信息化環(huán)境下基于位置的建設(shè)工程施工管理方法應(yīng)用研究
[Abstract]:At present, the construction industry has entered the "new normal." How to maintain the advantage of enterprises and maintain the sustainable development of enterprises has become a problem that must be solved by construction enterprises. However, the unreasonable allocation of resources in the construction stage, the discontinuity of construction activities, the conflict of workspace between different project participants and the scramble of different working faces lead to the frequent delay of progress. This will not only bring challenges to the construction management of construction projects, but also lead to late delivery of projects and increase in cost, and may also cause problems of engineering quality and waste of a large number of social resources. Moreover, in the construction stage of domestic construction projects, the level of engineering information management is generally poor, a large number of related engineering information does not serve the construction management of construction projects well, because of the information omission, the information is wrong. Conflicts and contradictions caused by information processing are common, which leads to low productivity in construction stage. Improving the management efficiency of construction enterprises in the construction stage, optimizing the schedule management in the construction stage, and improving the level of information management and resource management in the construction stage are not only related to the efficiency of the enterprise in the construction phase of the construction project. It is also the key for enterprises to maintain competitive advantage under the "new normal". The construction management method based on position is a new construction management method. This method provides a new method for solving the problems of low efficiency and waste in construction stage of construction projects in China. The construction management method based on location pays attention to the time management and the resource management, so it can make up for the deficiency of the existing methods. The construction information technology, represented by the building information model, has improved the level of the construction information and provided a new technical means for the construction enterprises to maintain their competitive advantage under the "new normal". It can also work well with the construction management method based on location in schedule management and cost management. But compared with the developed countries, the domestic industry, academic circles pay little attention to this method. Moreover, there is still room for improvement in the degree of synergy between the space resource management and the building information model technology. This paper expounds the concept and theory of the construction management method based on location, and compares it with the traditional construction management method such as the critical path method. This paper analyzes the data management characteristics and requirements of the construction management method based on location, and puts forward and discusses that the method and the building information model technology can cooperate well in the aspect of schedule management and cost management in the information environment. The argument that the construction management method based on location has more advantages in the information environment; On the basis of this, the paper puts forward the method of combining the construction management method based on location and the building information model technology in space resource management, and puts forward the space resource management flow based on this method. Finally, the paper verifies the application effect of the construction management method based on location through the case simulation. It is proved that the space resource management method based on location and construction information model technology is effective.
【學(xué)位授予單位】:重慶大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2016
【分類號】:TU71
【參考文獻】
相關(guān)期刊論文 前10條
1 陳艷;陳浩;;中國建筑業(yè)2015年前三季度發(fā)展報告[J];建筑;2015年23期
2 郭承武;;PDCA循環(huán)在EPC工程項目管理中的運用[J];招標采購管理;2014年06期
3 謝洪濤;;整合LOB與CPM的重復(fù)性項目調(diào)度方法研究[J];項目管理技術(shù);2013年08期
4 孔睿;李稻葵;吳舒鈺;;資本形成效率探究[J];投資研究;2013年04期
5 李嵐;;工程項目流水施工網(wǎng)絡(luò)計劃特殊問題實證研究[J];建筑經(jīng)濟;2013年03期
6 胡振中;陳祥祥;王亮;余芳強;王興坡;;基于BIM的機電設(shè)備智能管理系統(tǒng)[J];土木建筑工程信息技術(shù);2013年01期
7 黃承亮;向娟;;三維激光掃描技術(shù)應(yīng)用于建筑物建模的測量方法研究[J];城市勘測;2011年01期
8 張建平;韓冰;李久林;盧偉;;建筑施工現(xiàn)場的4D可視化管理[J];施工技術(shù);2006年10期
9 徐壽波;;生產(chǎn)要素六元理論[J];北京交通大學(xué)學(xué)報(社會科學(xué)版);2006年03期
10 張正峰;付金強;吳康新;張發(fā)瑜;;基于4D CAD的大型橋梁施工進度系統(tǒng)仿真研究[J];中國工程科學(xué);2006年01期
相關(guān)博士學(xué)位論文 前2條
1 滿慶鵬;建筑施工進度計劃建模與控制方法研究[D];哈爾濱工業(yè)大學(xué);2008年
2 盧偉倬;建設(shè)項目工作流精益管理研究[D];哈爾濱工業(yè)大學(xué);2008年
,本文編號:2418266
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2418266.html