檀勇;嚴(yán)禁建設(shè)單位壓縮合理工期[N];建筑時報;2007年
7 記者 袁弘;建設(shè)單位挖深坑 必須邊挖邊監(jiān)測[N];成都日報;2009年
8 姜敏;加強質(zhì)量安全監(jiān)管一個都不能少[N];中國建設(shè)報;2009年
9 通訊員 李承錦 記者 肖樹臣;鄭州:建設(shè)單位開工前要為勞動者繳納社保費[N];工人日報;2010年
10 李海燕;天津:建設(shè)單位和開發(fā)商拖欠工程款將被曝光[N];中華建筑報;2006年
相關(guān)碩士學(xué)位論文 前10條
1 楊銘哲;建設(shè)單位工程造價管理與對策研究[D];鄭州大學(xué);2015年
2 楊翠萍;建設(shè)單位對建設(shè)工程合同管理的研究[D];武漢工程大學(xué);2014年
3 朱靜謙;建設(shè)單位實施價值管理的思考與對策[D];南昌大學(xué);2014年
4 王雅嬋;建設(shè)單位項目質(zhì)量管理研究[D];天津大學(xué);2014年
5 楊翠萍;建設(shè)單位對建設(shè)工程合同管理的研究[D];武漢工程大學(xué);2014年
6 劉平;建設(shè)單位內(nèi)部控制研究[D];四川大學(xué);2006年
7 普布次仁;西藏公路建設(shè)單位內(nèi)部會計控制研究[D];西南財經(jīng)大學(xué);2011年
8 陳鋼;我國鐵路工程項目質(zhì)量控制研究[D];中南大學(xué);2010年
9 李紅瑛;工程項目內(nèi)部會計控制問題研究[D];長沙理工大學(xué);2006年
10 曹明閣;建設(shè)工程項目內(nèi)部會計控制研究[D];東北石油大學(xué);2010年
,本文編號:2426992
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2426992.html